June 10, 1993 Docket Nos. 50-269, 50-270 and 50-287 Mr. J. W. Hampton Vice President, Oconee Site Duke Power Company P. O. Box 1439 Seneca, South Carolina 29679
Dear Mr. Hampton:
SUBJECT:
REVISED RESPONSE TO NRC BULLETIN 88-04, SAFETY-RELATED PUMP LOSS
.p (TACS NOS. M85334/M85335/M85336)
^
In a letter dated October 14, 1992, we requested a corrected response to NRC Bulletin 83-04, due to apparent errors in the original responn related to operation of the Low Pressure Service Water (LPSW) pumps.
By letter dated January 7, 1993, you provided a revised response as requested.
In your letter, you described your actions in evaluating the effect on the LPSW pumps if operated in a deadheaded condition.
In this evaluation, it was determined that such operation could result in accelerated wear of pump internals, but would not lead to immediate failure of the pump.
You stated that procedural guidance had been developed to ensure that the LPSW pumps would not be exposed to extended operation in deadheaded conditions.
The NRC staff has reviewed your revised response and has determined that the use of plant operating procedures to prevent deadheading the LPSW pumps represents an acceptable resolution of this issue for the LPSW pumps. This completes our action under TACs M85334, M85335, and M85336.
If you have questions regarding this matter, contact me at (301) 504-1495.
Sincerely,
/s/
L. A. Wiens, Project Manager l
Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
DMatthews iDocket: File.
LWiens NRC & Local PORs LBerry PDII-3 R/F OGC, 15B18 SVarga ACRS (10), P-135 i
Glainas EMerschoff, RII d
PDII-3/llh k)kk/PM D:Phh 5 8cE i
LBERRYkk LWIENS:cw DMANEWS l
/1/93
[/@/93
[p //l)/93 I
-l WE OFFICIAL RECORD COPY FILE NAME: G:\\0CONEE\\85334.GL yy -
!jr ha S.;
'l 4
9306180217 930610
}
1 PDR ADOCK 05000269 t
P PDR
}
June 10,1993 Docket Nos. 50-269, 50-270 l
and 50-287 Mr. J. W. Hampton Vice President, Oconee Site Duke Power Company 4
P. O. Box 1439 Seneca, South Carolina 29679
~
Dear Mr. Hampton:
^
SUBJECT:
REVISED RESPONSE TO NRC BULLETIN 88-04, SAFETY-RELATED PUMP LOSS (TACS NOS. M85334/M85335/M85336) i In a letter dated October 14, 1992, we requested a corrected response to NRC Bulletin 88-04, due to apparent errors in the original response related to operation of the Low Pressure Service Water (LPSW) pumps.
By letter dated January 7, 1993, you provided a revised response as requested.
In your letter, you described your actions in evaluating the effect on the LPSW pumps if sperated in a deadheaded condition.
In this evaluation, it was determined-I that such operation could result in accelerated wear of pump internals, but l
would not lead to immediate failure of the pump. You stated that procedural guidance had been developed to ensure that the LPSW pumps would not be exposed to extended operation in deadheaded conditions.
The NRC staff has reviewed your revised response and has determined that the I
use of plant operating procedures to prevent deadheading the LPSW pumps represents an acceptable resolution of this issue for the LPSW pumps. This completes our action under TACs M85334, M85335, and M85336.
If you have questions regarding this matter, contact me at (301) 504-1495.
~
Sine ~ely, L
A. w n, Project Manager Pi *ct
- actorate II-3 j
Divis.. or neactor Projects - I/II 1
Office of Nuclear Reactor Regulation j
cc: See next page DISTRIBUTION:
DMatthews
}
Docket File LWiens NRC & Local PDRs LBerry PDII-3 R/F OGC, 15B18 i
SVarga ACRS (10), P-135
.i Glainas-EMerseboff, RII
[ j /,
PDII-3/L h hh/PM NNi f
m ice D:
LBERRYkk LWIENS:cw DMAYHEWS ME
_r/l/93
[/8/93
[p //8/93 j
WE -
OFFICIAL RECORD COPY FILE NAME:
G:\\0CONEE\\85334.GL t
l
pa alcug 7
?*
UNITED STATES
[ [i(jiiC j
NUCLEAR REGULATORY COMMISSION
- i-WASHINGTON. D.C. 20556-0001
%;..../
June 10, 1993 5
Docket Nos. 50-269, 50-270 and 50-287 Mr. J. W. Hampton Vice President, Oconee Site Duke Power Company P. O. Box 1439 Seneca, South Carolina 29679
Dear Mr. Hampton:
SUBJECT:
REVISED RESPONSE TO NRC BULLETIN 88-04, SAFETY-RELATED PUMP LOSS (TACS NOS. M85334/M85335/M85336)
In a letter dated October 14, 1992, we requested a corrected response to NRC Bulletin 88-04, due to apparent errors in the original response related to operation of the Low Pressure Service Water (LPSW) pumps.
By letter dated January 7, 1993, you provided a revised response as requested.
In your letter, you described your actions in evaluating the effect on the LPSW pumps if operated in a deadheaded condition.
In this evaluation, it was determined that such operation could result in accelerated wear of pump internals, but would not lead to immediate failure of the pump.
You stated that procedural guidance had been developed to ensure that the LPSW pumps would not be exposed to extended operation in deadheaded conditions.
The NRC staff has reviewed your revised response and has determined that the use of plant operating procedures to prevent deadheading the LPSW pumps represents an acceptable resolution of this issue for the LPSW pumps. This completes our action under TACs M85334, M85335, and M85336.
If you have questions regarding this matter, contact me at (301) 504-1495.
Sincerely,.
(D L. A. Wiens, Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
See next page
kh Mr. J. W. Hampton Duke Power Company Oconee Nuclear Station CC:
Mr. A. V. Carr, Esquire Mr. M. E. Patrick Duke Power Company Compliance 422 South Church Street Duke Power Company Charlotte, North Carolina 28242-0001 Oconee Nuclear Site P. O. Box 1439 J. Michael McGarry, III, Esquire Seneca, South Carolina 29679 Winston and Strawn 1400 L Street, NW.
Mr. Alan R. Herdt, Chief Washington, DC 20005 Project Branch #3 U. S. Nuclear Regulatory Commission Mr. Robert B. Borsum 101 Marietta Street, NW. Suite 2900 Babcock & Wilcox Atlanta, Georgia 30323 Nuclear Power Division Suite 525 Ms. Karen E. Long 1700 Rockville Pike Assistant Attorney General Rockville, Maryland 20852 North Carolina Department tf Justice Manager, LIS P. O. Box 629 NUS Corporation Raleigh, North Carolina 27602 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Mr. G. A. Copp Licensing - EC050 Senior Resident Inspector Duke Power Company U. S. Nuclear Regulatory Commission P. O. Box 1006 Route 2, Box 610 Charlotte, North Carolina 28201-1006 Seneca, South Carolina 29678 Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 Atlanta, Georgia 30323 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Office of Intergovernmental Relations 116 West Jones Street Raleigh, North Carolina 27603 County Supervisor of Oconee County Walhalla, South Carolina 29621