ML20042B911

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/82-04 on 820118-22 & Notice of Violation
ML20042B911
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/23/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20042B912 List:
References
NUDOCS 8203260267
Download: ML20042B911 (2)


See also: IR 05000346/1982004

Text

.

.

IFEg , ,

9

Docket No. 50-346

,

4'\\

/ 4

Toledo Edison Company

'

ATTN:

Mr. Richard P. Crouse

L,.ng

Vice President

$

,% $

'

Nuclear

J

-

Edison Plaza

. - -

MAR P,51982>

,.

-

300 Madison Avenue

'6

M WMG N3

Toledo, OH 43652

"$#

/

4

9)>/

8

Gentlemen:

g

This refers to the routine safety inspection conducted by Mt. M. M. Holzmcr

of this office on January 18-22, 1982, of activities at Davis-Besse Nuclear

Power Station authorized by NRC Operating License No. NPF-3 and to the dis-

cussion of our findings with J. Hickey at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

i

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such applicatian must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

8203260267 920223

hgol

PDR ADOCK 05000346

O

PDR

gg

_ _ _ _ _ _ _ . . _ _

- - - - . _ - . ._--- _ _

_

.. ._ _ _ _ __ _ - _ _

. _ - _ _

- _ _ _

-

!

f

.

.

hfE8 2 3 est

Toledo Edison Company

-2-

!

!

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

g

and your response to this letter will be placed in the Public Document

Room.

!

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

l'orf ofnsl $foned by C.1f.~)!oicifhW

J

j

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

.

Enclosures:

1.

Appendix, Notice

'

of Violation

2.

Inspection Report

No. 50-346/82-04

.

i

cc w/encls:

T. D. Murray, Station

Superintendent

.

DMB/ Document Control Desk (RIDS)

'

.

Resident Inspector, RIII

'

Harold W. Kohn, Power Siting

!

Commission

Helen W. Evans, State of Ohio

,

I

I

i

)

$

RIII

RTII

J1.

RIII

_

-, - . . - .

_

_ _ . _

. -

. . .-

_ . . _ . _ . _ . _ _ _ _ . . _ _ _ _ - . , _ . - _ . . . _ _ _ _ _ , . _ _ . _ .

-