ML20041B200
| ML20041B200 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/02/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20041B201 | List: |
| References | |
| NUDOCS 8202230379 | |
| Download: ML20041B200 (2) | |
See also: IR 05000266/1981023
Text
F
.
.
'FEB 2
1982
Docket No. 50-266
~
Docket No. 50-301
.s
'b
'Jisconsin Electric Power Company
2
@$
dJ
E/4 J
ATTN:
Mr. Sol Burstein
p
%, g8p /90g
-
g
,3
Executive Vice President
,
g
Q{f
@\\
Power Plants
-
231 West Michigan
n
1% % 4
N'dD
Milwaukee, WI 53201
Mn
This refers to the routine safety inspection conducted by Me
$'.7
W. G. Guldemond and R. L. Hague of this office on December 1-
19& ,
of activities at Point Beach Nuclear Plant, Units 1 and 2, authorized
by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion
of our findings with Mr. G. A. Reed at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with hPC requirements, as described in the enclosed Appendix.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence.
Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC'- Public Document Room.
If this report contains any information that
you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
9202230379 820202
PDR ADOCK 05000266
C
f_.Eol,
//
,_ ,
.
. .
- -----
e
.
Wisconsin Electric Power Company
-2-
February 2, 1982
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
~
be accompanied by an affidavit executed by the owner of-the information
which identifies - the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
.the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
%5 _ sgo.-
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report No.
50-266/di-23 and
No. 50-301/81-23
cc w/encls
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief Boiler
Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
,
RII[
RIII
RIII
b
/jp
C.MT q=d
WM
c
KoM c n
Stdeeter
Spessar
1/%1/82
%
2/g
_ _ _ . _ _ _ _