E OPERATING DATA REPORT
>Q j
DOCKET le0.
50 338 DATE:
June 14, 90 -
COMPLETED gY:
T. Phillips PHONE: (703) 894 2774 1
i OPERATING STATUS 1.
Unit Names................................ North Anno 1
+
.2.
R eport i ng Per i od s......................... May 1990 3.
Licensed Thermal Power ( Wt):.............
2,893
- 4. - Nameplete Rat ing (Gross We):.............
947
- $. Design Electrical Retirg (Not We)........
907
~
6.
Nexteun Dependable Capacity (Gross We)..
959 7.
Mexisun Dependebte cepecity (Not NWe)....
911 o
I 8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A L
l l
7 9.
Power level to which restricted, if any (Net MWe):
,,,,,,,N / A
- 10. Reasons for restrictions, if any N/A This Month Yt0 Cumatetive
- 11. Nours in Reporting Period....'............................
744.0 3,623.0 104,675.0 12.. Number of Mours Reactor was criticat.....................
744.0 3,611.4 74,853.9
- 13. Reactor R eserve Shutdown Mours...........................
. 0.0
' 0.0
- 14. Hours Generator 0n Line...................................
744.0 3,589.0
_ 6,603.6 72,083.0
- 15. Unit Reserve Shutdown Hours..............................
. 0.0 0.0 0.0
- 16. Gross Thorne t Energy Generat ed (WM )..................... 2,134,193.8
.10,328,906.8 192,219,684.8
- 17. Gross E lect riest Energy Generat ed (WM).................. ;709,872.0 3,438,304.0 63,145,126.0 18.' Net E l ec t ri cal Energy Genera t ed (WH )....................
674,272.0 3,271,981.0 59,767,194.0 19.' Unit Service Factor......................................
100.0%
99.1%
68.9E
- 20. Unit Aveliability Factor.................................
100.0%
99.1X 68.91
- 21. Unit Cenecity Factor (using MDC Net).....................
99.5%
98.95 63.9E V
- 22. Unit cepecity Factor (using DER Net).....................
99.91 99.6%
63.0%
j
- 23. Forced Outage Rate.......................................
0.0 0.9%
13.3%
\\c l.
.l 1
1
- 24. Shutdowns Schedated Over Next 6 Months (Type, Date, and Duration of Each): -
N/A
.25. If Shutdown at end of Report Period, estimated time of Startups _N/A l
- 26. Units in Test Status (Prior to commercial Operation):
t Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY l,
COISIERCIAL OPERATION l'
l h
9007180379 900713 L
PDR ADOCK 05000338 R
PDC 1.
1' l'
+
m'
. -.5 i
OPERATING DATA REPORT DOCKET No.:
50 339:
DATE:
J me 14, 90 COMPLETED BY:
T. Phillips PHONE: (703) 894 2774 4-OPERATING STATUS
- 1. - Uni t N ame s................................ Nort h Anno 2 2.
Reporting Periods.........................
May 1990
. 3.
Licensed Thermal Power ( Wt).............
2893
~ 4. ' Nameplate Rating (Gross We).............
947
.q
- 5.. Design Electrical Rating (Not MWe):.......
907 6.
Maxima Dependable Capacity (Gross We).. -
957
. 7.
Maxima Dependable capacity (Net MWe)....
909 8.' ' If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A
- 9. ~ Power. level to which. restricted, if any (Not MWe): _ N/A
- 10. Reasons for restrictions,..lf any N/A l
This Month Yat D CasJiative.
,b l
- 11. Nours in Reporting Period................................
-720.0 4,343.0 83,663.0
- 12. Nuuber of. Hours Reac t or was Cri t i cal.....................
720.0 4,343.0 68,465.1
- 13. Reactor Reserve shutdown Hours............................
0.0 0.0 5,854.9
- 14. Hours Generator 0n Line..................................
720.0.
4,343.0 J67,594.9
'15. Unit Reserve shutdown Hours.............'.................
