Corrected Monthly Operating Repts for May 1990 for North Anna Power Station
ML20044B354
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/31/1990
From: Phillips T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20044B351 List:
References
NUDOCS 9007180379
Download: ML20044B354 (3)


Text

,,

E OPERATING DATA REPORT

>Q j

DOCKET le0.

50 338 DATE:

June 14, 90 -

COMPLETED gY:

T. Phillips PHONE: (703) 894 2774 1

i OPERATING STATUS 1.

Unit Names................................ North Anno 1

+

.2.

R eport i ng Per i od s......................... May 1990 3.

Licensed Thermal Power ( Wt):.............

2,893

4. - Nameplete Rat ing (Gross We):.............

947

$. Design Electrical Retirg (Not We)........

907

~

6.

Nexteun Dependable Capacity (Gross We)..

959 7.

Mexisun Dependebte cepecity (Not NWe)....

911 o

I 8.

If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:

N/A L

l l

7 9.

Power level to which restricted, if any (Net MWe):

,,,,,,,N / A

10. Reasons for restrictions, if any N/A This Month Yt0 Cumatetive
11. Nours in Reporting Period....'............................

744.0 3,623.0 104,675.0 12.. Number of Mours Reactor was criticat.....................

744.0 3,611.4 74,853.9

13. Reactor R eserve Shutdown Mours...........................

. 0.0

' 0.0

14. Hours Generator 0n Line...................................

744.0 3,589.0

_ 6,603.6 72,083.0

15. Unit Reserve Shutdown Hours..............................

. 0.0 0.0 0.0

16. Gross Thorne t Energy Generat ed (WM )..................... 2,134,193.8

.10,328,906.8 192,219,684.8

17. Gross E lect riest Energy Generat ed (WM).................. ;709,872.0 3,438,304.0 63,145,126.0 18.' Net E l ec t ri cal Energy Genera t ed (WH )....................

674,272.0 3,271,981.0 59,767,194.0 19.' Unit Service Factor......................................

100.0%

99.1%

68.9E

20. Unit Aveliability Factor.................................

100.0%

99.1X 68.91

21. Unit Cenecity Factor (using MDC Net).....................

99.5%

98.95 63.9E V

22. Unit cepecity Factor (using DER Net).....................

99.91 99.6%

63.0%

j

23. Forced Outage Rate.......................................

0.0 0.9%

13.3%

\\c l.

.l 1

1

24. Shutdowns Schedated Over Next 6 Months (Type, Date, and Duration of Each): -

N/A

.25. If Shutdown at end of Report Period, estimated time of Startups _N/A l

26. Units in Test Status (Prior to commercial Operation):

t Forecast Achieved INITIAL CRITICALITY l

INITIAL ELECTRICITY l,

COISIERCIAL OPERATION l'

l h

9007180379 900713 L

PDR ADOCK 05000338 R

PDC 1.

1' l'

+

m'

. -.5 i

OPERATING DATA REPORT DOCKET No.:

50 339:

DATE:

J me 14, 90 COMPLETED BY:

T. Phillips PHONE: (703) 894 2774 4-OPERATING STATUS

1. - Uni t N ame s................................ Nort h Anno 2 2.

Reporting Periods.........................

May 1990

. 3.

Licensed Thermal Power ( Wt).............

2893

~ 4. ' Nameplate Rating (Gross We).............

947

.q

5.. Design Electrical Rating (Not MWe):.......

907 6.

Maxima Dependable Capacity (Gross We).. -

957

. 7.

Maxima Dependable capacity (Net MWe)....

909 8.' ' If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:

N/A

9. ~ Power. level to which. restricted, if any (Not MWe): _ N/A
10. Reasons for restrictions,..lf any N/A l

This Month Yat D CasJiative.

,b l

11. Nours in Reporting Period................................

-720.0 4,343.0 83,663.0

12. Nuuber of. Hours Reac t or was Cri t i cal.....................

720.0 4,343.0 68,465.1

13. Reactor Reserve shutdown Hours............................

0.0 0.0 5,854.9

14. Hours Generator 0n Line..................................

720.0.

