Forwards ACRS Re CESSAR Sys 80 Design.Ser Revision 1 for CESSAR Sys 80 Will Be Issued by 820331 & Will Contain ACRS Ltr & Close Out Some Open Items
ML20041D752
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/05/1982
From: Dewey L
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Callahan D, Cole R, Lazo R
Atomic Safety and Licensing Board Panel
References
NUDOCS 8203090110
Download: ML20041D752 (1)


Text

. g--

mm a

23 y

v,

>y

_p n

n~

,c y

+y I: ~ ~G'

. i]

  • Ah

. f hf

~

y y

y g

gi Q' in -

y y# j e

riarch 5,1982 Robert H. Lazo Esq., Chairman Dr. Richard F. Cole Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Comission Washington, D.C.

20555 Washington, D.C.

20555 DISTRIBUTIO_N Dr. Dixon Callahan y O' bewey Administrative Judge g

g G utierrez Union Carbide Corporation v

Reis P.O. Box Y

'2[

. cL)

Lessy Oak Ridge, Tennessee 37830 mf ip' ','

_-9..

Cunningham/fiurray 1962 2 ej ned87Qeg p Christenbury/Scinto 8

j Olmstead in the Matter of

.s FF (2)

Arizona Public Service Company et al.

b f,

NRC Docket File:

(Palo Verde Nuclear Generating Station. UiiTtT1, 2 and T

4 PDR/LPDR Docket Nos. STN 50-528, STN 50-529 and STN 50-530 F.Miraglia 110 MLicitra Dear Administrative Judges P433 Enclosed is a copy of the ACRS letter regarding the CESSAR System 80 design for the Palo Verde nuclear units. By March 31, 1982, the NRC Staff intends to issue Revision 1 to Staff's Safety Evaluation Report for the CESSAR System 80. Revision 1 will contain a copy of this ACRS letter and will also close out certain items left open in the original SER which was sent to the parties in this proceeding on December 4,1981.

Sincerely, Lee Scott Dewey Counsel for NRC Staff

Enclosure:

As Stated cc:

(w/ enclosure)

(

Arthur C. Gehr, Esq.

Charles Bischoff, Esq.

Rand L. Greenfield Ms. Lee Hourihan Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Docketing and Service Section kop i

~:l %w ge t

9203090110 820305 EJReis

-">.w$.82..

go7anocnosooo=

use,onu m ne o, n=cu eno OFFICIAL RECORD COPY s e n+32n24

5 9CR5P/ 95 4 1

a utn UNITED STATES g/

y NUCLEAR REGULATORY COMMISSION

{.

I ADVlsORY COMMITTEE ON REACTOR SAFEGUARDS o

WASHINGTON, D. C. 20665

.Gt 5

/.Q,

%[****y.;

' N)$

December 15, 1981 y

4 5

w M d. %

~o 4.g.( 9 -

Honorable Nunzio J. Palladino Chaiman W

U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

' ACRS REPORT ON FINAL DESIGN APPROVAL FOR CmBUSTION ENGINEERING, INC.

STANDARD NUCLEAR STEAM SUPPLY SYSTEM (STANDARD REFERENCE SYSTEM 80)

Dear Dr. Palladino:

During its 260th meeting, December 10-12, 1981, the Advisory Committee on Reactor Safeguards reviewed the application of Combustion Engineering, Inc.

for final design approval for its Standard Reference System 80 described in CESSAR. A Subcommittee meeting was held with representatives of the Appli-cant and the NRC Staff in Windsor, Connecticut on November 19, 1981. The Committee also had the benefit of the documents listed. The Committee's report on the preliminary design approval for this standard nuclear steam supply system (NSSS) was provided in a letter to the NRC Chaiman dated September 17, 1975.

