Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
._ - . -. . . . . - . . . . .
.7' '
[/4 - !. 3
'I
. t
'4 -
s VIRGINIA POWER COMPANY
, NORTH ANNA POWER STATION ,
MONTHLY OPERATING REPORT.
i i.
MONTH: June YEAR 1990 i.
.1
-l
.1 l
i 1
i l:
( .
Approved: l 1
, sta{ipn{anager i
[{j7180377900713 p l R ADOCK 05000338 PDC
f% .
h
}'.i ,
. ~ 'J OPERATING DA1A REPORT m ,
. . y -. .
[',, j..
DOCKET NO. 50 338 .i DATES July. 5, 90 3
COMPLETED BY: T..Phillips i PHONE: (703) 894 2537
.c
' OPERAT!NG STATUS [
- 1. Uni t Name s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Nor t h Ama 1 g 2. Reporting Periods......................... June 1990
- 3. Licensed Thermal Power ( W t):............. 2,893 4 Nameplate Rating (Gross W e) ............. 947
- 5. Design Electrical Rating (Net We) ....... 907
- 6. Maxinun Dependable capacity (Gross MWe) .. 959
. 7. Maxisun Dependable Capacity (Net We) .... 911
' 8. . lf changes occur in Capacity Ratings (Items No. 3 thru 7) since Last report, give reasons:
N/A
- 9. Power level to which restricted, if any (Net MWe): _ N/A i 10.. Reasons for restrictions, if any: N/A This Month YtD ^ Cumulative i
'11. Hours.In Reporting Period................................ 720.0 4,343.0 105,305.0
.12. Number of Hours React or was cri t ical . . . . . . . . . . . . . . . . . . . . . 720.0 4,331.4 75,5 73.9
- 13. Reactor Reserve shutdown Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 6,603.6
- 14. Wours Generator 0n Line.................................. 720.0 4,309.0~ 72,803.0
- 15. Unit Reserve shutdown Hours.............................. 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (WH ) . . . . . . . . . . . . . . . . . . . . . 2,078,481.6 12,407,388.4 194,298,166.4
- 17. Gross Electrical Energy Generated (MWH).................. 689,107.0 4,127,411.0 63,834,233.0
- 18. Net E l ect ri cal Energy Generat ed (WH ) . . . . . . . . . . . . . . . . . . . . 654,473.0 . 3,926,454.0 60,421,667.0
'19.. Unit Service Factor...................................... 100.0% 99.2% 69.1%' <
- 20. Unit Avaltability Factor................................. 100.0% 99.2% 69.1%. *
- 21. Unit Capacity Fcctor (using MDC Net)..................... 99.8% 99.0% 64.1%
- 22. Unit capacity Factor (using DER Net)..................... 100.2% 99.7%' 63.2%
23.. Forced Outage Rate....................................... 0.0 0.8% 13.2% ,
t
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup: ,_N/A
- 26. Units in Test Status (Prior to Connercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.4 AVERAGE DAILY UNIT POWER LEVEL i i
- 1 ,
Docket No.: 338 Unit NA-1 Date: Julv 5, 1990 ..
Ccapleted by: T. Phillies Phones (703) 894-2537' a
l NONTH: June 1990 v ..
I DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL l
-LEVEL (NWe-Net) LEVEL (NWe-Net) 1 893 16 '912 2 916 17 910 3 915 18 911 j 4 914 19 891 j 5 915 20 910 6 915 21 910
, .7 913 22 910 8 913 23 910 ..
9 912 24. 911 10 912 25 910-
11 912 26 910:
12 912 27 -909 l 13 912 28 908 14 911 29 876
- 15. 912 30 908 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest.
whole megawatt. ,
L l-i l'
1.
l-
- l. i
s
~~
UNIT. SHUTDOWNS AND POWER REDUCTIONS: ,
DOCKET No.: 50-339 UNIT NAME: .NA-2 DATE:- 1990'
. REPORT MONTH: June-1990 COMPLETED BY: July T.'Ph 5,illips.
(703) 894-2537 PHONE:
1 2 3 .
4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective-(hrs)' ' Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence-ONo entry this month 1: Type 2: Reason. 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F --Instructions S= Scheduled B= Maintenance or. Test' 2= Manual ~ Scram .for preparation of Data C= Refueling 3= Automatic Scram Enty Sheets for Licensee:
D= Regulatory Restriction 4= Continuations Event Report . (LER)- File.
E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61).
F= Administrative. 9=Other G= Operational Error 5:
H=Other-(explain) Exhibit H -'Same. Source
_ = _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ _ _ _ - . - _ _ .
