ML20042A039

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-255/82-01 on 811230 & 820104-30 & Notice of Violation
ML20042A039
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/02/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20042A040 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8203230005
Download: ML20042A039 (2)


See also: IR 05000255/1982001

Text

F

.,

,

MAR 2

082

Docket No. 50-255

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI 49201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

B. L. Jorgensen and J. K. Heller of this office during January 1982, of

activities at the Palisades Nuclear Generating Plant authorized by NRC

Provisional Operating License No. DPR-20 and to the discussion of our

findings with Mr. R. W. Montross and others of your staf f at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

torviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix.

The inspection showed that action had been taken to correct the identified

noncompliance and to prevent recurrence. Consequently, no reply to this

noncompliance is required and we have no further questions regarding this

matter at this time.

In accordance with IJ CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that

a new due date may be established.

Consistent with Section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

8203230005 820302

PDR ADOCK 05000255

G

PDR

fc) /

I 8 lt

_ . . .

.

.

Consumers Power Company

2

March 2, 1982

and which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

f

Wv

5

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-255/82-01(DPRP)

cc w/encls:

D. J. VandeWalle, Nuclear

Licensing Administrator

R. W. Montross, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Myron M. Cherry

r8

RIII

RIII

RIII

h 5v

WL g e-

Boyd/so

Knop

SptDaro

3(

2/23/82

'I/g

/

l