ML20041C602
| ML20041C602 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 12/29/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20041C600 | List: |
| References | |
| NUDOCS 8203020375 | |
| Download: ML20041C602 (2) | |
See also: IR 05000416/1981057
Text
{{#Wiki_filter:".. s . . E EC 2 9 test % imuummun Mississippi Power and Light Company ATTN: Mr. N. L. Stampley Vice President of <roduction P. O. Box 1640 Jackson, MS 39205 Gentlemen: Subject: Report No. 50-416/81-57 This refers to the routine s 'ety inspection conducted by Mr. A. H. Johnson of this office on November 30 - December 4,1981, of activities authorized by NRC Construction Permit No. CPPR-118 for the Grand Gulf facility. Our preliminary findings were discussed with Mr. G. B. Rogers, Jr. , Site Manager, at the conclu- sion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with , personnel, and observations by the inspector. During the inspection, it was found that certain activities under your license appear to violate NRC requirements. This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A. Elements to be included in your response are delineated in Appendix A. We have examined actions you have taken with regard to previously reported unresolved items. The status of these items is discussed in the enclosed report. One new unresolved item is identified in the enclosed inspection report. This item will be examined during subsequent inspections. In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will be placed in the NRC's Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1). The responses directed by this letter and the enclosures are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of.1980, PL 96-511. 8203020375 820211 PDR ADOCK 05000416 G PDR
.,. . . , Mississippi Power and Light Company 2 Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, S$' R. C. Lewis, Director Division of Resident and Reactor Project Inspection Enclosures: 1. Appendix A, Notice of Violation 2. Inspection Report No. 50-416/81-57 cc w/ encl: D. C. Gibbs, Vice President Middle South Energy, Inc. C. K. McCoy, Plant Manager bcc w/ encl: NRC Resident Inspector Document Management Branch , State of Mississippi
RII RII RII RII /r c O' tN R[II[ RII f,[[ohhson:ht / //u CEMurlhy u h.JA01shinski RButcher RC ewis pe p 12/))/81 12f3/81 12/ff/81 12/t(/81 12/26/81 12 81 }}