ML17156B009
| ML17156B009 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 02/03/1989 |
| From: | Thadani M Office of Nuclear Reactor Regulation |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17156B010 | List: |
| References | |
| GL-83-28, TAC-52888, TAC-54033, TAC-59513, TAC-59514, NUDOCS 8902080421 | |
| Download: ML17156B009 (5) | |
Text
February 3, 9
Docket Nos. 50-387/388 Mr. Harold M. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 DISTRIBUTION: w/encl osures D
RTVB D'RD PDR Local PDRj PDI-2 Reading GLainas BBoger MButler MO'Brien MThadani JStone OGC EJordan BGrimes ACRS (10)
Dear Mr. Keiser:
SUBJECT:
IMPLICATIONS OF SALEM ATMS EVENTS - ITEMS 2.1 AND 4.5.2 (TAC NOS.
- 52888, 59514, 54033,'ND 59513)
RE:
SUSQUEHANNA STEAM ELECTRIC STATION (SSES),
UNITS 1
AND 2 Our contractor, Idaho National Engineering Laboratory (EG&G) has completed its review of your responses to our Generic Letter (G.L.) No. 83-28 item 2.1 (Vendor Interface Programs) and item 4.5.2 (Reactor Trip System Reliability-On-line Testing),
The EG&G Technical Evaluation Reports (TERs) are attached (Enclosures 1
& 2).
Me have reviewed your responses and the EG&G TERs and concur with the conclusions reached by EG&G related to the subject items.
Based on our reviews, we conclude that your responses to G.L. 83-28 related to Vendor Interface Programs and Reactor Trip System Reliability - On-line Testing are acceptable.
Si ncerely,
Enclosures:
As stated cc:
w/enclosures See next page
/s/
Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation L AR Dj PM Th dani:tr g, /P /89 PDI-2/D ttButler g /p/89 85'02080421 890203 PDR ADOCK 05000387 PDC
( ~)
N ~ '
u <<
fl[ut() ) ~ rh I
II pir t '
)
(pj f) (
P<> <fg P
<<I I'*
<<l C,
h u,uu,u (u
u p f.l.'))
'u>>
f't ll
<<)PI P
~ ')
~ )
~-
fP(h)r 'l f)
- '~f) I(
'IPWQ)lt P
~
h ')
l h f'
~
= )
h fu l If ~)ut hf
))) ',"'
ut'f
~ II('u
<<](
r, r
<< I',
uf
~,)g p 'uu )
rh((h f1 I ury
('
.>>u h
Qhhfh h
('
1 It I' iu( P
~ Ir r
f tu, ~
h
) ur~, 'htuh
<<.) I )f>>,'
i)C(
~ >>
lu>>
~
th
gyes REGIj~
0 Cy I
O X
e
+
~O
++*<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 3, 1989 Docket Nos. 50-387/388 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company P North Ninth Street Allentown, Pennsyl vania,18101
Dear ter.,
Keiser:
SUBJECT:
IMPI.ICATIONS OF SALEM ATWS EVENTS -
ITEMS 2.1 AND 4.5.2 (TAC NOS. 52888,
- 59514, 54033, AND 595l3)
RE:
SUSQUEHANNA STEAM ELECTRIC STATION (SSES),
UNITS I AND 2 Our contractor, Idaho Nationa1 Engineering Laboratory (EG&G) has completed its review of your responses to our Generic Letter (G.L.) No. 83-28 item 2.1 (Vendor Interface Programs) and item 4.5.2 (Reactor Trip System Reliability-On-line Testing).
The EG&G Technical Evaluation Reports (TERs) are attached (Enclosures 1
& 2).
We have reviewed your responses and the EG&G TERs and concur with the conclusions reached by EG&6 related to the subject items.
Based on our reviews, we conclude that your responses to G.L. 83-28 related to Vendor Interface Programs and Reactor Trip System Reliability - On-line Testing are acceptable.
Sincerely,
Enclosures:
As stated Mohan C. Thadani, Proiect Manager Proiect Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc:
w/enclosures See next page
Mr. Harold W. Keiser Pennsylvania Power E Light Company Susquehanna Steam Electric Station Units 1
E 2
CC:
Jay Silberg, Esq.
Shaw, Pittman, Potts A Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. E. A. Heckman Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. F. I. Young Resident Inspector P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. R. J.
Benich Services Project Manager General Electric Company 1000 First Avenue King of Prussia, Pennsylvania 19406 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.
Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Coorperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Mr.
W. H. Hirst, Manager Joint Generation Projects Department Atlantic Electric P.O.
Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406
~
~
~'