p' April 9, 1990
. Docket h{os 50-295 DISTRIBUTION and 50 304 (55R6 m W"9..
NRC &-Local PDRs
. Thomas J. Kovach JZwolinski Nuclear Licensing Manager JCraig Conmonwealth Edison Company-Suite 300 LLuther OPUS West 111 CPatel 1400 OPUS Place
-EJordan Downers Grove, Illinois 60515 ACRS(10)
PD Plant File
Dear Mr. Kovach:
PD3/2 Reading File
SUBJECT:
Il0N STATION, UNIT 1 AND 2 - REQUEST FOR BULLETIN 89-02 SCHEDULE EXTENSION (TAC NOS 74336 and 74337)
We have completed our review of your request dated January 26, 1990, to extend
-NRC Bulletin 89-02 inspection schedule for Zion Station Units 1.and 2.
We find your request to be unacceptable.
However, the staff recognizes your concern in regard to ALARA program considerations. Therefore, based on ALARA'considera.
tions and the results of the past inspections performed at Unit I during the past September 1989 refueling outage, an acceptable resolution of Bulletin 89-02 at Zicn Unit 2 should include: (1) inspection of twelve of the Anchor Darling (A/D) Swina Check Valves Model S350W during-the' current refueling outage for Unit 2 (2) the remaining twelve valves should be inspected during the following refueling outage or a scheduled outage of sufficient duration of four weeks or longer, and (3) if any cracked bolts are found during the current Unit 2 refueling outage, all 24 valves will be inspected during the current outage for Unit 2.
With respect to Unit 1,(an acceptable resolution of Bulletin 89-02 at Zion Unit i should include:
- 1) consideration of the results of the inspection performed on Unit 2 valves, and (2) inspection of ten of the valves during each of the next two outages of four week or longer provided the inspection results do not warrant inspecting the remaining twenty during the next outage.
If you have any questions concerning this matter please contact me.
Sincerely,
/.s/
Chandu p. Patel, Project Manager Project Directorate 111-2 Division of Reactor Projects. 111, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page CA 0FC :PDI,fI-PLA
- PDIII.2:PM :PDIII-2:D NAME :llu' r.
- CPatel/jm1
- JCrai M:
.....:......s_...:...___..__..:_f_//90 DATE : S/ N9 h/Of/90 0FFICIAL RECORD COPY n
Document Name: TAC 74336 AND 74337 l
/g 9004190083 900409 PDR ADOCK 05000295 O
FDC I'
L 1
v L',. Mr. Thomas-J'. Kovach:
Zion Nuclear Power Station Comonwealth Edison Company Units 1 and 2<
CC*
Robert J. Vollen, Esquire 109 North Dearborn Street-Chicago,LIllinois 60602 Dr.; Cecil Lue-Hing
~
Director of Research and Development Metropolitan Sanitary District of Greater C5icago;
- 100 East Erie: Street Chicago,. Illinois 60611 Phillip Steptoe,'Esq.
Sidley and Austin
)
One First National Plaza Chicago, Illinois 60603
-Mayor of Zion:-
Zion Illinois 60099-Illinois Department of Nuclear Safety i
Office of-Nuclear Facility Safety d
'1035 Outer Park Drive Springfield, Illinois 62704 d
' U.S. Nuclear Regulatory Comission-Resident Inspectors Office l
i 105 Shiloh Blvd.
-Zion,.1111ocis-60099 Ji r
L Regional Administrator, Region III i
L U.S. Nuclear Regulatory Comission l.
799 Roosevelt Road. Bldg..#4 Glen Ellyn, Illinois 60137 l
i r
I
)
i
.. ~,.