The System 80 design consists of a reactor system with a design rated core output of 3800 MWt and includes *the reactor coolant system, reactor protec-tion system, engineered safety features actuation system, chemical and vol-ume control system, shutdown cooling system, safety injection system, and fuel handling system. The System 80 design provides safety-related inter-face requirements information essential to the design of the balance of

~

l pl ant. Combustion Engineering provides, at the option of the user, certain other nonstandard safety-related systems and services which are outside the scope of the System 80 design. Such systems will need to be dealt with in i

each user's Safety Analysis Report. The regulations governing the review l

of standard plant designs under the " reference system" option described in the Federal Register (42 FR 34395 and 43 FR 38954) are contained in para-graph 2.110 of 10 CFR Part 2 and Appendix 0 to 10 CFR Part 50.

CESSAR provides information required to ensure that the balance of plant is designed to protect the System 80 from site-related hazarc's. It envelops all plant sites approved to date for Combustion Engineering nuclear steam supply systems. When the System 80 design is applied, the related site must be evaluated to establish its acceptability within the System 80 envelope.

For multiple reactor units at a single site, the reference design requires that each important safety-related item be separately provided for each reactor unit. The first plant using the System 80 design will be Palo Verde Nuclear Generating Station, Units 1., 2,.and 3, of which Unit 1 is scheduled g

to load fuel during November 1982." ~

\\

g2g'16' 811215' R-0954 N

pg

Honorable Nunzio J. Palladino December 15, 1981 4

Because the utility-applicant is responsible for instituting the quality assurance programs necessary to assure that all safety-related requirements have been met, the NRC must review these matters with the utility-applicants on a case-by-case basis. The ACRS believes that Combustion Engineering should be required to evaluate the adequacy of the implementation of inter-face requirements, including such items as the influence of plant control system perfomance and reliability on NSSS integrity and function.

In recent years, the availability of reliable shutdown heat removal capa-bility for a wide range of transients has been recognized to be of great importance to safety. The System 80 design does not include capability for rapid, direct depressurization of the primary system or for any method of i

I heat removal immediately after shutdown which does not require use of the steam generators.

In the present design, the steam generators must be op-erated for heat removal after shutdown when the primary system is at high pressure and temperature. This places extra importance on the reliability l

of the auxiliary feedwater system used in connection with System 80 steam generators and extra requirements on the integrity of the steam generators.

The ACRS believes that special attention should be given to these matters in l

connection with any plant employing the System 80 design. The Committee also believes that it may be useful to give consideration to the potential l

for adding valves of a size to facilitate rapid depressurization of the System 80 primary coolant system to allow more direct methods of decay heat removal. The Committee wishes to review this matter further with the cooperation of Combustion Engineering and the NRC Staff.

System 80 employs some new design features for the steam generators, the core outlet flow region, control rod guidance and shrouding, and the core support structure. These appear to be acceptable, but, because they are new features, they should be monitored during early operation to determine if they perform as expected.

A number of items have been identified as Outstanding Issues and Confirma-tory Issues. These include some TMI-2 Action Plan requirements.

Progress on these matters is satisfactory, and we believe these issues can be re-solved in an acceptable manner. The Committee wishes to be kept infomed.

l The manner of applying preliminary and final design approvals of the type I

proposed for System 80 will not be completely defined until System 80 has been used for several licensing actions at both the construction permit and operating license stages. The Committee believes that standard designs such as System 80 can be useful in assuring acceptably safe plants. However, a policy to establish when and how changes will be permitted to new or pre-viously itcensed plants is needed.

O v

y

-,,-..,-,-.----ry.

4 Honorable Nunzio J. Palladino December 15, 1981 The Committee believes that, subject to the above comments and approval of the balance-of-plant designs, the System 80 design c:n be incorporated into nuclear power plants that can be operated without undue risk to the health and safety of the public.

Sincerehr, J. Carson Mark Chairman

References:

1.

Comoustion Engineering, Inc., " System 80 CESSAR FSAR," with Amendments 1 through 5.

2.

U.S. Nuclear Regulatory Commission, " Safety Evaluation Report Re-lated to the Final Design of the Standard Nuclear Steam Supply Reference System CESSAR System 80," NUREG-0852, dated November 1981.

l l

l t

I e