ML20041G211
| ML20041G211 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/07/1981 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20041G207 | List: |
| References | |
| NUDOCS 8203190398 | |
| Download: ML20041G211 (8) | |
Text
_ - _.
i mim OPERATING DATA REPORT ES DOCKET NO. 50-266
>S
~
gg DATE May 7, 1981 ou COMPLETED BY C.
W.
FAY O
una o-TELEPHONE 414 277 2011
@@IPERATING STATUS
- go;; 1.
m$
UNIT NAME:
POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTING PERIOD:
APRIL 1981 3.
LICENSED THERMAL POWER (MWT):
1518.
4.
NAMEPLATE RATING (GROSS MWE):
523.8 5.
DESIGN ELECTRICAL RATING (NET MWE):
497.
6.
MAXIMUM DEPENDADLE CAPACITY (GROSS MWE):
519.
7.
MAXIMUM DEPENDADLE CAPACITY (NET MWE):
495.
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORTr GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
390.0
- 10. REASONS FOR RESTRICTIONS, (IF ANY): XEEXWIKEAICINSEN! OOC Power restriction is the result of a self-imposed reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubes within the tubesheet crevice.
THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719 2,079 91,095
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,876.0 76,310.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.3 606.0
- 14. HOURS GENERATOR ON LINE 719.0 2,870.0 74,006.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 764.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 874,796 3,451,659 102 290r103
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 282,160 1,120,400 34,300,120
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 267,520 1,063,254 32,730,540
- 19. UNIT SERVICE FACTOR 100.0 99.7 80.5
- 20. UNIT AVAILABILITY FACTOR 100.0 99.7 81.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 75.2 74.6 73.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 74.9 74.3 71.7
- 23. UNIT FORCED OUTAGE RATE 0.0 0.3 3.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
Steam generator eddy current inspection June 19, 1981, expected to last from two to four weeks.
- 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF STARTUP:
NOT SHUTDOWN DATA REPORTED AND F(.CTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 I
i i
w.s e
I
OPERATING DATA REPORT DOCKET NO. 50-301 DATE May 7, 1981 COMPLETED BY C.
W.
FAY TELEPHONE 414 277 2811 OPERATING STATUS 1.
UNIT NAME:
POINT DEACH NUCLEAR PLANT UNIT 2 NOTES 2.
REPORTING PERIOD:
APRIL 1981 3.
LICENSED THERMAL POWER (MWT):
1518.
4.
NAMEPLATE RATING (GROSS MWE):
523.8 5.
DESIGN ELECTRICAL RATING (NET MWE):
497.
6.
MAXIMUM DEPENDADLE CAPACITY (GROSS MWE::
519.
7.
MAXIMUM DEPENDADLE CAPACITY (NET MWE):
495.
8.
IF CHANGES OCCUR IN CAPACITY 9ATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICADLE 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NOT APPLICABLE THIS HONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719 2,879 76,600
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 308.6 2,540.6 69,090.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 106.3
- 14. HOURS GENERATOR ON LINE 305.5 2,545.5 67,844.0
- 15. UNIT RESERVE SHUTDOWN HOURS 3.0 3.0 126.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 559,549 3,795,009 92,505,635
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 190,320 1,284,440 31,400,290
- 18. NET ELECTRTCAL ENERGY GENERATED (MWH) 190,352 1,227,704 29,891,205
- 19. UNIT SERVICE FACTOR 53.6 08.4 08.G
- 20. UNIT AVAILABILITY FACTOR 54.0 08 5 00.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 50.7 06.2 79.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 50.5 85.8 70.4
- 23. UNIT FORCED OUTAGE RATE 00 0.0 1.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF STARTUP:
MAY 22, 1981 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMDER 22, 1.977 i
g j
- a l
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-266 Unit Nane Point Beach' Unit 1 Date May 7, 1981 Completed By C. W.
Fay Telephone 414/277-2811 Unit 1 operated at 390 MWe throughout the period with two load reductions.
On April 2, 1981, at 0316 hours0.00366 days <br />0.0878 hours <br />5.224868e-4 weeks <br />1.20238e-4 months <br />, Unit 1 power was reduced to 369 MWe as directed by the Power System Supervisor and returned to 392 MWe at 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br />.
At 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br /> on April 19, 1981, power was reduced to 290 MWe for turbine stop valve testing.
The unit was returned to full load at 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> on the same day.
Safety-related maintenance during the period was performed on the 3D Diesel on April 8, 1981.
The Diesel was returned to service the sane day.
At 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> on April 25, 19 81, while conducting quarterly inservice testing of containment spray valves (I T-50 ), spray valve 1-860D (containment spray pump discharge valve) failed to open.
The redundant valve was tested a
satisfactorily, as were duplicate function valves in the "A"
train.
This event is reportable under Technical Specifi-cation 15.6.9.2.B.2. as a condition leading to operation in a degraded mode permitted by a limited condition of operation.
The closing torque switch for 1-860D was adjusted, the valve was retested and returned to service at 0803 hours0.00929 days <br />0.223 hours <br />0.00133 weeks <br />3.055415e-4 months <br />, April 25, 1981.
This occurrence will be filed under Licensee Event Report No. 81-004/03L-0, Unit 1.
g l
.o e
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docke t No.
