Other: 05000369/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Encl, 05000369/LER-1982-007-03, /03L-0:on 820111,many Instrument Lines Froze W/ Instruments Declared Inoperable Leading to Inadvertent Actuation of ESF Causing Safety Injection,Steamline Isolation & Reactor Trips.Caused by Cold Weather, ML20041D804, ML20041F409, ML20054D822, ML20058H422, ML20065C404, ML20065C422, ML20066B310, ML20066B319
|
MONTHYEAR05000369/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Encl1982-02-16016 February 1982 Forwards LER 82-007/03L-0.Detailed Event Analysis Encl Project stage: Other 05000369/LER-1982-007-03, /03L-0:on 820111,many Instrument Lines Froze W/ Instruments Declared Inoperable Leading to Inadvertent Actuation of ESF Causing Safety Injection,Steamline Isolation & Reactor Trips.Caused by Cold Weather1982-02-16016 February 1982 /03L-0:on 820111,many Instrument Lines Froze W/ Instruments Declared Inoperable Leading to Inadvertent Actuation of ESF Causing Safety Injection,Steamline Isolation & Reactor Trips.Caused by Cold Weather Project stage: Other ML20041D8041982-03-0202 March 1982 Proposed Tec Specs 3/4.5.4 & 3/4.6.1 Re Boron Injection Sys & Primary Containment,Respectively Project stage: Other ML20041D7991982-03-0202 March 1982 Application for Amend to License NPF-9,proposing Changes to Tech Specs 3/4.5.4 & 3/4.6.1 Re Boron Injection Tank & Primary Containment,Respectively.Justification & Safety Analysis & marked-up FSAR Pages Encl.W/Class II & III Fee Project stage: Request ML20041F4091982-03-0909 March 1982 Requests Approval for 72-h Min Be Granted for Implementation of New Boron Concentration Limits in Order to Prevent Unnecessary Shutdown.New Boron Limits Described in 820302 Proposed Tech Specs Change Currently Under NRC Review Project stage: Other ML20054D8221982-04-19019 April 1982 Forwards Addl Info Requested by NRC Re 820302 Proposed Tech Spec Change Reducing Boron Concentration in Boron Injection Tank Project stage: Other ML20058H3891982-07-30030 July 1982 Application for Amend to License NPF-9,changing Tech Specs to Revise Descriptions of Offsite & Station Organizations So That Operations Superintendent Will Not Be Required to Maintain Senior Reactor Operator License After Appointment Project stage: Request ML20058H4221982-07-30030 July 1982 Proposed Revision to Tech Spec 6.2 Re Offsite & Station Organizations.Discussion of Revision Encl Project stage: Other ML20065C4091982-09-14014 September 1982 Safety Evaluation Supporting Amend 16 to License NPF-9 Project stage: Approval ML20065C4041982-09-14014 September 1982 Amend 16 to License NPF-9,revising Descriptions of Offsite & Station Organizations Project stage: Other ML20065C4221982-09-14014 September 1982 Notice of Issuance & Availability of Amend 16 to License NPF-9 Project stage: Other ML20066B3151982-10-14014 October 1982 Safety Evaluation Supporting Amend 17 to License NPF-9 Project stage: Approval ML20066B3191982-10-14014 October 1982 Notice of Issuance & Availability of Amend 17 to License NPF-9 Project stage: Other ML20066B3101982-10-14014 October 1982 Amend 17 to License NPF-9,permitting Reduction in Boron Concentration in Injection Tank & Revising Limit for Primary Containment Upper Compartment Average Air Temp Project stage: Other 1982-03-09
[Table View] |
Text
{{#Wiki_filter:DUKE POWER COMPANY power llUILDING 422 Sourn Gnuncu SraxEr, Gn.AHt4TTE, N. C. asa.m w w w o. pan.ata.s a.
March 9, 1982 Vier PatsiorNt TELEPesoNc:AntA 704 strane PaoovcVioN b
373-4083 g
C RECStVfD 9
Mr. Harold R. Denton, Director b@
- 2 iM U 51 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission
-{"NSgW Washington, D. C.
20555
/7 Atmention:
Ms. E. G. Adensam, Chief b
Licensing Branch No. 4 (o*
Re: McGuire Nuclear Station Docket No. 50-369 Proposed Amendment to License NPF-9 submitted March 2, 1982
Dear Mr. Denton:
My letter dated March 2, 1982 submitted a proposed Technical Specification change reducing boron concentration in the Boron Injection Tank from a nominal 20,000 ppm to 2000 ppm.
With the unit at power or in hot standby (i.e. modes 1, 2, or 3), current Technical Specifications require a boron concentration of between 20,000 and 22,500 ppm. Thus if McGuire is at power when the change is implemented, the new Technical Specification limits of between 2000 and 4000 ppm boron would not be met, and reduction of the concentration to within limits could not be accomplished within the specified time limit for restoring the tank to operable status (1 hour), necessitating a shutdown within 6 hours.
Since it is anticipated that McGuire will be back on line by the time the change is approved, it is requested that a minimum of 72 hours be granted for implemen-tation of the new concentration limits in order to prevent an unnecessary shut-down.
Verytrulyyours,[
)
Q c).
William O. Parker, Jr.
PBN/jfw cc:
Mr. P. R. Bemis Mr. James P. O'Reilly, Regional Administrator Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 8203160473 820309 j
I PDR ADOCK 05000369 P
PDR IMI k
i Si o}}