IE Insp Rept 50-461/81-32 on 81/201-31.Noncompliance Noted: Shroud Head & Separator Equipment Traveler Did Not Contain Step for Cleaning or Washing Down Steam Separator
ML20040F400
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/22/1982
From: Livermore H, Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20040F280 List:
References
50-461-81-32, NUDOCS 8202090158
Download: ML20040F400 (4)


See also: IR 05000461/1981032

Text

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-461/81-32

Dc ket No. 50-461

License No. CPPR-137

Licensee:

Illinois Power Company

500 South 27th Street

Decatur, IL 62525

Facility Name: Clinton Power Station, Unit 1

-

Inspection At: Clinton Site, Clinton, IL

Inspection Conducted: December 1-31, 1981

h

if

/- 42--6PZ

b

Inspector:l&LH. H. Livermore

'

9

/- 2 3 ~6#2-

Approved B :

R. D. Walker, Acting Chief

,

4 Projects Section IC

Inspection Summary

'

Inspection on December 1-31, 1981 (Report No. 50-461/81-32)

Areas Inspected: Routine, Resident Inspector's inspection of construc-

l

tion activities including material laydown and storage areas, program

control, reactor internals, startup, and electrical cable pull activities.

The inspection involved a total of 42 inspector-hours onsite by one NRC

'

inspector, including seven inspector-hours during offshifts.

Results: Of the areas inspected, one item of noncompliance was

identified.

i

1

~

8202090158 820122

PDR ADOCK 05000461

0

PDR

2

-

-

-c--

-+r,--

g

- - - -

--e--

-

e

o

g-

,

-

-

s

v --

re,-

g

- -

w,~-

.

. . . . _ .

. _ - . . _ - - .

.

. _ _

_.

.

.

.

j-

.

t

DETAILS

1.

Persons Contacted

Principal Licensee Employees

'

W. C. Gerstner, Executive Vice President

  • J. O. McHood, Vice President, Project Manager
  • R. J. Canfield, Director-Construction

A. J. Budnick, Director-QA

  • E.'E. Connon, Director-Compliance
  • L. W. Dozier, Assistant Director-Construction

}

R. W. Folck, Station QA Engineer

  • J. S. Spencer, Director, Design Engineering NSED

J. Geler, Manager-General Engineering

  • W. L. Calhoun, Electrical Construction Supervisor

B. Spicer,lQA Engineer

,

  • M. C. Hollon, Supervisor, Construction QA

.

  • G. N. Motsegood, Engineering

,

i .

. *R. Morgenstern, Station QA Engineer

i

  • D. G. Tucker, Operations Compliance Supervisor

'

  • J.

M. King, Assistant Director, Construction

  • C.-E. Calhoun, Operations QA
  • M. E. D' Haem, Supervisor, Operations QA:

-

  • L. V. Koch, Vice President

'-

M. D. Tindill, Engineer

,' -

  • T. F. Plunkett, Plant Manager

.

  • R. J. Backen, QA Specialist
  • D. Y. Cain, Assistant Power Plant Manager

.

  • L. J. Tucker, Assistant Startup. Supervisor

,

!

  • D. Vincent, Startup Administration Assistant
  • J. Greene, Startup Supervisor

Baldwin Associates

!-

  • J. W.' Smart, QA Manager
  • T. Selva, Manager, Quality and Technical Services

_

.

-

  • W. J. Harrington, Project Manager and Vice President
  • J. E. Findley, Resident Engineer
  • H. R. Swift, Project Engineer

,

  • L. A. Gelbert, QC Manager

G. B. Browne, Manager, Subcontracts

!

B. Curby, Assistant Project Manager

  • G. Chapman, Manager, Technical Services

I

J. C. Wilson, Assistant Manager, QC

,

T. Yearick, Assistant Project Manager

H. J. Harris, Sr., QC Electrical

,

D. R.-Murphy, Sr., Electrical Engineer

,

  • W. L. Atkins, Assistant Project' Engineer

Other staff and personnel were contacted during the reporting period.

