Forwards IE Insp Repts 50-266/81-23 & 50-301/81-23 on 811201-31 & Notice of Violation
ML20041B200
Person / Time
Site: Point Beach  
Issue date: 02/02/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20041B201 List:
References
NUDOCS 8202230379
Download: ML20041B200 (2)


See also: IR 05000266/1981023

Text

F

.

.

'FEB 2

1982

Docket No. 50-266

~

Docket No. 50-301

.s

'b

'Jisconsin Electric Power Company

2

@$

dJ

E/4 J

ATTN:

Mr. Sol Burstein

p

%, g8p /90g

-

g

,3

Executive Vice President

,

g

Q{f

@\\

Power Plants

-

231 West Michigan

n

1% % 4

N'dD

Milwaukee, WI 53201

Mn

This refers to the routine safety inspection conducted by Me

$'.7

W. G. Guldemond and R. L. Hague of this office on December 1-

19& ,

of activities at Point Beach Nuclear Plant, Units 1 and 2, authorized

by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion

of our findings with Mr. G. A. Reed at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with hPC requirements, as described in the enclosed Appendix.

The inspection showed that action had been taken to correct the identified

noncompliance and to prevent recurrence.

Consequently, no reply to this

noncompliance is required and we have no further questions regarding this

matter at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC'- Public Document Room.

If this report contains any information that

you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

9202230379 820202

PDR ADOCK 05000266

C

PDR

f_.Eol,

//

,_ ,

.

. .

- -----

e

.

Wisconsin Electric Power Company

-2-

February 2, 1982

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

~

be accompanied by an affidavit executed by the owner of-the information

which identifies - the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

.the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

%5 _ sgo.-

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report No.

50-266/di-23 and

No. 50-301/81-23

cc w/encls

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief Boiler

Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

,

RII[

RIII

RIII

b

/jp

C.MT q=d

WM

c

KoM c n

Stdeeter

Spessar

1/%1/82

%

2/g

_ _ _ . _ _ _ _