Text

.

Appendix NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-295 50-304 As a result of the inspection conducted on December 1,1981 to January 15, 1982 and in accordance with the Interim Enforcement policy, 45FR6754 ' October 7, 1980),

the following violation was identified:

Technical Specification Section 3.15.2.E and 3.15.2.F describe operation with an inoperable battery and battery charger respectively. Technical Specification Section 3.15.2.H states:

If more than one of the conditions specififed in 3.15.2.A, 3.15.2.B. 3.15.2.C, 3.15.2.D, 3.15.2.E, 3.15.2.F and 3.15.2.G occur concurrently, the reactor of the affected unit shall be brought to the hot shutdown condition immediately Contrary to the above, from 10:20 AM to 6:30 PM December 12, 1981 Unit I was operated with both the 112 battery and 112 battery charger isolated from bus 112 in violation of Technical Specification 3.15.2.H.

This is a Severity level IV violation.

Pursuant to the provisions of 10CFR 2.201 you are required to submit to this office within twenty-five days of the date of this notice a written statement or explanation including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be schieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Dated

(

> 4f dr R. L. Spessard, / Director Division of Resident and Project Inspection 8202160602 820127 PDR ADOCK 05000295 O