Forwards Insp Repts 50-334/90-80 & 50-412/90-80 on 900226-0307.Weaknesses Identified.Overall Assessment of Program at Unit 2 for Development & Maint of symptom-based EOPs Found Very Good
ML20043A285
Person / Time
Site: Beaver Valley
Issue date: 05/10/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20043A286 List:
References
NUDOCS 9005210154
Download: ML20043A285 (3)


See also: IR 05000334/1990080

Text

y

y

3

,

(Q3

j.

4

. . . .

p

.

.

,

MAY 101990 -

Docket No. 50-334 'and 50-412

Duquesne Light Company

~

,

ATTN:" _ Mr. J. Di Sieber

'

Vice President-

Nuclear Group

y

P.O.. Box 4-.

Shippingport, Pennsylvania 15077

Gentlemen:

,

SUBJECT:

INSPECTION NO. 50-334/90-80 and 50-412/90-80

1

4

During:the. period of February 26 through March 7,.1990,-the NRC conducted an .

[

~

announced team' inspection of the emergency procedures used by the operators at.

Beaver Valley Unit 2.

.

The inspection team also~ reviewed Beaver Valley Unit I corrective actions:

.

relative to deviation 334/88-02-01 which concerned failure of_EOPs and.

~ Background Documents to adhere to the guidelines'specified'in;the NRC approved

'

Procedures Generation Package (PGP). =The corrective: action.was' determined to

~

be acceptable and the deviation _is considered < closed. 'This.-item is discussed.

-

in Paragraph 8.0 of-this. report.

-At the conclusion of the inspection, Mr. L. Briggs discussed the preliminary

findings with those members of your staff identified in -the enclosed report.

-

Within.the context of this report, the term emergency procedures includes the

<

- Emergency Operating Procedures (E00s), ' Abnormal -Operating' Procedures (A0Ps)

~

'

and all procedures directly_ referenced by the E0Ps.

Attachment 3 to the enclosed inspection report summarizes the' generic

i

= weaknesses identified relative to_the emergency procedures.

You are requested

9

to respond to the Attachment.3 weaknesses within sixty days of. receipt of this-

letter. Attachment 2. identifies weaknesses,that-are specific to the indicated-

procedure.

Youneednotrespondto'gividualAttachment2' weaknesses.

The overall assessment of-the inspection. team is thatLthe program at Beaver

Valley Unit 2.for development and maintenance of the: symptom based Emergency

t

Operating Procedures was very good. The technical adequacy and usefulness of.

}

the~ Abnormal Procedures was determined by the team to be adequate, but

required reliance on operator memory for component location and equipment

'

' operation-in many instances.

Poor in plant valvo labeling (difficult to read

-labels) further hindered the operators ability to locate valves. .These.

'*

matters were discussed in detail-during:the March 7' 1990 exit meeting.

~

,

During the meeting your staff committed to review, walkdown, correct and

. implement all procedures that fall under the E0P family of procedures.

In

'

your response you are requested to reconfirm this commitment and provide a

schedule of expected completion dates.

OFFICIAL RECORD COPY

IR BV2 BRIGGS - 0001.0.0

/08 M

90052101G4 900510

,

PDR

ADOCK 05000334

' k p v/) I/\\

C

Q

PDC

..

-

.

_ . _ _ _ - _ - _ _ -

9

.

. ..

.

.

.

..

.

.

.

..

. .. ..

.

..

.

,

,.

'Nf

3

0;

. . ,

.

Duquesne Light Company

2-

l

The response requested by this letter is'not subject to the clearance

procedures of the Office of Management and Budget as required by the. Paperwork

Reduction Act of 1930, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and its enclosure will be placed in the NRC Public. Document Room,

'

Should you have any questions regarding this inspection,.please contact me at

215/337-5291.

"

Sincerely,

Orleinal Signed Byt

PETER W. ESELGROTH

jRobertM.Gallo, Chief

Operations Branch

Division of Reactor Safety

'

Enclosure:

Inspection Report Nos. 50-334/90-80 and 50-412/90-80 w/ Attachments

1, 2, and 3

L

cc w/ Enclosure and Attachments 1, 2, and 3:

.J. J. Carey, Executive Vice President, Operations

W. S. Lacey, General Manager, Nuclear.0perations

W. R.:Tonet, Manager, Nuclear Engineering

T. P. Noonan, General Manager, Nuclear Operations

S. C. Fenner, QA Manager

K. D. Grada, Manager, Nuclear Safety

H. R. Caldwell, General Superintendent, Nuclear Operations

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

..

0

0FFICIAL RECORD COPY

IR BV2 BRIGGS - 0002.0.0

05/08/90

!

!

.f

q, -

.

4

.

Duquesne Light Company

3

'

i

bec w/ Enclosure and Attachments 1, 2, and 3:

Management Assistant, DRMA (w/o enclosure)

,

Region I Docket Room (w/ concurrences)

R. M. Gallo, DRS

,

P. W.'Eselgroth, PWR

E. Wenzinger,.DRP

.i

P. Bissett,-DRS

!

G.=Galletti, NRR

!

S. Shankman, NRR

B. Paramore, SAIC

C. Meeker, COMEX

J. Beall, DRP

l

P. Tam. NRR-

j

DRS Files (5-)

,

,

I

,

I

'

I

i

il

)

I/D

'r

!

,

05/6[/90

05/7/90

05/f/90'

i

0FFICIAL RECORD COPY

IR BV2 BRIGGS - 0003.0.0

1

05/08/90

'

4