50-301 Unit Nane Point Beach Unit 2 Date May 7, 1981 Completed By C.
W.
Fay Telephone 414/277-2811 Unit 2 operated at 4 75 MWe with no load reductions until 22 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> on April 16, 1981, when load reduction prior to the refueling outage commenced.
At 0132 hours0.00153 days <br />0.0367 hours <br />2.18254e-4 weeks <br />5.0226e-5 months <br /> on April 17, 1981, Unit 2 was taken off line for refueling.
Reactor shutdown was completed the same day at 1655 hours0.0192 days <br />0.46 hours <br />0.00274 weeks <br />6.297275e-4 months <br /> following end-of-life physics testing and training startups.
Cooldown and draindown of the reactor coolant system was completed by 0052 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> on April 19, 1981.
Eddy current inspections of both generators were completed on April 24, 1981.
Twen ty-five (25) tubes in the "A"
steam generator and 16 tubes in the "B"
steam generator were verified to have degradations greater than 40% and were plugged.
This is reportable in accordance with Technical Specification 15.6.9. 2. A. 3 as an abnormal degradation in a reactor coolant pressure boundary.
The report will be filed as Licensee Event Report No. Sl-002/0lT-0, Unit 2.
.a Maintenance work included seal replacement for both reactor coolant pumps, reactor vessel head stripping, fire protection modifications, and turbine overhaul.
m t
.m o
A
(
0D 1 -
,2 N
73 o
8B
)
I D
c SF a
t e
SF co hr ec de a
ud age l
ed a p g a s.oc c: g u o ~
t GFEDCBAR N
1 Me moc 1- - - - - - -
ea OOAORRMEs tp dp e e a q o U
h e m e g fiu n gvj0 ow t
R N
e r ir u u n i:
w
- m. jaiCt E
I c
D P
T r a n a le tp titalem 8g gooDo4 O
t isotine R
S (eotronan T
H xnr rgnt L
U paaTy c
i M
T lltr eF c
O D
a iaR a
Re N
O iEvie oi en T
W nrans rl ps H
N r
it u
oe S
)
o nr Tr re r
gi ee t
A c
s E
N
(
&t t(
Nv D
A e
i e
.o e p
x Lo x
n P
p in p
t r
O i
l c
l W
l
+
a e
a E
i n
i R
u)gveG n
s n
1 e
go'e9 R
)
)
9 E
8 E
D 1
x U
a C
m T
3EyaoC4 I
n s
U e
O 3
N S
4321M e
t C
OAMMh a
tuaao Tu htnnd os eouu:
e rmaa P
all ra C
( t en TO eiS vd EM D
xcc e
LP UO p
r nC EL NC lSa to PE IK acm r
na ee NDDN m
cc E
AAN
)
ut BTMO 5
r i.
YEE.
I*l rv ox Nhtix ee I
1 Sate SE
(
4 C M P 5
n a o 0
uh U e io h cA 4
y i
ri Reoni ec
/ W n
2 cb Etnsb t
2 7
t 6
ei Gs i
i 6
7 t
oft o
7 F
B 0ffo n
- a 1
e I
1o rG 2
y 9
a 6rD 8
8 c 1
API 1
1 h
Ltrn S
)
1 a
Eaes U
m R
pt n
e Ear i
Fnru t
it - c lr 1
ey
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 301 UNIT NAME Poin t Beach Unit 2
[U(TE May 7.
1981 REPORT MONTH Ap ri l, 1981 COMPLETED BY c.
W.
Fav TELEPHONE 414/277-2811 i
u C
MWo o
as "c
4t Po L
- o au o
mon am co No.
Date g
gg g
jgy Licensee Event gg g]
Cause and Corrective Action e
am o
a sc Report No.
m EU To Prevent Recurrence a-m gmg g
o Q
l 810417 S
334.5 C
1 N/A N/A N/A The unit was shut down for its annual refueling outage.
Major work items performed during the outage included eddy current inspection of the steam generators, reactor coolant pump seal replace-ment, TMI-related and penetration' modi fica tions, feedwater heater cleaning and inspection, and high pressure turbine overhaul.
The unit is scheduled to return to service on May 22, 1981 1 F: Forced Reason:
Method:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) l-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam AD-28B 5' Exhibit I-Same F-Administrative G-Operational Error (explain)
(01-78)
H-Other (explain)
.' Source i
I I
i l
,a
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE May 7, 1981 COMPLETED BY C.
W.
Fay TELEPIIONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH April, 1981 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
361 11 372 21 373 2
372 12 370 22 373 3
371 13 372 23 174 4
373 14 374 24 171 5
373 15 373 25 375 6
373 16 373 26 372 7
373 17 374 27 374 8
373 18 373 28 374 9
370 19 366 29 373 10 373 70 374 30 371 31 AD-28A i
(1-77) i
=S I
g_
,3
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE May 7, 1981 COMPLETED BY C.
W.
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH April, 1981 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
483 11 470 21 2
2 481 12 469 22 2
3 482 13 459 23 2
4 483 14 463 24 2
5 480 15 459 25 2
C 479 16 454 26 2
7 477 17 1
27 2
8 474 18 9
28 1
9 472 19 3
29 2
10 468 20 2
30 2
31 AD-28A (1-77) i s
s t
g g [4 t..I l
.