Requests That Util Inform Commission in Writing of Replacement of Independent Safety Evaluation Group
ML20043F796
Person / Time
Site: Beaver Valley
Issue date: 06/12/1990
From: De Agazio A
Office of Nuclear Reactor Regulation
To: Sieber J
DUQUESNE LIGHT CO.
References
TAC-76767, NUDOCS 9006180159
Download: ML20043F796 (2)


Text

,

June 12,1990 i

Docket No. 50-412 DISTRIBUTION Docte('H C Serial No. BV-90-003 RRC & l.ocal PDRs Plant

  • File" 5.Yarga(14E4}

S. Norris B. Boger (14A2, A. DeAgezio Mr. J. D. Sieber, Vice President E. Jordan (MNBB3302)

OGC Nuclear Group E. Wenzinger, RI Duquesne Light Company P. O. Box 4 Shippingport, Pennsylvania 15007

Dear Mr. Sieber:

SUBJECT:

INDEPENDENT SAFETY EVALUATION GROUP HINIMUM MEMBERSillP BEAVER VALLEY POWER STATION, UNIT 2 (TAC NO. 76767)

By letter dated May 18, 1990 Duquesne Light Company advised the NRC that due to the retirement of one of the full-time dedicated members of the Independent Safety Evaluation Group (ISEG), the membership of the ISEG will be less than theminimumrequiredbyTechnicalSpecification(TS)6.2.3.2. DLC indicated that there has been an active and ongoing job bidding and selection process to fill the expected vacancy, and that the ISEG replacement will be provided by August 29, 1990. By that time the ISEG should meet the required minimum membership of five.

Consideringthat(1)TS6.2.3.2doesnothaveanassociatedLCOorACTION requirement, (2) the ISEG provides no daily line function afft.cting the safe operation of Beaver Valley Power Station Unit No. 2, (3) an active search for a qualified replacement is underway, and (4) the ISEG membership should be at the required minimum by August 29, 1990, continued operation of Beaver Valley Unit No. 2 is not impacted.

You are requested to inform the Commission in writing within 10 days after a replacement is identified. Should a qualified replacement not be available after August 29, 1990, you are requested to to inform the Commission in writing along with an explanation of the circumstances and your plans for meeting the TS requirement.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance under PL 96-511 is not required.

l Sincerely,

/s/

Albert W. De Agazio, Senior Project Manager

j. g6 o19 900612 Project Directorate 1-4 Et0CK OSOO 2

Division of Reactor Projects - 1/11 P

Office of Nuclear Reactor Regulation ec: See next page

@(0\\

LA DIL/

PM:PD1 PD)

-4 S

ls ADeAcazio:rc JSt 1-(c,/(f/90 f/jj/90 Q/(t/90 g

DOCUMENT NAME: 76767LET

i Mr. J. Sieber Beaver Valley Fower Station i

Duquesne Light Company Units 1 & 2 cc:

Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts and Trowbridge Pennsylvania Department of 2300 N Street, N.W.

Environmental Resources Washington,DC 20037 ATTN:

R. Jsnati Post Offi;.e Box 2063 Nelson Tonet, Manager HarriGurg, Pennsylvania 17120 Huclear Safety Duquesne Light Company Mayor of the Borrough of P. O. Box 4 Shippingport Shippingport, Pennsylvania 15077 Post Office Box 3 shippingport, Pennsylvania 15077 Comissioner Roy M. Smith Regional Administrator, Region I i

West Virginia Department of Labor U.S. Nuclear Regulatory Comission Building 3. Room 319 475 Allendale Road Capitol Complex King of Prussia, Pennsylvania 19406 Charleston,WV 25305 John D. Borrows Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Comission Public Utilities Comissior.

Post Office Box 181 180 East Broad Street Shippingport, Pennsylvania 15077 Columbus, Ohio 43266-0573 Director, Pennsylvania Emergency Management Agency Post Office Box 3321 Harrisburg, Pennsylvania 17105-3321