ML20041A843
| ML20041A843 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/28/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20041A834 | List: |
| References | |
| NUDOCS 8202220581 | |
| Download: ML20041A843 (2) | |
See also: IR 05000424/1981013
Text
Yell,w
-
-
.
DEC 2 81981
Georgia Power Company
ATTN: fir. J. H. Miller, Jr.
Executive Vice President
P. 0. Box 4545
Atlanta, GA 30302
Gentlemen:
Subject:
Report Nos.
b13and50-425/81-13
This refers to the routine safety inspection conducted by ifr. W. F. Sanders of
this office on November 5 - December 11, 1981, of activities authorized by NRC
Construction Permit Nos. CPPR-108 and CPPR-109 for the A. W. Vogtle facility.
Our preliminary findings were discussed with :tr. H. H. Gregory, III, Construction
Project lianager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of ihnagement and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and Reactor
Project Inspection
Enclosures:
(See page 2)
8202220581 820209
PDR ADOCK 05000
Q
% % f s w s;;y+74;=;.p ;;: p ";;z ,,.: p ;. .;_
- . v m p ; _ ;;; 9 ,_;-- ; 4 2 .., , ,
m
. . ~ T! . i
-
- -
-
<
.
$j
,
DEC 2 81981
Georgia Power Company
2
Enclosures:
1.
Appendix A Notice of Violation
2.
Inspection Report Nos. 50-424/81-13
and 50-425/81-13
cc w/encls:
H. H. Gregory, III, Construction
Projectlianager
E. D. Groover, QA Site Supervisor
D. O. Foster, Project General fMnager
,
$
RII:3RPI
RII:RRPI
RII:RRPI
RII: f
O'V
QCb V
g}y
PJ'[
ogg
JFRogge:gr
WFSanders
VLBrownlee
17 49/81
12/g/81
12/PY81
12/g81