,

  • Denotes those attending at least-one of the exit meetings.

4

f

-2-

,

...n

. . - , . , , . -

,, , . , .~

,--. . ,,

,w-.,,

. - -

,.+.e

.- -

-a--

n.

. - ,. ,-.

v,,

- - -- - -

---,n,

--

.

O

.

2.

Functional or-Program Areas Inspected

a.

Site Tours

At periodic intervals during the report period, tours of areas

-

of the site were performed. These tours were intended to assess

the cleanliness of the site; storage conditions of equipment and

material being used in site construction; the potential for fire

or other hazards which might have a deleterious effect on person-

nel and equipment; and to witness construction activities in

progress.

No items of noncompliance or deviation were identified.

.

b.

Electrical Cable Installation

During the reporting period, the inspector randomly observed

the installation, handling, and protection of electrical cables,

specifically, work associated with Class 1E electrical cables

in the Power Block. The cables observed were hand pulled

through tray in the Auxiliary and Control Buildings.

It was

observed that pull cards were in use,-cables were identified,

Quality Control inspections were performed and Quality Control

personnel witnessed the pull. Quality Control coverage of each

event appeared adequate.

No items of noncompliance or deviation were identified.

c.

Program Control

At periodic intervals the inspector reviewed Nonconformance

Reports (NCRs), change implemented Field Change Requests (FCRs),

selected audit findings, construction procedure revisions,

Quality Control procedure revisions, and plant problems identi-

fied by the Licensee and Contractor (BA). The inspector attended

selected weekly schedule meetings and startup/ turnover meetings.

The inspector also provided comments of FSAR Chapter 17'and

Appendix B to Region III for inclusion in the licensing process.

No items of noncompliance or deviation were identified.

l

d.

Startup

An introductory inspection of the Licensee's Startup operation

was performed by Region III on December 7 through 11, 1981. The

Senior Resident Inspector participated in this inspection. All

findings will be included in Report 81-30.

e.

Reactor Internals

On a December 21, 1981, surveillance, the inspector noted that

-

the Steam Separator (Reactor Internal) was in the process of

being washed down with a water hose. The Separator was stored

in the upper Containment Pool 820' level.

Personnel were on

-3-

- -

.

.

.

-

.

_

.

.'

.

top of the Separator hosing down (cleaning) the sides of the

surrounding' pool walls. The sides of the Separator were un-

covered and wet.

Craft personnel stated they also intended to

hose down the Separator. :The inspector noted that the Shroud

-Head and Separator EquipmentLTraveler B13-004 did not contain

'a step or operation for cleaning or washing down the Steam

Separator. Contractor supervision stated they were verbally

instructed by the Licensee to perform.the operation and that

water quality was acceptable. _The inspector notes that there

were no written instructions for cleaning the Separator, nor

were there any written water quality requirements or results

available in the work-area or included-in the Traveler Package.

The inspector notes that when notified, the Contractor QC took.

the appropriate Stop-Work action. The inspector performed a

follow-up surveillance on January 4, 1982, and notes that an

Inspection Report (M-82-240), a Corrective' Action Request (076),

and a Nonconformance-(NCR 6073) had been initiated.

This item is considered to be in noncompliance with the require-

ments of Criterion V of 10 CFR 50, Appendix B, (50-461/81-32-01).

3.

Items of Special Interest

NRC Commissioner, T. M. Roberts, aide, G. Zech, Region III

Administrator, J. Keppler, and Project Chief, R. Knop, visited

the Clinton site on December 1,1981. An extensive site tour

was provided by the Senior Resident Inspector and information

meetings were held with the Contractor and Licensee management.

4.

Exit Meetings

The Resident Inspet tor attended exit meetings conducted by Region III

inspectors:

F. Christianson,-P. Gwynn, M. Ring, and R. Lanksbury on

December 4 and 11, 1981. The Resident Inspector met with licensee

representatives (denoted under Persons Contacted) on December 4 and

11, 1981. The inspector summarized the scope and findings of the

inspections performed.

-4-