E OPERATING DATA REPORT

>Q j

, DOCKET le0. 50 338 DATE: June 14, 90 -

COMPLETED gY: T. Phillips PHONE: (703) 894 2774 1 i

OPERATING STATUS

1. Unit Names................................ North Anno 1

+ .2. R eport i ng Per i od s . . . . . . . . . . . . . . . . . . . . . . . . . May 1990

3. Licensed Thermal Power ( Wt):............. 2,893
4. - Nameplete Rat ing (Gross We): . . . . . . . . . . . . . 947
$. Design Electrical Retirg (Not We) ....... .

~

907

6. Nexteun Dependable Capacity (Gross We) .. 959
, 7. Mexisun Dependebte cepecity (Not NWe) .... 911 l

o I

8. If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:

N/A L

l l

7 9. Power level to which restricted, if any (Net MWe): ,,,,,,,N / A

10. Reasons for restrictions, if any N/A This Month Yt0 Cumatetive 1
11. Nours in Reporting Period....'............................ 744.0 3,623.0 104,675.0 12.. Number of Mours Reactor was criticat..................... 744.0 3,611.4 74,853.9
13. Reactor R eserve Shutdown Mours . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 ' 0.0 _ 6,603.6
14. Hours Generator 0n Line................................... 744.0 3,589.0 72,083.0
15. Unit Reserve Shutdown Hours.............................. . 0.0 0.0 0.0
16. Gross Thorne t Energy Generat ed (WM ). . . . . . . . . . . . . . . . . . . . . 2,134,193.8 .10,328,906.8 192,219,684.8
17. Gross E lect riest Energy Generat ed (WM) . . . . . . . . . . . . . . . . . . ;709,872.0 3,438,304.0 63,145,126.0 18.' Net E l ec t ri cal Energy Genera t ed (WH ) . . . . . . . . . . . . . . . . . . . . 674,272.0 3,271,981.0 59,767,194.0 '

19.' Unit Service Factor...................................... 100.0% 99.1% 68.9E

20. Unit Aveliability Factor................................. 100.0% 99.1X 68.91
21. Unit Cenecity Factor (using MDC Net)..................... 99.5% 98.95 63.9E V 22. Unit cepecity Factor (using DER Net)..................... 99.91 99.6% 63.0%
23. Forced Outage Rate....................................... j 0.0 0.9% 13.3%

\c l.

.l 1

1

24. Shutdowns Schedated Over Next 6 Months (Type, Date, and Duration of Each): - N/A

.25. If Shutdown at end of Report Period, estimated time of Startups _N/A l 26. Units in Test Status (Prior to commercial Operation):

t Forecast Achieved INITIAL CRITICALITY l INITIAL ELECTRICITY l, COISIERCIAL OPERATION ,

l' l

h 9007180379 900713 L PDR ADOCK 05000338 R PDC 1.

1' l' +

, m' . - .5 i OPERATING DATA REPORT DOCKET No.: 50 339:

DATE: J me 14, 90

, COMPLETED BY: T. Phillips PHONE: (703) 894 2774 4-OPERATING STATUS

1. - Uni t N ame s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Nort h Anno 2
2. Reporting Periods......................... May 1990

. 3. Licensed Thermal Power ( Wt) ............. 2893

~ 4. ' Nameplate Rating (Gross We) . .. ... . .. . . . . 947 .q

5. . Design Electrical Rating (Not MWe):....... 907
6. Maxima Dependable Capacity (Gross We) .. - 957

. 7. Maxima Dependable capacity (Net MWe) .... 909 8.' ' If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:

N/A

9. ~ Power. level to which. restricted, if any (Not MWe): _ N/A
10. Reasons for restrictions,..lf any N/A l

This Month Yat D CasJiative .

,b l

11. Nours in Reporting Period................................ -720.0 4,343.0 83,663.0
12. Nuuber of . Hours Reac t or was Cri t i cal . . . . . . . . . . . . . . . . . . . . . 720.0 4,343.0 68,465.1
13. Reactor Reserve shutdown Hours............................ 0.0 0.0 5,854.9
14. Hours Generator 0n Line.................................. .

