Text
..
.~
I J
~
Wisconsin Electric Power Company Docket-Nos.
50-266; 50-301 Point Beach Nuclear Plant License Nos. DPR-24; DPR-27 During an NRC inspection conducted from April 1 through fiay 24, 1993, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions", 10 CFR Part 2, Appendix C, the violation is listed below:
10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requires in part that conditions adverse to quality, such as malfunctions and deviations, be promptly identified and corrected.
For significant conditions, established i
measures shall assure that the cause of the condition-is determined and corrective action taken to preclude repetition.
The identification of significant conditions shall be documented and reported to appropriate levels of management.
1.
Contrary to the above, on or about April 20, 1993, a failure of the emergency diesel generator fuel oil sump level control switch was not documented and reported to appropriate levels of management.
(266/93009-OlA) 2.
Contrary to the above, on April 8, 1993, inadequate corrective actions were taken to preclude repetition of not maintaining the temporary third door to the Unit 1 containment personnel hatch closed during refueling operations.
(266/93009-01B)
This is a Severity Level IV violation (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, Wisconsin Electric is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555, i
with a copy to the Regional Administrator, Region III, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this
)
Notice. This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or if contested, the basis for disputing the violation; (2) corrective action taken and the results achieved; (3) corrective action to be taken to avoid further violatiens; and'(4) the date when full compliance will be achieved.
Where good cause is shown, consideration may be given to extending your response time.
' N
..J
)
O M
Dated at Glen Ellyn, Illinois L. Rober M r, Chief this H_ day of June, 1993 Reactor Projects Branch 3
~
.l 9306220085 930611 PDR ADOCK 05000266
-l 0
PDR l
~.
. - -..