IE HQ FILE COPY fMR 101282 s
Docket No. 70-36(DETP)
Of secews S
Combustion Engineering, Inc.
AITN:
Mr. H. V. Lichtenberger D:- MARE M90p att35'T##N
'3 Vice President WAW (c Manufacturing og Y
Nuclear Power Systems Windsor, CT 06095 y
j Gentlemen:
This refers to the routine safety inspection conducted by Mr. C. C. Peck of this office on February 16-19, 1982, of activities at your Hematite facility authorized by NRC Special Nuclear Material License No. SNM-33 and to the discussion of our findings with Mr. J. A. Rode and members of his staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-phone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be estab-lished. Consistent with Section 2.790(b)(1), any such application must 7 44 s'.
1 667 8203250452 82O310 hl(
PDR ADOCK 07000036 C
MAR 10iM2 Combustion Engineering, Inc.
2 be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the claim that the information should bo withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely, k
G. W. Roy, Acting-Chief Technical Inspection Branch
Enclosure:
Inspection Report No. 70-036/82-01(DETP) cc w/ enc 1:
J. A. Rode, Plant Manager DMB/ Document Control Desk (RIDS)
RIII RIII RIII SI I
$ts
(%
fregr
~j2/ ~
Ridgway Ry Peckfj 9
3/9/82 8/7 NID
((p