- - _ = _ - _ - _ _ - _ _ _ - _ _ - _ - - _ , _
.t t
Page 1 of' J _
.r UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet ;
Docket No.: 50-338 Report Nonth June Unit Names NA-1 Yeart- 1990 Date: Julv 5, 90 ,
completed by: Todd Phillins- -
2 a
1
l NORTH ANNA POWER STATION ;
UNIT No. 1 MONTH: June
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary' of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data .
June 01, 1990 0000 Began month with Unit at 100%, 968MW.
0817 Commenced ramp down to 91% power for 1-PT-34.3, TVFT.
0915 Unit stablized-at 880MW, 91% power.
1301 Commenced ramp up to 98% power 1347 Unit stablized at 98% power for 1-PT-24.1 1416 Commenced ramp up to 100% power. 1 1440 Unit stabilized at 965'MW, 100%= power.
1 June 19, 1990 1440 Condenser vacuum decreasing, 15MW l decrease incurred. j 1549 Commenced ranp down to secure Circulating Water pump, waterbox MOV drifting.
-1625 Unit stablized at 96% power. l 2332 1-CW-E-1C returned to service.
2346 Commenced ramp up to 100% power.
June 20, 1990 0050 Unit stablized at 963MW, 100% power.
June 29, 1990 0823 Commenced ramp down to 93% power for 1-PT-34.3 0905 Unit stablized at 890MW, 93% power.
1646 Commenced ramp up to 97% power. l 1739 Unit stabilized at 97% power for 1-PT-24.1 2240 Commenced ramp up to 100% power.
2308 Unit stabilized at 955MW, 100% power.
June 30, 1990 2400 Ended month with unit at 100%, 960MW.
=. - . . .
i -.L
..: y-,
. 1
([ '
. 1 AVERAGE DAILY UNIT _ POWER LEVEL L ,
Docket No.: 50-339 I.-
Unit NA Date: July 5. 1990 '
Completed by: T. Phillies Phone:
(703) 894-2537 ;
l' l
-1 L MONTE: June- 1990 'I 1
t-1 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL-(MWe-Net) LEVEL (MWe-Net) 1 907 16 903 2 907 17 903 3 905 18 902-4 906- 19 902 5 906 20 902 6 905 21 901 l: 7 904 22 890 l' 8- 904- 23 901 9 903 24 897 l:
10 903 25 888 11 903 26 883
,' 12 903 27' 876 ;l
[ -14 13 ~905 903 28 869
- 29 861 15 904 30 853 i
L .l l l l- ;
i-1 l
Instructions:~ I on this format, list the average daily unit power level in MWe-L Net for each day in the reporting month. Compute to the nearest whole. megawatt.
1
e ~ -
-~~.-
UNIT. SHUTDOWNS AND-POWER REDUCTIONS - -
DOCKET NO.: '.50-3'38-UNIT NAME:. .. NA-1 DATE: 1990 REPORT _ MONTH: ' June.1990 COMPLETED BY: July T. Ph 5,illips PHONE: (703) 8 9 4-2 5'<7 1 2 3- 4 5 No. Date Type Duration Reason Method of Licensee- System Component Cause-& Corrective'-
(hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence oNo entry this month 1: Type 2: Reason ~ 3: ' Method "4:
F= Forced A= Equipment Failure (explain) -1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File-E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error' '5:
H=Other_(explain) Exhibit H - Same Source
. . . , , _ .,. ..,,,;.- ,..,c
_m_ , . [ .h . .w, ., ,_ .
T- i . .i. 4 y
@+ ,
i
-' t;
.hk i
Page o f ,__1 1-1 1
1 UNIT SHUTDOWN AND POWER REDUCTION 8 Explanation Sheet- .
l l
Docket No.: 50-339 Report Month June Unit Namet NA-2 Yeart 1990 Datet July 5. 90 Completed by: Todd Phillins j l
1
'1
- c ;
1
)
.l l
- ,1
- \' s l
k
.l 1
4 s
\
l
)
l
_______=__--_____:_ _ . -
8' % ,[
e *--
NORTH ANNA POWER STATION UNIT NO. 2 MONTH: June
SUMMARY
OF OPERATING EXPERIENCE Listed below in' chronological sequence is a summary. of-operating experiences for this month which required load reductions or resulted-in significant non-load related incidents..
DELt.R T151 RR.it June 01,- 1990 0000 Began month with Unit at 100%, 957MW.
June 22, 1990 0805 Commenced ramp down to 90% power for 2-PT-34.3.
0830 Unit stabilized at 890MW.
1036 Commenced ramp-up to'100% power.
1335 Unit stabilized at 952MW, 100%-power.
June-24, 1990 1000 Unit RCS Boron concentration-<1 ppm, commenced coastdown for 10 year ISI outage.
June.30, 1990 2400 Ended month with Unit at 94%, 895MW.-