Text
...
. Appendix NOTICE OF-VIOLATION 4
Wisconsin Electric. Power Company Docket No. 50-266 A's a result of'the' inspection conducted on December 1-31, 1981, and in
'accordance.with the' Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:
4 Technical Specification 15.6.8.1 requires, in part,'"The plant.shall be
~
operated and maintained in accordance with approved procedures." Routine Maintenance Procedure RMP #2M, Revision 2, dated January 22, 1981, Step
-2.6, states, "With the plant at full load, record the data indicated on Table A of Appendix A in the column labeled.(BM), before maintenance."
Contrary to the above, on December 4, 1981,-the required data was taken at 0% power rather than at full load.
This is a Severity Level V7. violation (Supplement I).
The inspection showed that action had been taken to correct'the identified..
l item.of noncompliance and.to prevent recurrence. Consequently, no reply to this item of noncompliance is required and we have no further questions-regarding this matter.
fen 2 22 Dated R. L. Spessa d, Director Division of Resident and
[.
Project Inspection l