ML20041A617

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-438/82-01 & 50-439/82-01 on 820105-08.No Noncompliance Noted
ML20041A617
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 01/26/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Harris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20041A618 List:
References
NUDOCS 8202220343
Download: ML20041A617 (2)


See also: IR 05000438/1982001

Text

n/ W

..

.

J

/ ,~ , m-

/

,,

JAN 261982

/

'

s

(,

>

. :.h

I

j-

t

Tennessee Valley Authority

i-

>-

"

ATTN:

Mr. H. G. Parris

O

.'

'

Manager of Power

s

500A Chestnut Street Tower II

v

~

.x

-

Chattanooga, TN 37401

\\.

8/

D

N

~g/

Gentlemen:

Subject: Report Nos.I

2-01 2nd 50-439/82-01

_

This refers to the routine safety inspection conducted by Mr. J. R. Harris of

this office on January 5-8, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facilit' and to the dis-

cussion of our findings held with Mr. W. R. Dahnke, Project Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previoasly identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Do::ument Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M/

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2

8202220343 820126

PDR ADOCK 05000439

G

PDR

$(Of

.

..

JAN 261982

Tennessee Valley Authority

2

Enclosure:

Inspection Report Nos. 50-438/82-01

and 50-439/82-01

cc w/ encl:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

.

W. R. Dahnke, Project Manager

D. L. Terrill, Project Engineer

r

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

.'

State of Tennessee

-

,

f

!.

.

i

RII

RII

Rh

R1

R'

RIIff

\\

JRHdrr,'i s : htTECon on

OCEMurphy

JA01%inski

JC e.jak

CLewis

1//j/82

1 y/82

14d/82

,11 /82'

1/ 1/42

1/tA 82

2

.