Forwards IE Insp Repts 50-327/81-42 & 50-328/81-52 on 811206-820105 & Notice of Violation
ML20042B710
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/04/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20042B702 List:
References
NUDOCS 8203250558
Download: ML20042B710 (2)


See also: IR 05000327/1981042

Text

fe)/v

'

~

,

.

.

FEB 0 41982

Tennessee Valley Authority

ATTN: fir. H. G. Parris

flanager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

,

Gentlemen:

Subject:

Report Nos

327/8122'and 50-328/81-52

This refers to the routine safety inspection conducted by ftr. E. J. Ford of this

office on December 6,1981 - January 5,1982, of activities authorized by NRC

Operating License Nos. DPR-77 and DPR-79 for the Sequoyah facility.

Our

preliminary findings were discussed with !!r. C. C. flason, Plant Superintendent,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

,

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document .700m unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. -Such application must be consistent with the requirements

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of itanagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

0203250558 820317

gDRADOCK05000

_

.

.-

.

.

.

.

.

FEB 041982

Tennessee Valley Authority

2

Should you have any quastions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

I

F. S. Cantrell, Acting Chief

Reactor Project Branch 1

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-327/81-42

and 50-328/81-52

cc w/ encl:

H. J. Green, Director of Nuclear Power

,

G. G. Stack, Project Manager

'

C. C. liason, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

-

Licensing Section

M. J. Burzynski, Project Engineer

'

-

H. N. Culver, Chief, Nuclear Safety

Review Staff

bec w/ encl:

4

NRC Resident Inspector

i

Document fianagement Branch

State of Tennessee

.

II

,

'i

R

R

RII

RII

@

74

SBut r:dt

RCrlenjak

DQuick

RClewis~ 604ev/W3422

kJ/&/82

f//p82

yj/82

J/[/82

_

_

_

_

_

_

__

_ _ _