Q f/0 V
.
.
,
-
.
23 legg
- F1orida Power Corporation
ATTN: Mr. J. A. Hancock
Assistant Vice President
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
Subject:
Report No. 50-302/81-19
This refers to the routine safety inspection conducted by Mr. T. Stetka of this
office on August 26 - September 22, 1981, of activities authorized by NRC
Operating License No. DPR-72 for the Crystal River facility. Our preliminary
findings were discussed with fir. D. Poole and other members of your staff, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
a'ppear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a stritten application to this office to with-
hold such information.
If your receipt of this letter has been delayed such that
less than seven days are available for your review, please notify this cffice
promptly so that a new due date may be established.
Consistent with section
2.790(b)(1), such application must be accompanied by an affidavit executed by the
8202220524 B20209
PDRADOCK05000g
0
'
.l
.
Fl'orida Power Corporation
2
OCT 2 31981
owner of the information which identifies the document or part thereof sought to
be withheld, and a full statement of the reasons on the basis of which it is
- claimed that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the considera-
tions listed in 10 CFR 2.790(b)(4). The infonnation sought to be withheld shall
be incorporated as far as possible into a separate part-of the affidavit.
If we
do not hear from you in this regard within the specified periods noted above, the
report will'be placed in the Public Document Room.
Should you have any questions concerning this letter. we will .be glad to discuss
them with you.
.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
' Enclosures:
1.
. Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/81-19
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
bcc w/ enc 1:
NRC Resident Inspector
Document Manage..:ent Branch
State of Florida
RI
RII
RII
Y
l
TS tka dt
VBrownlee
PJK4 ogg
10/p81
10/t)/81
10/
/81