ML20042B457

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/82-04 & 50-401/82-04 on 820209-12.No Noncompliance Noted
ML20042B457
Person / Time
Site: Harris  
Issue date: 03/03/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20042B458 List:
References
NUDOCS 8203250334
Download: ML20042B457 (2)


See also: IR 05000400/1982004

Text

a

.

.

.

MAR 0 3 1982

p

GL !?

Carolina Power and Light Company

.k

' s eo

ATTN:

Mr. J. A. Jones, Senior Executive

O'

\\'-'(

Vice President and Chief

'/

a ., ,

s

,

Operating Of ficer

j

y

411 Fayetteville Street

7

iM? _ -

Raleigh, NC 27602

(d;

< -

,7

Gentlemen:

,

q

,

s

/

Subject: Report Nos.h/i2-04)d 50-401/82-04

Nis

This refers to the routine safety inspection conducted by Mr. A. B. Ruf f of

this office on February 9-12, 1982, of activities authorized by NRC Construc-

tion Permit Nos. CPPR-158 and CPPR-159 for the Shearon Harris facility and to

the discussion of our findings held with Mr. R. M. Parsons, Site Manager, at

the conclusion of the 1,spection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosure:

See Page 2

r203250334 020303

PDR ADOCK 05000400

m

PDR

TEo l Q

"

-

.

.

Carolina Power and Light Company

2

Enclosure:

Inspection Report Nos. 50-400/82-04

and 50-401/82-04

cc w/ encl:

R. Parsons, Site Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of North Carolina

RII

R

RII

RII

,

RII y t

'

AB ff': ht

TEConlon

ARHerdt

CJu

n

FSCantrell

2/ l/82

p/j /82

'3/g /82

3 /s /82

y/; /82