ML20041G161
| ML20041G161 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/02/1982 |
| From: | Norris H CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20041G157 | List: |
| References | |
| NUDOCS 8203190341 | |
| Download: ML20041G161 (3) | |
Text
'
, Enclosure to Serial: RSEP/82-460 Page 1 of 3 0
OPERATING LATA REPORT 50-261 DOC)'ET NO. -
D U E _820302 C05tPLETED fly
- 11. Ray Norris TELEPl!0NE 3803) 383-4524-OPEl( ATING STATl_S
- 1. Unit Naue:
II. B. Roblnson Unit Two Notes
- 2. Reporting Period: 820201,0000/820228,2400 There are presently 113
- 1. Licen2d Thenna! Pnw.r (Mht):
2300 spent fuel assemblies
- 4. Nameplate Ratin;(Cross MW,j:
739 in the spent fuel pool.
- 5. Des!;n E!cetrical.3 sting (Net SISe). 700
- 6. Statimum Dependable Cap city (Grots MWe):.__7 00
- 7. Maxisaurt ependsb!e C2pae:ty (Net Mhe).
665 D
- 8. If Ch:n;es 0; cur in Capa :ty R:tmp titema Number 3 Throup 7) Sin:e Last Report.Give Reasons:
No Change
- 9. Power 1.nd Tu Which Re4:ricted.lf Any: Net 31we): Approxitnately 535 (80% Reactor Power)
- 10. !!casons for Restrictions. ll Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations This Month Yr. to.Date Cume!stise
- 11. liouss in P.e; orting Pesiod 672 1,416 96,342
- 12. Nucht Of Meun Reacter Was Critical 623.I 1.367.1 73,712.52
- 13. Reactor Re ette Sh udown Hours 0
0-1,085.3(T
- 14. llours Gener,ator On Line 623.1 1,367.1 71,922.41 lb. Unit Resene Shutdown flours 0
0 23.20
- 16. Grow Thenna: Er.ergy Gerierated IMWil) 1.140.062 2.501.310 145,596,684
- 17. Gross E!cetrical Energy Generated IMWii) 362.I15_,.
798.330
- h 8_7,6,300 _
IS. Net Eleerrical Energy Generated (31Wii) 339.362 750.438 M 70,689
- 19. l'ait Senice Facter 92.72 96.54 74.65
- 20. Unit As:ilM!ity Fastcr 92.72 96.54 74.67
- 21. Unit Capacity Faetor IUsing MDC Nett 75.94 79.69 69.25
- 22. Unit C.ipaeny Factor (U>ing DER Net) 7 2, l_4_,
75.71 65.79
- 23. Unit ForceJ Outage Rate 0
0 14.35
- 24. Shutdou ns Sehe tuled Oser Nest ti Months (Typ.. Date.and Duration of Eacht:
NONE
- 25. If Shur Down A End Of Report PerioJ. Estiinated Date of Startup:
June 2, 1982
- 26. Units in in: Status Prior to Connnercial Orerationi:
Fete m Achiesed INITIA L CRi f!CA LITY INITI A1. Et LCT~ 'E;TV COMMERCIAI. OPER A TlON
- This is an adjustment of +2,000 MWil to correct a discrepancy which origino
- the 1974 report year.
0500gil 82O 92 DR
(
R
~
Enclosure to Serial: RSEP/82-460 Page 2 of 3 AVERAGE DAILY UNIT POWER LEVEL 50-261 DOCKET NO.
UNIT Two DATE 820302 COMPLETED BY
- 11. Ray Norris TELENIONE (803) 383-4524 MONT11 February DAY AVERAGE DA!LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)
(ywe. Net) 1 565 561-37 2
565 558 gg 564 558 3
4 565 558 20 564 558 g
21 563' 58 6
22 7
563 558 73 562 557 8
9 562 558 23 10 562 516.'
2(,
562 24, gg 7
559 0
12 23 13 366 9
00 14 30 561 15 560 16 INSTRUCTIONS On this format. list the av::ag daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole tr.epw.tt.
14/7 7)
Enclocure to Serial:- RSEP/82-460 Page 3 of 3 50-261 DCCKET NO B. Robinson,Two UNIT S!!UIDOWNS AND POWER REDUCTIONS UNIT NA%:d H.
DATE _820102 CO.\\tPLETED PY
_H. Rav Norris _
_803) 383-4524_
(
TEl.1Pi!ONi-REPORT ?.!ONTl! __ Februarv --
r 4
I l)YkI
[g !
f^'o Cause 1 Currettive Licensee j?
Action to c-s M?
Date g
3g 4
jsE Event Jiv 8V Preseni Recurrence 3:
e 3 gg.:
Repost =
u e
t6 I
4 HB HTEXCH Power reduction to 3 80% due to t
02-01 820201 S
0 lA steam generator considerations.
HC HTEXCH Power reduction from 3 80% to 50% due to condenser tube leaks.
02-02 820212 S
0 B
4 Leaking tubes were plugged and 3
l the unit returned to'2 SO% power.
Shutdown for Maintenance / Refueling ZZ ZZZZZZ i
820226 S
48.90
.B/C 3
Outage.
l02-03 g
e i
u l
4 3
Exhibit G. Instrot:iens 2
Me: hod:
for Prepar.: tion of DJf a F: F.n.ed Reason:
I-Shnual Entry Sheeis for !xensee S: Sdeda'ed A E*:uipment Fath>re(Fsphin) 2.M. nir21 Scram.
Event Repoit iLt.RI1: ale tNURIT.-
if-Maintenane: of Tes:
3 Autonutic Scram.
0161)
C Refuelin;;
4 Onties (Explain)
D He;;ula:ory Restriction 1 Opciatar Tr:.iningi License Examinatitm 5
F Adnu:iistranve Fstubit I - Same S.~.cc G Operatinal Esiur (Explam)
('i/77 }
Il-OihetiLs;% m)
_