4,343.0 J67,594.9

'15. Unit Reserve shutdown Hours.............'.................

0.0

- 0.0 -

0.0

- 16. G ross Thermal ' Energy Genera t ed (MWH)..................... 2,068,622.4-12,543,286.2 180,689,633.2

17. Gross Electrical-Energy Generated (MWH)..................

679,962.0 4,139,609.0

.59,145,126.0'

'18. Net Electrical. Energy Generated (MWH)....................

645,582.0 3,937,042.0

56,775,874.0

'19. Unit service Factor......................................

100.0%

100.0%..

80.8%t

20. Unit Availability Factor.................................

100.0%

100.0%

80.8%

i

21. Unit capacity Factor (using MDC Net).....................

98.6%

99.4%

75.5%

l 22.; Unit capacity Factor (using DER Net).....................

98.9%

99.9%

74.8%

i

23. Forced Outage Rate.......................................

0.0%

0.0%

6.6%-

(

i 4

1

' 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):

l 1

y _ U2 Refueling /10 year ISI outage scheduled 09/07/90

]

q j

E25. If shutdown at end of Report Period, estimated time of Startup _N/A

26. Units in Test Status (Prior to Conenercial operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION L '.

1

.~ -

[#' M

,'e' E *-

OPERAflWG DATA REPORT j.

DOCKET NO.

50 339 DATE:

June 14, 90 COMPLETED BT ' T. Phllllps-PHONE: (703) 894*2774 f

OPERATING STATUS 1.' Unit Names................................ North Anno 2 2.

Reporting Periodt.........................

May 1990 3.' Licensed Thermal Power ( Wt).............

2093 4. Nemept et e Ra t ing (Gross We).............

947 5.

Design Electricot Rating (Net We):.......

907 6.

Maximun Dependebte Capacity (Gross We)..

957 7.

Nextaun Dependable Cepecity (Not NWe)....

909

8.. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:

N/A i

9.

Power level to which restricted, if any (Not MWe): _ N/A

.10. Reasons for restrictions, if any N/A This Month YtD

' Cumulative

11. Nours in Repr t i ng P9r l od................................

744.0 3,623.0 82,943.0

12. Number of Nours Reac t or was Cr i t i c 6l.....................

744.0 3,623.0 67,745.1

13. Reac t or R eserve Shutdown Hours...........................

0.0 0.0 5,854.9

14. Hours Generator 0n Line..................................

744.0 3,623.0.

66,874.9

15. Uni t Reserve Shutdown Hours..............................

0.0 0.0 0.0 i

16.' Gross Thornet Energy Generated ( WN)..................... 2,150,934.1 10,474,663.8 178,621,010.8.

17. ' Gross Electrical Energy Genera ted (WW)..................

709,212.0 3,459,647.0 58,465,164.0

+

l,

18. Net E lect rico t Energy Generat ed (WW)....................

673,842.0 3,291,460.0 56,130,292.0 l'

19. Unit Service Factor......................................

100.0%

100.0%

80.6%

l

' 20. Uni t Ave l l ab i l i t y F ac t or.'................................

100.0%

100.0%-

80.68

)!

21. Uni t Capac i t y F ac t or ( us i ng MDC Ne t )......................

, 99.6%

99.6%

75.3%

22. Unit Capacity Factor (using DER Net).....................

99.9%

100.2%

74.6%

.23. Forced outage Rete.......................................

0.0%

0.0%

6.6%-

(;

24. Shutdowns Scheduled Over Next 6 *tonths (Type, Date, and Duration of tech):

l I

j-

_ U2 Refueling /10 year ISI outtage scheduled 09/07/90

- 25. If Shutdown et end of Report Period, estimated time of Startup _N/A

26. Units in Test Status (Prior to Comunercial operation):

[

Forecast Achieved INITIAL CRITICALITY INITIAL hECTRICITY COMMERCIAL OPERAT10N 1

p, l

i i

)

i