0.0
- 0.0 -
0.0
- 16. G ross Thermal ' Energy Genera t ed (MWH)..................... 2,068,622.4-12,543,286.2 180,689,633.2
- 17. Gross Electrical-Energy Generated (MWH)..................
679,962.0 4,139,609.0
.59,145,126.0'
'18. Net Electrical. Energy Generated (MWH)....................
645,582.0 3,937,042.0
- 56,775,874.0
'19. Unit service Factor......................................
100.0%
- 100.0%..
80.8%t
- 20. Unit Availability Factor.................................
100.0%
100.0%
80.8%
i
- 21. Unit capacity Factor (using MDC Net).....................
98.6%
99.4%
75.5%
l 22.; Unit capacity Factor (using DER Net).....................
98.9%
99.9%
74.8%
i
- 23. Forced Outage Rate.......................................
0.0%
0.0%
6.6%-
(
i 4
1
' 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
l 1
y _ U2 Refueling /10 year ISI outage scheduled 09/07/90
]
q j
E25. If shutdown at end of Report Period, estimated time of Startup _N/A
- 26. Units in Test Status (Prior to Conenercial operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION L '.
1
.~ -
[#' M
- ,'e' E *-
OPERAflWG DATA REPORT j.
DOCKET NO.
50 339 DATE:
June 14, 90 COMPLETED BT ' T. Phllllps-PHONE: (703) 894*2774 f
OPERATING STATUS 1.' Unit Names................................ North Anno 2 2.
Reporting Periodt.........................
May 1990 3.' Licensed Thermal Power ( Wt).............
2093 4. Nemept et e Ra t ing (Gross We).............
947 5.
Design Electricot Rating (Net We):.......
907 6.
Maximun Dependebte Capacity (Gross We)..
957 7.
Nextaun Dependable Cepecity (Not NWe)....
909
- 8.. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A i
9.
Power level to which restricted, if any (Not MWe): _ N/A
.10. Reasons for restrictions, if any N/A This Month YtD
' Cumulative
- 11. Nours in Repr t i ng P9r l od................................
744.0 3,623.0 82,943.0
- 12. Number of Nours Reac t or was Cr i t i c 6l.....................
744.0 3,623.0 67,745.1
- 13. Reac t or R eserve Shutdown Hours...........................
0.0 0.0 5,854.9
- 14. Hours Generator 0n Line..................................
744.0 3,623.0.
66,874.9
- 15. Uni t Reserve Shutdown Hours..............................
0.0 0.0 0.0 i
16.' Gross Thornet Energy Generated ( WN)..................... 2,150,934.1 10,474,663.8 178,621,010.8.
- 17. ' Gross Electrical Energy Genera ted (WW)..................
709,212.0 3,459,647.0 58,465,164.0
+
l,
- 18. Net E lect rico t Energy Generat ed (WW)....................
673,842.0 3,291,460.0 56,130,292.0 l'
- 19. Unit Service Factor......................................
100.0%
100.0%
80.6%
l
' 20. Uni t Ave l l ab i l i t y F ac t or.'................................
100.0%
100.0%-
80.68
)!
- 21. Uni t Capac i t y F ac t or ( us i ng MDC Ne t )......................
, 99.6%
99.6%
75.3%
- 22. Unit Capacity Factor (using DER Net).....................
99.9%
100.2%
74.6%
.23. Forced outage Rete.......................................
0.0%
0.0%
6.6%-
(;
- 24. Shutdowns Scheduled Over Next 6 *tonths (Type, Date, and Duration of tech):
l I
j-
_ U2 Refueling /10 year ISI outtage scheduled 09/07/90
- 25. If Shutdown et end of Report Period, estimated time of Startup _N/A
- 26. Units in Test Status (Prior to Comunercial operation):
[
Forecast Achieved INITIAL CRITICALITY INITIAL hECTRICITY COMMERCIAL OPERAT10N 1
p, l
i i
)
i