Notice of Violation from Insp on 811130-1204
ML20041C604
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/29/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20041C600 List:
References
50-416-81-57, NUDOCS 8203020376
Download: ML20041C604 (1)


Text

,

a 4-I

+

' 4.

e ix _

l

~ "

APPENDIX A c

NOTICE OF VIOLATION Mississippi Power and Light Company Docket No. 50-416 Grand' Gulf 1 License No. CPPR-118 s

As a result of the iriipection conducted on November 30 - December 4,1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),

the following violation was identified.

10 CFR 50, Appendix B, Criterion X and the implementing section of the

~

Operational Quality Assurance Manual, MP&L - Topical-1, paragraph 10.4.2 requires that all. safety-related work authorizations be reviewed by the i

Plant Quality Supervisor for determination of any quality inspection requirements.

Plant Procedure 07-S-01-6, Rev. 2, Conduct of Maintenance Activities, Section 6.2.2(h) states that the Plant Quality Superintendent C

will perform aujuality review of all safety-related Maintenance Work Orders N

(MWO's), sign and cate the MWO, and return to the appropriate Maintenance Planner.

'4 Contrary to thrabc.ve, during the period of May 11 and September 16, 1981,.

safety related work was performed on the HPCS diesel generator system using the non-safety-related MWO-005228, which was issued on April 21, 1981, to primarily' document craft labor in support of the system run-in of system P81-HPCS 0ierel" Generator.

This action bypassed the reviews and controls 4

Established't[clensube quality control checks as specified above.

)

This is a Severity Level V Violation (Supplement II.E).

i t

Pursuant to the provisicus of 10 CFR 2.201, you are hereby required to submit to this office within -thirty days of"the date of this Notice, a written statement or explanation in reply, i ncluding: (1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further_ vi'olat16ns; and (5) the date when full compliance will be achieved. Con'sideratioh ~may be given to extending your response time for good I

cause shown..Under 'the suthority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

\\

s Date: gEC 2 9 1981 4

~