_ - _ . _ _ _ _ _ _ _ - . __. _

i .

mim OPERATING DATA REPORT .

ES DOCKET NO. 50-266

>S ~

gg -

DATE May 7, 1981 ou

  • $ . COMPLETED BY C. W. FAY O ,

una o- -

TELEPHONE 414 277 2011

@@IPERATING STATUS

go;;

m$ 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .

2. REPORTING PERIOD: APRIL 1981 .
3. LICENSED THERMAL POWER (MWT): 1518. .
4. NAMEPLATE RATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. .
6. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE): 519. .
7. MAXIMUM DEPENDADLE CAPACITY (NET MWE): 495. . . . . . . . . . . . . . . . . . . . . . . . .

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORTr GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): 390.0
10. REASONS FOR RESTRICTIONS, (IF ANY): XEEXWIKEAICINSEN! OOC Power restriction is the result of a self-imposed reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubes within the tubesheet crevice. THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD -

719 2,079 91,095

12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,876.0 76,310.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.3 606.0
14. HOURS GENERATOR ON LINE 719.0 2,870.0 74,006.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 764.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 874,796 3,451,659 102 290r103
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 282,160 1,120,400 34,300,120
18. NET ELECTRICAL ENERGY GENERATED (MWH) 267,520 1,063,254 32,730,540
19. UNIT SERVICE FACTOR 100.0 99.7 80.5
20. UNIT AVAILABILITY FACTOR 100.0 99.7 81.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 75.2 74.6 73.1
22. UNIT CAPACITY FACTOR (USING DER NET) 74.9 74.3 71.7
23. UNIT FORCED OUTAGE RATE 0.0 0.3 3.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):

Steam generator eddy current inspection June 19, 1981, expected to last from two to four weeks.

25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND F(.CTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

, I i i w .s .

e --- I -

OPERATING DATA REPORT .

DOCKET NO. 50-301 DATE May 7, 1981 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS

1. UNIT NAME: POINT DEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: APRIL 1981 .
3. LICENSED THERMAL POWER (MWT): 1518. .
4. NAMEPLATE RATING (GROSS MWE): 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. .
6. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE:: 519. .
7. MAXIMUM DEPENDADLE CAPACITY (NET MWE): 495. . . . . . . . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY 9ATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICADLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS HONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 719 2,879 76,600
12. NUMBER OF HOURS REACTOR WAS CRITICAL 308.6 2,540.6 69,090.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 106.3
14. HOURS GENERATOR ON LINE 305.5 2,545.5 67,844.0
15. UNIT RESERVE SHUTDOWN HOURS 3.0 3.0 126.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 559,549 3,795,009 92,505,635
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 190,320 1,284,440 31,400,290
18. NET ELECTRTCAL ENERGY GENERATED (MWH) 190,352 1,227,704 29,891,205
19. UNIT SERVICE FACTOR 53.6 08.4 08.G
20. UNIT AVAILABILITY FACTOR 54.0 08 5 00.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 50.7 06.2 79.4
22. UNIT CAPACITY FACTOR (USING DER NET) 50.5 85.8 70.4
23. UNIT FORCED OUTAGE RATE 00 0.0 1.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF STARTUP: MAY 22, 1981 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMDER 22, 1.977 i

g j *a l

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-266 Unit Nane Point Beach' Unit 1 Date May 7, 1981 Completed By C. W. Fay -

Telephone 414/277-2811 . _ .

Unit 1 operated at 390 MWe throughout the period with two load reductions. On April 2, 1981, at 0316 hours0.00366 days <br />0.0878 hours <br />5.224868e-4 weeks <br />1.20238e-4 months <br />, Unit 1 power was reduced to 369 MWe as directed by the Power System Supervisor and returned to 392 MWe at 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br />.

At 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br /> on April 19, 1981, power was reduced to 290 MWe for turbine stop valve testing. The unit was returned to full load at 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> on the same day.

Safety-related maintenance during the period was performed on the 3D Diesel on April 8, 1981. The Diesel was returned to service the sane day.

At 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> on April 25, 19 81, while conducting quarterly inservice testing of containment spray valves (I T-50 ) , spray valve 1-860D (containment spray pump discharge -

valve) failed to open. The redundant valve was tested satisfactorily, as were duplicate function valves in the a "A" train. This event is reportable under Technical Specifi-cation 15.6.9.2.B.2. as a condition leading to operation in a degraded mode permitted by a limited condition of operation.

The closing torque switch for 1-860D was adjusted, the valve was retested and returned to service at 0803 hours0.00929 days <br />0.223 hours <br />0.00133 weeks <br />3.055415e-4 months <br />, April 25, 1981. This occurrence will be filed under Licensee Event Report No. 81-004/03L-0, Unit 1.

g l

.o e

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docke t No. 50-301 Unit Nane Point Beach Unit 2 Date May 7, 1981 Completed By C. W. Fay .

Telephone 414/277-2811 . _ _ , _

Unit 2 operated at 4 75 MWe with no load reductions until 22 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> on April 16, 1981, when load reduction prior to the refueling outage commenced. At 0132 hours0.00153 days <br />0.0367 hours <br />2.18254e-4 weeks <br />5.0226e-5 months <br /> on April 17, 1981, Unit 2 was taken off line for refueling.

