Text
F
.,
,
MAR 2
082
Docket No. 50-255
Consumers Power Company
ATTN:
Mr. R. B. DeWitt
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
B. L. Jorgensen and J. K. Heller of this office during January 1982, of
activities at the Palisades Nuclear Generating Plant authorized by NRC
Provisional Operating License No. DPR-20 and to the discussion of our
findings with Mr. R. W. Montross and others of your staf f at the con-
clusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
torviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence. Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
In accordance with IJ CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established.
Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
8203230005 820302
PDR ADOCK 05000255
G
fc) /
I 8 lt
_ . . .
.
.
Consumers Power Company
2
March 2, 1982
and which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
f
Wv
5
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-255/82-01(DPRP)
cc w/encls:
D. J. VandeWalle, Nuclear
Licensing Administrator
R. W. Montross, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry
r8
RIII
RIII
RIII
h 5v
WL g e-
Boyd/so
Knop
SptDaro
3(
2/23/82
'I/g
/
l