r
L
,
-
.y
'
~
,
'JAN 2 21982
2
.
Docket No. 50-461.
?
%
Illinois Power Company
r
ATTN: .Mr. W. C. Gerstner
ti
p"~,M MU '
_.,
9
Executive Vice President
'.
t
50'0' South 27th Street
'g g O I982 6 Z /
-
-
Decatur, IL 62525
6 "k
gaar
f~
Gentlemen:
'b
/f
'
-
%
.
This refers to the routine safety inspection conducted by
Livermore
.
.
,
,
j
of this office on-December 1-31, 1981,.of activities at Clinton Power Station,
j
Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the' discus-
i
sion of our findings with Mr. M.JC. Hollon at the conclusion of the inspection.
The enclosed copy ~of our inspection report identifies areas examined during
the inspection. Within these areas,'the inspection consisted of a. selective
Lexamination of procedures and representative records, observations, and in-
i
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
'
-compliance with NRC requirements,.as specified in the enclosed Appendix.
.
l
A written response,' submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790.of the Commission's regulations,.a copy-of
_
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you'(or-
!
your contractors) believe to be exempt from disclosure under~10 CFR 9.5(a)(4),
it. is necessary that -you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for-
'
- withholding; and (b) submit _within twenty-five (25) days'from the'date of
.
Lthis letter a. written application to this office to withhold such information.
-If your receipt of this letter has been delayed such-that less than seven (7)
days are available for.your review, please notify this' office promptly so that-
- .
a new due date may be established. Consistent with'Section 2.7.90(b)(1), any
.
such application must be accompanied by an affidavit executed by the owner of
i
the information which identifies the document or part sought to be withheld,.
and which. contains' a full statement of the reasons which are the bases for the
-
claim that the information should be withheld from public' disclosure. This
4
. section'further requires the statement to address with specificity the con-
. siderations listed in110 CFR 2.790(b)(4).
The information sought to be
withheld shall be incorporated as far as possible into a separate part of the-
.m
8202090034 820122
.0
'
05000461
PDR.ADOCK
fh l
_
ZE0/
. _
.
- .
Illinois Power Company
- 2-
. affidavit.
If'we do not_ hear from you in this regard within the specified
.
periods noted above, a copy of this letter and the enclosed inspection report
F
will be placed in the Public Document Room.
The responses directed by_this letter (and the accompanying Notice) are not-
'
. subject to the clearance' procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by W. S.-Little for-
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-461/81-32
cc w/encls:
- DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
.
- Mary Jo Murray, Office of
'
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear facility Safety
Randall L. Plant, Prairie
Alliance
.
1
e
i
RIIIgh
RII[
RIII.
9-
+
Walker /so
sKnop-
_ fSpessard
1/21/82
g3/g
- j
,
J
-nna
' ,-
.
~w
-
p.
r
r,-,
~p,
.,m-,
,
-r,
y
-
y--+ - - - --
- - - - - -