Text
____-__ _____ _
1 l
g a ra DISTRIBUTION Olh Qortg!~Fil e)
NRC PDR L PDR TERA Docket flo. 50-302 NSIC ORB #4 Rdg DEisenhut y
g OELD fir. J. A. llancock AE0D
('-
D Vice President IE
'/
AlTN: !!anager, fluclear Licensing RIngram
'-[ 9 0p'N&%
iluclear Operations ACRS-10 7
Florida Power Corporation SMiner
~
/1 1
4t w,7 3 E32 x 3, hd P. O. Box 14042; H.A.C. Il-2 TNovak "A,C ' 'd N
St. Petersburg, Florida 33733 Gray File EBlackwood A,/ Q7p S
Dear Hr. llancock:
H0rnstein This confirms our telephone authorizations of March 3,1982, and Itarch 9,1982, with regard to the operation of the Crystal River Unit flo. 3 Nuclear Generatin;, Plant (CR-3). On March 3,1933, we authorized operation of the CR-3 plant provided the plant was operated at no more than 75% full power while you provided justification for the increased response time of the Reactor Coolant Pump Power flonib rs (RCPPMs) over that provided for in the Technical Specifications (TSs). You indicated the change in response time was required to attempt to avoid spurious reactor trips associated with the RCPP!fs.
We have ie' viewed the information you provided with regard to the proposed new response time for the RCPPils and find the proposed response time (<0.560 sec.) acceptable. This response time satisfies the safety analysis that auth rized the increase in CR-3 power from 2452 !!wt to 2544 Mwt (Amendment 41).
Based on our review of your March 9,1982 letter, we concluded that the <0.560 sec response time is acceptable and achievable accordingly we ' iuthorized operation of CR-3 at 100% power on !! arch 9,1982.
Facility Operating License flo. DPR-72 was amended on !! arch 3,1982, by making the following TS change:
Table 3.,3.2 was revised to add the following note:
" Operation of CR-3 is limited to a maximum of 75% full power with th.e RCPP!! response times greater than 0.47 sec until the proposed <0.560 sec response time is justified."
8203240098 820312 DR ADOCK 0500o302 PDR l
F
. Facility Operating License flo. DPR-72 was amended on March 9,1982, by making the following TS change:
Table 3.3.2 was revised by making the following changes:
1.
Deleting the ebove-specified note which was added !! arch 3,1982 2.
Revising line 8 to change the nuclear overpower based on RCPPit response time from <0.47 secs to < 0.56 secs.
Copies of the license amendment, our evaluation and Federal Register notice for the TS change will be sent to you when completed.
Sincerely,
- ,6; 9 X i 1.g,,
Thomas H. flovak, Assistant Director for Operating Reactors Division of Licensing cc: See next page l
l l
1
/
ORB #4:DL RB#4:D ~
f0RIDL
... ORB #4 : DL 'V.
..i...
...1.......
omce > S.M.i n er ; cfh'. 7..
..p
,,,,JS,5,[.E'...
1,i,0,y,a,((j?' gram,,
n g
suncus >
...3d
. 2... Qif)t.{t..
3.tl.Y.82........
OFFICIAL. RECORD COPY nac ronu m oa.ao> uncu ano osam mi_33m
=
=w 50-302 Crystal River Unit flo. 3 Flcrida Power Ccrporation ccw/ enclosure (s):
fir. S. A. Brandimore Florida Power Corporation Mr. Robert B. Borsum Vice President and General Counsel Babcock & Wilcox P. O. Box 14042 Nuclear Power Generation Division St. Petersburg, Florida 33733 Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20014 Mr. Wilbur Langely, Chainnan
%ard of County Commissioners Mr. Tom Stetka. Resident Inspector Citrus County U.S. Nuclear Regulatory Comission Iverness, Florida 36250 Route f3. Box 717 Crystal River, Florida 32629 Regional Radiation Representative Mr. T. C. Lutkehaus Nuclear Plant Manager EPA Region IV Florida Power Corporation 345 Courtland Street, N.E.
Atlanta, Georgia 30308 P. O. Box 219 Crystal River, Florida 32629 Bureau of Intergovernmental Relations 660 Apalachee Parkway Crystal River Public Library Tallahassee, Florida 32304 668 N. W. First Avenue Crystal River, Florida 32629 Administrator Department of Environmental Regulation Power Plant Siting Section i
l State of Florida l
2600 Blair Stone Road Tallahassee, Florida 32301 i
Attorney General l
Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Rcgion II 101 Marietta Street, Suite 3100 l