ML20041A840
| ML20041A840 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/28/1982 |
| From: | Dutton D GEORGIA POWER CO. |
| To: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20041A834 | List: |
| References | |
| GN-159, NUDOCS 8202220574 | |
| Download: ML20041A840 (1) | |
Text
_ _ _ _ _ - - _ _ _ _ - _ _ _ _
RAM o
ou 9Kellyy CICN
- Georgia Power Company i' C d[/
Post Office Box 4545
+
Atlanta, Georgia 30302 Telephone 404 522 6 32 FE8 3 All. So Vogtle Project Southern Company Services, Inc.
Post Office Box 2625
'l Birmingham, Alabama 35202 Telepnone 205 870-6011 January 28, 1982 l
United States Nuclear Regulatory Commission
Reference:
i Office of Inspection and Enforcement ID:
II:
Region II - Suite 3100 50-424/81-13 101 Marietta Street 50-425/81-13 Atlanta, Georgia 30303 Attention: Mr. Paul J. Kellogg File: X78G10 Log:
GN-159 Gentlemen:
The Georgia Power Company wishes to submit the following information concerning the violation discussed in your inspection reports 50-424/81-13 and 50-425/81-13.
We concur with the finding identified concerning failure to control the preservation of equipment. The reason for the finding was failure to follow procedure GD-T-09, " Inspection of Items in Storage and Storage Areas."
The areas of concern identified in the finding have been corrected. The Vogtle Site Quality Assurance group had previously audited the program for the control and inspection of in place stored equipment and identified two i
findings. These findings have been reaudited and one closed.
Plant Vogtle l
now has an acceptable program for the control and inspection of equipment stored in place.
Quality Assurance will continue to monitor this program.
l Full compliance was achieved January 14, 1982.
Neither the inspection report nor this reply contains any proprietary infonnation and may be placed in the NRC's Public Document Room.
l i
r
- yours, i
\\\\
l Doug Du ton r
Project Executive CWH/D0F/tlp 8202220574 8202C9 PDR ADOCK 05000424 Q
-o Mr. Paul J. Kellogg 50-424/81-13, 50-425/81-13 January 28, 1982 l
Page 2 Doug Dutton states that he is the Project Executive of Georgia Power Company and is authorized to transmit this letter on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
1 0
I
\\
}
N GPC:
A v
Do 'Dutton '
Sworn to and subscribed l
before me this.29# day of l
January, 1982.
MUUeksis.Stateetlarge
- N Expires March 21.1985
/
xc:
U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director l.
Office of Inspection and Enforcement
. ashington, DC 20555 W
J. H. Miller
- 0. Batum R. J. Kelly D. O. Foster l
R. E. Conway H. H. Gregory III l
G. F. Head E. D. Groover D. E. Dutton L. T. Gucwa R. H. Pinson B. L. Lex C. F. Whitmer C. R. Miles, Jr.
l D. L. McCrary H. C. Nix l
R. A. Thomas R. W. Staffa J.
A~. Bailey J. L. Vota i
4 v.
- "u
~MMic%AAAa 1
.. _