Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
~
Wisconsin
' Electnc '
POWER COMPANY 6
23 w regan pc to 2:es wwoe e s32:e gui2:42345 VPNPD-93-095 NRC-93-057 May 7, 1993 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C. 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPOPTS POINT BEACH NUCLEAR PL'iT, UNITS 1 AND 2 1
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 1993.
Sincerely,
, [
Bob Link Vice President l Nuclear Power MFB/jg cc: L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector I
f l Y M j I
9305140291 930430 / /g !
I PDR ADDCK 05000266 / // .!
R PDR Y }
A sulukgafHiwonsm EncyGepwkm
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 05/03/93 COMPLETED BY: Richard F. Arnold TELEPHONE: (414) 755-6193 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES .
- 2. REPORTING PERIOD: April - 1993 . .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .
- 6. KAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . , . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAP TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,879.0 181,872.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,866.7 159,142.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 4.0 233.9
- 14. HOURS GENERATOR ON LINE 719.0 2,858.3 156,840.8 i
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,073,515 4,259,587 224,905,848
- 17. GROSS ELECTRICAL ENERGY GENERATED 368,580 1,461,810 76,461,930
- 18. NET ELECTRICAL ENER0Y GENERATED (MWH) 352,928 1,400,027 72,886,434
- 19. UNIT SERVIta FACTOR 100.0% 99.3% 86.2%
- 20. UNIT AVAILABILITY FACTOR 100.0% 99.3% 86.4%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.2% 100.3% 82.0% ,
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.8% 97.8% 80.6%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.7% 1.0%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage, 09/25/93, 50 Days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: I NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 0
0
+ - - . , ,
. - . - . - . ~ .. ._ . . - . - . - --. .. . . - . . -
POINT BEACH NUCLEAR PLANT >>CKET NO, 50-301 AVERAGR DAILY UNIT POWER I.EVEL UNIT NAME Point Beach. Unit 2 MONTil APRIL - 1993 DATE May 1.1993 COMPLETED BY R. F. Amold TELEPflONE 414r7554193 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAX MWe NET DAX MWe NET DAX MWe NET 1 449 11 496 21 499 2 418 12 494 22 491 3 495 13 494 23 495 4 498 14 498 24 496 5 490 15 492 25 496 6 494 16 495 26 4%
7 494 17 495 27 495 8 494 ad 495 28 496 9 4% 19 494 29 496 10 493 20 495 30 496 PBFM28a mm
... - . - . . . . . . . _ . ..- -.. ._ - . .. . ._ .- - .. . . - ~ . . .. .. .- - .. .
POINT BEACil NUCLEAR PLANT Docket No, 50-301
. Unit Name Point Beach. Unit 2 IINIT SilllTDOWNS AND POWER REDUCTIONS Date hiav 1.1993 _
Completed By R. F. Amold REPORT MONTil _ APRII. - 1993 Telephone No. 414n55-6191 Method of Shuning Duration Down Licenace Event Syncm Conponent Cause assJ Corrective Action No. Date Type' (llours) Reason p,,cis Report No. Code' Code' To Prevent Recurrence 2 4/1/93 F 0 F 5 NA lill IITEXCll Observed increano in modium icvwls in the steam generators initiated a load rcJuction to 300 MWo so facilitato condenaarinspection for tube leakage.
'F: Forced 2 Reawn: 'hiethod: ' Exhibit G - Instiuctions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry s! eess C - Refueling 3 - Automatic Scram LER tile (NilREG.0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Etam 5 - Reduced Ital 8
F - Administri.tive 6 - Othet (explain) Exhibit .e Source 0 - Operational Error (explain) 11 Other (explain) d 4 0
- PDF 4 )28b,
' (03-90) ,
+
DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE May 2, 1993 COMPLETED BY R. F. Arnold TELEPHONE 414/755-6193 Unit 2 operated at approximately 491 MWe net throughout the report period.
An observed increase in Unit 2 steam generator sodium levels initiated a load reduction to 300 MWE for approximately 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> to facilitate condensor waterbox inspection for tube leakage.
Licensee Event Report 301/93-002-00, Unit 2 Reactor Trip During Turbine Trip Tests, was submitted.
A Notice of Enforcement Discretion was received for Unit 2 to allow
- the postponement of certain surveillance testing while KNPP and PBNP Unit 1 are shutdown. <
The setpoints for the Unit 2 safeguards time delay relays which control the sageguards sequencing of the containment fan )
cooler motors were changed to meet the 60-second start time following the initiation of a design basis LOCA as described in FSAR.
Safety-related maintenance included:
- 1. Oil added to steam driven auxiliary feedwater pump (2P-29) governor.
- 2. Installad seismic bumpers for the lift indicating switch assembly (LISA) instrumentation in Unit 2 ASIP panel.
i I
OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 05/03/93 i
COMPLETED BY Richard F. Arnold l
TELEPHONE: (414) 755-6193 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .
- 2. REPORTING PERIOD: April - 1993 . .
- 3. LICENSED TiiERMAL POWER (MWT): 1518.5 . .
'4. NAMEPLATE RATING (CROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .
- 6. HAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY): ,
NA T!!IS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,879.0 197,087.0 12, NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,046.0 162,929.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3 l l
- 14. HOURS GENERATOR ON LINE 0.0 2,044.9 159,884.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 3,093,553 224,830,526
- 17. GROSS ELECTRICAL ENERGY GENERATED 0 1,046,540 75,922,940
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,001,206 72,353,369
- 19. UNIT SERVICE FACTOR 0.0% 71.0% 81.1%
- 20. UNIT AVAILABILITY FACTOR 0.0% 71.0% 81.6%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 71.7% 75.3%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 70.0% 73.9%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 1.6% '
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
05/08/93 DNTA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMDER 22, 1977 9
O
- b. _ . . _ _ _ _ . _ . _ _ __ _ _ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . .. . .
- . ]
s POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 _
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTil ' APRIL - 1993 DATE May 1.1993 COMPLETED BY R. P. Amold 1
i TELEPIlONE ~ 414n55-6193 AVERAGE AVERAGE AVERAGE 'l DAILY DAILY DAILY ' .
POWER LEVEL POWER LEVEL POWER LEVEL
. DAY MWe NET DAX MWe NET DAX MWe NET 1 -2 11 -2 21 -2 2 -2 12 -2 22 ,.
-2 3 -2 13 -2 23 -2 i
4 -2 14 -1 24 -1 5 -2 15 -2 25 -2 6 -2 16 -2 26 -2 7 -2 17 -2 27 -2 .
8 -2 18 -2 28 -2 9 -2 19 -2 29 -2 10 -2 20 -2 30 -2 ___
9 1
1 PB5M8a ~
(03-q 4
POINT BEACH NUCLEAR PLANT Docket No. = 50-266
. . . Unit Ncme Point Beach. Unit i UNIT SifUrDOWNS AND POWER REDUCT!ONS Date May 1.1993 Completed By R. F. Amold REPORT MONTil APRIL - 1993 - Telephone No. 414 055-6193 Method of shuning No. Date Type' Duration a manaa' Down Licanese Event System Componcat Caues and Corrective Action 1 3/27/93 S 720 C 1 Ni. NA NA Scheduled refbeling and maiwamaes outage (UlR20). Major work items inchie laTechna ggd eJJy currors testing of the steam generators, mechanical sad electrical upgrades of the anala steam isoinuon valves, installation of rod drop testing equipmens, angoscior upgrades for 480 V bus feeder and MG act breakars, P 30B circulation water pung 8 "T*~a" *ad **bdt electrical walkdowns of the reactor protection and safeguarde system.
1 i.
J
'F: Forced 2 Reason: ' Method: ' Exhibit 0 - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual ' for prelaration of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restricnon 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) 5 Exhibit ! - Same Source 0 - Operational Error (explain)
II - Other (explain)
Pae m ish
@J-90) ,
s DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE May 1, 1993 COMPLETED BY R. F. Arnold TELEPHONE 414/755-6193 Unit 1 was shutdown for refueling and maintenance outage (U1R20) for the month of April with zero electrical output.
Licensee Event Report 50-266 and 50-301/93-001-00, Nonconservative Setpoints For The Low Temperatu.e Overpressure System, was submitted.
The setpoints for the Unit 1 safeguards time delay relays which control the safeguards sequencing of the containment fan cooler motors were changed to meet the 60-second start time following the initiation of a design basis LCCA as described in FSAR.
Safety-related maintenance included:
- 1. Reconnected wire in main control board for the electric auxiliary feedwater pump control circuit. Wire was disconnected during as-built wire tracing work activity. All-wire lug connections in the Unit 1 main control board were check tightened.
- 2. Replaced residual heat removal pump seal and installed outer bearing race spacer.
- 3. Installed mechanical and electrical upgrades to the main steam isolation valves.
- 4. Installed a new disk in main steam isolation valve (MS-2017),
stelite face of disk was cracked.
- 5. Replaced solenoid valve on service water supply valve to radwaste steam systems (SW-LW-061).
- 6. Replaced air operator slide valve on containment purge supply valve (IliVPSE-3 24 4 ) .
- 7. Installed mechanical and electrical upgrades on the main steam isolation valves.
- 8. Installed bypass around mini-recirc control valve solenoid for IST required testing of steam driven auxiliary feedwater pump (1P-29).
u
'9. Installed 4 rotor limit switches on several safety-related MOVs.
- 10. Rebuilt' actuators and replaced tubing between the actuator and slide valve on the containment purge supply and exhaust valves.
I i
i
(
i 2