ML20041G156
| ML20041G156 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/11/1982 |
| From: | Starkey R CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20041G157 | List: |
| References | |
| RSEP-82-460, NUDOCS 8203190337 | |
| Download: ML20041G156 (1) | |
Text
8 CP&L 6
Carolina Power & Light Company wnm~.nn-m g
gECG; H. B. ROBINSON STEAM ELECTRIC PLANT C frfgI.
8 7pg A POST OFFICE BOX 790 3
IIARTSVILLE, SOUTH CAROLINA 29550 Y
MAR 1 11982
(,
/
!J B Robinson File No:
13500 SERIAL: RSEP/82-460 Mr. Richard C. DeYoung, Director Of fice of Inspections and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 H.
B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power and Light Company herewith submits the report of operation statistics and shutdown experience for the month of Feb rua ry,1982.
Line 17 of the Operating Data Report, which is Gross Electrical Fnergy Generated, has been adjusted to compensate for a +2000 MWH discrepancy that originated during the 1974 report year. The difference was caused by an arithmetical error made during the calculations for cumulative gross electrical generation.
The discrepancy was recently discovered l
when comparison was made between plant data and general of fice data.
Very truly yours, to W
'tR. B. Starkey, Jr.
General Manager H. B. Robinson S.E. Plant i
HRN/bs Enclosure l
cc:
R. A. Hartfield (2) l J. P. O'Reilly (1)
Y l,
G' \\
8203190337 82031i PDR ADOCK 05000*6 R
i--=