720.0. 4,343.0 J67,594.9

'15. Unit Reserve shutdown Hours.............'................. 0.0 - 0.0 - 0.0

- 16. G ross Thermal ' Energy Genera t ed (MWH) . . . . . . . . . . . . . . . . . . . . . 2,068,622.4- 12,543,286.2 180,689,633.2

< 17. Gross Electrical-Energy Generated (MWH).................. 679,962.0 4,139,609.0 .59,145,126.0'

'18. Net Electrical. Energy Generated (MWH).................... 645,582.0 3,937,042.0 :56,775,874.0

'19. Unit service Factor...................................... 100.0% ;100.0%.. 80.8%t

20. Unit Availability Factor................................. 100.0% 100.0% 80.8% i
21. Unit capacity Factor (using MDC Net)..................... 98.6% 99.4% 75.5% l 22.; Unit capacity Factor (using DER Net)..................... 98.9% 99.9% 74.8% i
23. Forced Outage Rate....................................... 0.0% 0.0% 6.6%- (

i 4

.. 1

' 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): ,

1 l y _ *U2 Refueling /10 year ISI outage scheduled 09/07/90

]

q j E25. If shutdown at end of Report Period, estimated time of Startup _N/A

26. Units in Test Status (Prior to Conenercial operation):

Forecast Achieved INITIAL CRITICALITY

  • INITIAL ELECTRICITY COMMERCIAL OPERATION L '. 1

_ . - -- - . . . . . . _ . . ._ - . . .- .~ - . . . . . . . -

[#' M ,

j.

,'e' E *- --

OPERAflWG DATA REPORT

, DOCKET NO. 50 339 .

DATE: June 14, 90 COMPLETED BT ' T. Phllllps-PHONE: (703) 894*2774 f

OPERATING STATUS 1.' Unit Names................................ North Anno 2 '

2. Reporting Periodt......................... May 1990 3.' Licensed Thermal Power ( Wt) ............. 2093 4 . Nemept et e Ra t ing (Gross We) . . . . . . . . . . . . . 947
5. Design Electricot Rating (Net We):....... 907
6. Maximun Dependebte Capacity (Gross We) .. 957
7. Nextaun Dependable Cepecity (Not NWe) .... 909
8. . If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:

N/A i

9. Power level to which restricted, if any (Not MWe): _ N/A

.10. Reasons for restrictions, if any N/A This Month YtD ' Cumulative

11. Nours in Repr t i ng P9r l od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 744.0 3,623.0 82,943.0

, 12. Number of Nours Reac t or was Cr i t i c 6l . . . . . . . . . . . . . . . . . . . . . 744.0 3,623.0 67,745.1  !

13. Reac t or R eserve Shutdown Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 5,854.9
14. Hours Generator 0n Line.................................. 744.0 3,623.0. 66,874.9
15. Uni t Reserve Shutdown Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 0.0 i 16.' Gross Thornet Energy Generated ( WN)..................... 2,150,934.1 10,474,663.8 178,621,010.8.
17. ' Gross Electrical Energy Genera ted (WW). . . . . . . . . . . . . . . . . . 709,212.0 3,459,647.0 58,465,164.0 +

l, 18. Net E lect rico t Energy Generat ed (WW) . . . . . . . . . . . . . . . . . . . . 673,842.0 3,291,460.0 56,130,292.0 l' 19. Unit Service Factor...................................... 100.0% 100.0% 80.6%

l ' 20. Uni t Ave l l ab i l i t y F ac t or.'. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100.0% 100.0%- 80.68

)! 21. Uni t Capac i t y F ac t or ( us i ng MDC Ne t ) . . . . . . . . . . . . . . . . . . . . . . , 99.6% 99.6% 75.3%

22. Unit Capacity Factor (using DER Net)..................... 99.9% 100.2% 74.6%

.23. Forced outage Rete....................................... 0.0% 0.0% 6.6%-

(; 24. Shutdowns Scheduled Over Next 6 *tonths (Type, Date, and Duration of tech):

l I j- _ U2

  • Refueling /10 year ISI outtage scheduled 09/07/90

- 25. If Shutdown et end of Report Period, estimated time of Startup _N/A

26. Units in Test Status (Prior to Comunercial operation):

[

Forecast Achieved INITIAL CRITICALITY INITIAL hECTRICITY COMMERCIAL OPERAT10N '

1 p,

l i i i

)