Reactor shutdown was completed the same day at 1655 hours0.0192 days <br />0.46 hours <br />0.00274 weeks <br />6.297275e-4 months <br /> following end-of-life physics testing and training startups.

Cooldown and draindown of the reactor coolant system was completed by 0052 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> on April 19, 1981. Eddy current inspections of both generators were completed on

. April 24, 1981. Twen ty- five (25) tubes in the "A" steam generator and 16 tubes in the "B" steam generator were verified to have degradations greater than 40% and were plugged. This is reportable in accordance with Technical Specification 15.6.9. 2. A. 3 as an abnormal degradation in a -

reactor coolant pressure boundary. The report will be filed as Licensee Event Report No. Sl-002/0lT-0, Unit 2. .a Maintenance work included seal replacement for both reactor coolant pumps, reactor vessel head stripping, fire protection modifications, and turbine overhaul.

m t

.m o

( A 0D 1 -

,2 N 73 o 8B

)

I D

c SF a t .

,. . e SF co hr ec de ud age a l .

e d a p g a s.oc c: g u o ~

t 1

GFEDCBAR N 1

- - - - - - - e Me moc a

OOAORRMEs -

tp dp e e a q o U h e m e g fiu n gvj0 ow- t N

R e r ir u u n i: c jaiCt

m. w E I r a n a le tp - D titalem 8g gooDo4 P T t

O

( isotine R S eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D a iaR a Re N O iEvie oi en T W nrans rl ps H N

) r it u oe S o gi nr Tr re r ee t A c s E N

( &t t( Nv A D e i e p x Lo x .o ne P p in p t r O l c l i W

+ a e a l E

i n i u

R n s n )gveG

) e )

go'e9 1

9 R 8 E E D x 1 U

a C m T 3EyaoC4 U e n s I

O 3 N S

4321M

- e t C OAMMh a tuaao Tu htnnd os eouu: e rmaa P all ra C

( t en TO eiS vd EM D xcc e LP UO p r nC EL NC lSa to PE IK acm r HT TE ir Rr OE T na ee NDDN

) m cc E AAN ut BTMO 5 r i. YEE.

I*l rv SE ( Sate ee 4 C M P 5 ox Nhtix .

n I 1 . a o 0 uh U e io h cA 4 y i ri Reoni ec / W n 2 cb Etnsb t 2 . 7 t 6 ei Gs i i 7 ,

6 t - oft o 7 F B 0ffo n - a 1 e I 1o rG 2 y 9 a

- 6rD - 8 8 c 1 API 1 1 h S ) Ltrn 1 a Eaes U .

m R pt n .

e Ear i Fnru t it - c lr - 1 ey

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 301 UNIT NAME Poin t Beach Unit 2 REPORT MONTH Ap ri l , 1981 [U(TE May 7. 1981 COMPLETED BY c. W. Fav TELEPHONE 414/277-2811 i

u C MWo o o

asau "co 4t mon Po am L

co No. Date g gg g jgy Licensee Event gg e am g] Cause and Corrective Action o a sc Report No. m EU To Prevent Recurrence a- m gmg g*

o Q

l 810417 S 334.5 C 1 N/A N/A N/A The unit was shut down for its annual refueling outage. Major work items performed during the outage included eddy current inspection of the steam generators, reactor coolant pump seal replace-ment, TMI-related and penetration' modi fica tions , feedwater heater cleaning and inspection, and high pressure turbine overhaul. The unit is scheduled to return to service on May 22, 1981 1

F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram D- Regulatory Restriction Sheets for LER File 4- Other (explain) (NUREG-0161)

E- Operator Training & License Exam F- Administrative AD-28B G- Operational Error (explain) 5' Exhibit I- Same (01-78) H- Other (explain) i

.' Source I I i l ,a " #* . -

DOCKET NO. 50-266 -

UNIT NAME Point Beach Unit 1

  • DATE May 7, 1981 COMPLETED BY C. W. Fay TELEPIIONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH April, 1981 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 361 11 372 21 373 2 372 12 370 22 373 3 371 13 372 23 174 4 373 14 374 24 171 5 373 15 373 25 375 6 373 16 373 26 372 7 373 17 374 27 374 8 373 18 373 28 374 9 -

370 19 366 29 373 10 373 70 374 30 371 31 ---

AD-28A i

(1-77) i g_ ,3 =S I

DOCKET NO. 50-301 . -

UNIT NAME Point Beach Unit 2

  • DATE May 7, 1981 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH April, 1981 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 483 11 470 21 -

2 2 481 12 469 22 -

2 3 482 13 459 23 -

2 4 483 14 463 24 -

2 5 480 15 459 - 25 -

2 C 479 16 454 26 -

2 7 477 17 -

1 27 -

2 8 474 18 -

9 28 -

1 9 472 19 -

3 29 -

2 10 468 20 -

2 30 -

2 31 ---

AD-28A -

(1-77) '

, i s s t g g [4 t..I ____l__ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ .