Responds to NRC Re Violations Noted in IE Insp Rept 50-389/81-22.Corrective Actions:Welding Supervisors Instructed to Monitor Welds W/Ammeter Tongs on Daily Basis & Rept Any Violation
ML20042B465
Person / Time
Site: Saint Lucie 
Issue date: 01/08/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20042B464 List:
References
L-82-8, NUDOCS 8203250339
Download: ML20042B465 (3)


Text

,a P.O. BOX 529100 MI AMI, F L 33152

/

f_

7.s,,.

..) g l f'i}O 2 b FLOHIDA POWER & LIGHT COMPANY January 8, 1982 L-82-8 l

Mr. James P. O'Reilly Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: RII:EHG St. Lucie Unit 2 Docket No. 50-389/81-22 Florida Power & Light Company has reviewed the subject Inspection Report and our response is attached. There is no proprietary information contained in the report.

Very truly yours, g mL1 \\C' M

\\ obert E. Uhrig R

u Vice President Advanced Systems & Technology REU/DME/ah Attachment cc: Harold F. Reis, Esquire l

8203250 ADO M Of0hohh9 PDR PEOPLE.. SERVING PEOPLE

RII:EHG 50-389/81-22 Violation:

Inadequate Corrective Action for Welding i'rocedure Violations 10 CFR 50, Appendix B, Criterion V, as implemented by Topical Report TQARI-76A, requires the licensee to accomplish quality-related activities in accordance with prescribed procedural requirements.

Contrary to the above, on November 3,1981, the licensee failed to accomplish quality-related welding activities in accordance with the prescribed procedural requirements in that they used welding amperages below the minimum specified for welding reactor coolant pressure boundary joint CH-0147-002. The welding procedure designated for this joint, procedure WPS-43A, Rev.1, specified a minimum welding amperage of 65 amps when welding with 3/32 inch filler metal.

The licensee welded the root and hot pass of the joint with 3/32 inch diameter fiiler metal using 50 and 60 amps respectively.

Response

1.

We concur with the finding as specified on November 3,1981.

The Welding Procedure was violated in using lower amperage than specified in the Welding procedure Specification, on Joint CH-0147-002 as well as on two previous findings.

2.

The underlying cause in each case was that the welder was in error in assuming the correct amperage for WPS-43A R-3 and failed to review the requirements prior to making the repair weld.

3.

To increase the effectiveness of corrective action, we have recalled all Weld Repair Reports and placed a copy of the WPS in the jacket for the welders to review prior to making the weld.

4.

Corrective steps taken are:

a.

Welding Supervisors to monitor welds with ammeter tongs on a daily basis and report any violation of the WPS.

b.

Attach a Weld Procedure Specification with each Weld Repair Report for review of the essential and non-essential variables prior to making the weld.

c.

Discrepant Field Condition 0957 was written to request radiographic examination of the subject weld which was found to be acceptable.

5.

Full compliance has been achieved.

STATE OF FLORIDA

)

)

ss.

COUNTY OF DADE

)

Jack E. Vessely

, being first duly sworn, deposes and says:

That he is Director, Nuclear Affairs of Florida Power &

Light Company, the herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said E

b n

JackE.Vesselk Subscribed and sworn to before me this

[

day of Mme?%

19 [/

U 0

M43. JM e n 565'ARY PUBLIC, in[jind for the County of Dade, State of Florida hatary Fut.:c, Sa'e cf For:rb at L e ge My commission expires:

?' C'"*"

" 7 "" " " 3 e