ML20040G903
| ML20040G903 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 01/27/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20040G904 | List: |
| References | |
| NUDOCS 8202160598 | |
| Download: ML20040G903 (2) | |
See also: IR 05000295/1981029
Text
-
.
,
l
'JAN 2 71982
wtItm
Y@QWgUa
Docket No. 50-295
Y
Docket No. 5C-304
.c'./
-
ax
Commonwealth Edison Company
_-l
7
, ,
., y N -/
ATTN:
Mr. Cordell Reed
-
'L
_t' "
Vice President
U
Post Office Box 767
\\.
O
..
'\\
j/
Chicago, IL 60690
Gentlemen:
D
This refers to the routine safety inspection conducted by Messrs.
J. E. Kohler and J. R. Waters of this office on December 1, 1981 through
January 15, 1982, of activities at Zion Nuclear Power Station, Units 1
and 2, authorized by NRC Operating Licenses No. DPR-39 and No. DPR-48
and to the discussion of our findings with Mr. K. Graesser at the con-
clusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the encleesed Appendix.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available fer your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such applicatica must
8202160598 820127
PDR ADOCK 05000295
<
G
3 ~c.,9 /
-
3
l
- - -
-
.
,
,
JAN ~ . 682
.
Commonwealth Edison Company
-2-
,
J02
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear frcm you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly. discuss any questions you have concerning this inspection.
Sincerely,
A [ g/
'
n
4
t%~
- ve ?)
,'l
v
s
R. L. Spessard, Direc or
Division of Resident and
Project Inspection
Enclosure:
Inspection
Report No. 50-295/81-29
and No. 50-304/81-27
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
K. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
!/;
RIII
RIII
RIII
-
Sh
Q
$. \\$
-
Hayes /jp
Knop
Spessard
\\-
1/27/82
_
- _ _ _ _ _ _ _ _ _ _ _ _ . _ _ .