Forwards Insp Rept 50-325/73-06 on 731002-05.No Violations Disclosed
ML20044C485
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/29/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20044C467 List:
References
FOIA-92-569 NUDOCS 9303230109
Download: ML20044C485 (3)


See also: IR 05000325/1973006

Text

.

!

. -

I

.

.

,

l

!

l

i

In Reply Asfor To:

OCT 2 91973

RO II CRM

50-315/73-6

.

!

!

!

Carolina Power and Light Company

ATTW:

Mr. J. A. Jones

'

Senior Vice President

i

,

Engineering and Operating

i

'

336 Fayetteville Street

l

Raleigh, North Carolina

27602

Gentlemen:

$

i

This refers to the inspection conducted by Mr. W. D. Kalley of this

>

offica on october 2-5, 1973, of metivities authorised by AEC

l

'

Construction Permit No. . CPF1-68 for the Brunswick 1 facility, and

!

to the discussion of our findings held by Mr. Kalley with Mr. C. M.

'

Simpson at the conclusion of the inspection.

-!

l

l

Areas ex-inad during the inspection and our findings are discussed in the

[

enclosed inspection report. Within these areas, the inspection consisted

'

of selective examination of procedures and representative records,

i

'!

interviews w1th personnal, and observations by the inspector.

I

Within the scope of this inspection, no violations'were disclosed.

!

I

I

,

!

We have mummf ned actions you have taken with regard to previously reported

!

a resolved items. These are identified in Section IV of the summaary of the

.

4

smelosed report.

-

.

In accordance with Section 2.790 of the AEC's " Rules of Practies," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

'

enclosed inspection report will be placed in. the AEC's Pelic Doctament

-[

Room. If this twport contains any information that you believe to be

i

proprietary, it is ancessary that you submit a written application to

!

this office requesting that sud information be withheld from p411e -

!

disclosure. If no proprietary information is ' identified, a written

statement to that effect should be semitted.

If an application is

'

l

semitted, it must fully. identify the bases for which information .is

!

elaimsd to be proprietary. The application abould be prepared se that

!

!

information sought to be withheld is incorporated in a separate paper-

'

$

'

i

j

1

,

-

,

l

!

,

-

l

'

9303230109 930202

I

-

PDR

FDIA

O'MEALI92-569

PDR

[

-

-

_.

i

'

  • ~

Carelina Power and Light

-2-

t

OCT 2 91973

Company

,

,

'

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

i

should be submitted to us within 20 days. If we are not contacted as

specified, the enclosed report and this letter may then be pl. aced in the

Ptblic Docuraent Room.

)

Should you have any questions concerning this letter, we will be glad

l

to discuss them with you.

Very truly yours,

cr;a,a s<a 4 M-

.

n. c. W

!

j

Norman C. Nosaley

Director

l

Enclosure:

RO Inspection Esport No.

i

50-325/73-6

!

t

i

f

I

i

!

,

P

i

.

,

i

4

,

a

1

"

l

!

,

,

20t:11jy,..,MACggggggp

_ T ___g.

y

l

Jtodl

I.

E0;II

i

omet >

jlgd:pp bd p

f _. Y?%nem

i

.

lMa

$URMAMEkl

3

oaTr >

,

_,

,

_

10/AJ73

10/25/73

10/lf/73

10/25/73

.

~

f orm A1Ca t s (Rev. 9 53) ALCM 0240

    • o

.ss-no-easa6 s esa47s

.h

l

i

l

,

4

_

l.

.

i

.

Letter to Carolina Power and Light Company

'

dated

,

,

OCT 2 91973

DISTRIBUTION:

H. D. Thornburg, RO

RO:HQ (h)

'

'

Directorate of Licensing (k)

DR Central Files

,

'

J. R. Lundy, L

i

  • PDR

'

' Local PDR

1

l

'NSIC

l

'DTIE, OR

j

' State

I

j

'To be dispatched at a later data.

I

.

1

l

i

e

,

.

i

,

i

,.

!

l

i

t

!

!

!

!

e

I

i

'

.

i

1

$

i

r

e

t

.l.

.

_.

.

- -

carelina Power and Light

-2-

3 g gg3

'

company

.

.

!

t

and referenced in the application since the application will be placed

i

in the Public Document Room. Your application, or written statemsut,

should be submitted to us within 20 days. If we are not contacted as

!

specified, the enclosed report and thia letter may then be placed in the

[

!

Public Document Room.

'

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

j

i

Very truly yours,

ca; air.st %g4 ' -

?

M

tL c. &

Norman C. Nosaley

Director

,

t

!

Enclosure:

I

RO Inspection Report No.

!

50-325/73-6

I

i

,

i

i

!

!

!

t

i

!

-i

!

,

i

!

!

!

!

omer > RO:I L .

,. _R0:ll -

1 ...G..

EDall

!

J3ggy;pp odMACrog g+g;gn

.

_

f__r

W'nMncia

+

EURNAME> CPy

g_,,

y

10/25/73

,,10/2f/73

'

10/25/73

10/]73

'

natt >

,

~

f orra AEC-Sit tR.ev.9-$3) AECM 0240

een

.es-namena oes4rt

i

i

' - ' -

--

___..________,f