May 25, 1990 Docket Nos. 50-295 DISTRIBUTION:
and 50-304 QDocket+11esANRC&LocalPDRs PDIII-2"r/f " JZwolinski RDudley CPatel CMoore OGC-WF1 Mr. Thomas J. Kovach EJordan ACRS(10) i Nuclear Licensing Manager PD111-2 Gray Commonwealth Edison Company-Suite 300 OPUS West III 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Kovach:
SUBJECT:
ZION STATION UNITS 1 AND 2 - RESPONSE TO BULLETIN 89-02 (TAC NOS. 74336 AND 74337)
.We have reviewed the supplemental information provided by Commonwealth Edison in a letter dated May. 14, 1990, regarding the inspection of the Anchor Darling Check Valves at Zion Station, Units 1 and 2.
In your response you indicated that you have completed the inspection of the 24 check valves in Unit 2 and repaired them appropriately. You also provided the results of your inspection. We have reviewed your response and determined, that for Unit 2, you have appropriately implemented the actions requested by Bulletin 89-02.
l You also indicated that you have inspected 12 of the 24 check valves in Unit 1.
You provided the results of your inspection for Unit I and also provided the Engineering Evaluation to support your decision to complete l
the inspection of the remainder of the Unit 1 check valves during the next refueling outage for Unit 1.
You also indicated that the additional inspection will require off-loading the core for Unit 1, or at the minimum to inspect 4 more valves you would have to operate Unit 1 for an additional 3 weeks at mid-loop operation.
Based on'the radiation exposure involved in off-loading the core, the advisability of and potential need for operating the unit for. extended periods at mid-loop operation, and the Engineering Evaluation, you have decided to inspect the remainder of the check valves during the next refueling outage for Unit 1.
We have reviewed your response and have determined that your proposed schedule is reasonable and consistent with the requested schedule in Bulletin 89-02.
gryo6010062 90_>OT_;
PDR ADOCK OSOCH 5
o
\\
'o UNITED STATES I
NUCLEAR REGULATORY COMMISSION g
g,
,t-WASHINGTON, D, C. 20555
%,,, g M May 25,1990 Docket Nos. 50-295 and 50-304 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company-Suite 300 OPUS West III 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Kovach:
SUBJECT:
ZION STATION UNITS 1 AND 2 - RESPONSE TO BULLETIN 89-02 (TAC NOS. 74336 AND 74337)
We have' reviewed the supplemental information provided by Commonwealth
' Edison in a letter dated May 14, 1990, regarding the inspection of the Anchor Darling Check Valves at Zion Station, Units 1 and 2.
In your response you indicated that you have completed the inspection of the 24 check' valves in Unit 2 and repaired them appropriately.
You also provided the results of-your inspection. We have reviewed your response and determined, that for Unit 2, you have appropriately implemented the actions requested by-Bulletin 89-02.
You also indicated that you have inspected 12 of the 24 check valves in Unit 1.
You provided the results of your inspection for Unit I and also provided the Engineering Evaluation to support your decision to complete the inspection of the remainder of the_ Unit I check valves during the next refueling outage for Unit 1.
You also indicated that the additional inspection will require off-loading the core for Unit 1, or at the minimum to inspect 4 more valves you would have to operate Unit 1 for an additional 3 weeks at mid-loop operation.
Based on the radiation exposure involved in off-loading the core, the advisability of and potential need for operating the unit for extended periods at mid-loop operation, and the Engineering Evaluation, you have decided to inspect the remainder of the check valves during the next refueling outage for Unit 1.
We have reviewed your response and have determined that your proposed schedule is reasonable and consistent with the requested schedule in Bulletin 89-02.
y.
n
.s r-1,..
I 2
I Mr. Thomas J. Kovach i
- s I
It is also consistent with my April 9,1990 letter to you. The remaining g
check valves should be inspected during the next refueling outage in fall 1991.
'If 'you 'have any questions concerning this matter please contact me.
'~
Sincerely, R. Dudley for/
Chandu P. Patel, Project Manager Project Directorate 111 Division'of Reactor Projects - Ill, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page
.i 4
h i
l:'
DOCUMENT NAME 74336/74337 RESPONSE TO BUL.
Office:
LA)D11-2 PM/PD
-2 (A)
PDI SP el ' g RDudley p> ore-/M/90 90 g/25/90 Surname:
Date:
$f I
Mr. Thomas J.- Kovach'
- It is also consistent with my April 9, 1990 letter to you. The remaining check valves should be inspected during the next refueling outage in fall-1991..
If you have any questions concerning this matter please contact me.
Sincerely, q
\\
l r
1
/i Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
- cc:
See next page b
e
+
.m y
1 x
i; l
Mr. Thomas J. Kovach Zion Nuclear Power Station
~.
. Comonwealth Edison Company Unit Nos. I and 2 j
Cc:
V Robert J. Vollen, Esquire 109 North Dearborn Street Chicago, Illinois 60602 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Phillip Steptoe, Esq.
Sidley and Austin One First National Plaza Chicago.-Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.
Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 l
. Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel L
State of Illinois Center L
100 W. Randolph Suite 11-300 Chicago, Illinois 60601 l
l-1:
l
-