Text
.
.
IFEg , ,
9
Docket No. 50-346
,
4'\\
/ 4
Toledo Edison Company
'
ATTN:
Mr. Richard P. Crouse
L,.ng
Vice President
$
,% $
'
Nuclear
J
-
Edison Plaza
. - -
MAR P,51982>
,.
-
300 Madison Avenue
'6
M WMG N3
Toledo, OH 43652
"$#
/
4
9)>/
8
Gentlemen:
g
This refers to the routine safety inspection conducted by Mt. M. M. Holzmcr
of this office on January 18-22, 1982, of activities at Davis-Besse Nuclear
Power Station authorized by NRC Operating License No. NPF-3 and to the dis-
cussion of our findings with J. Hickey at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
i
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such applicatian must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
8203260267 920223
hgol
PDR ADOCK 05000346
O
gg
_ _ _ _ _ _ _ . . _ _
- - - - . _ - . ._--- _ _
_
.. ._ _ _ _ __ _ - _ _
. _ - _ _
- _ _ _
-
!
f
.
.
hfE8 2 3 est
Toledo Edison Company
-2-
!
!
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
g
and your response to this letter will be placed in the Public Document
Room.
!
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
l'orf ofnsl $foned by C.1f.~)!oicifhW
J
j
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
.
Enclosures:
1.
Appendix, Notice
'
of Violation
2.
Inspection Report
No. 50-346/82-04
.
i
cc w/encls:
T. D. Murray, Station
Superintendent
.
DMB/ Document Control Desk (RIDS)
'
.
Resident Inspector, RIII
'
Harold W. Kohn, Power Siting
!
Commission
Helen W. Evans, State of Ohio
,
I
I
i
)
$
RIII
RTII
J1.
RIII
_
-, - . . - .
_
_ _ . _
. -
. . .-
_ . . _ . _ . _ . _ _ _ _ . . _ _ _ _ - . , _ . - _ . . . _ _ _ _ _ , . _ _ . _ .
-