Forwards IE Insp Repts 50-424/81-12 & 50-425/81-12 on 811117-19 & Notice of Violation
ML20040E737
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/17/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20040E730 List:
References
NUDOCS 8202050299
Download: ML20040E737 (2)


See also: IR 05000424/1981012

Text

-g

- .-

,

..

> *

',. ,

. . ,

k [laJ W

3

DEC 171981

-

Georgia Power Company

'

ATTN:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

Subject: Report Nosh 24/81 12)and 50-425/81-12

This refers to the routine audit conducted by Mr. R. W. Wright and others of

this office on November 17-19, 1981, of the quality assurance program for design,

procurement, and construction of the Vogtle facility as authorized by NRC Con-

struction Permit Nos. CPPR-108 and CPPR-109.

Our preliminary findings were

discussed with Mr. R. W. Staffa, Manager of Quality Assurance, at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to . violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

,

Appendix A.

'

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

.

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

~

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

.

them with you,

,

i

l

Sincerely,

i

i

/4'a[

Paul J. Kellogg, Chief

Reactor Projects Branch 2

.

Division of Resident and

l

Reactor Project Inspection

!

Enclosures:

See Page 2

C202050299 820201

PDR ADOCK 05000424

'

G

PDR

_ _ _ _

.

_ _ _

,

_

_

~

_ _-

.

-

',

.

Georgia Power Company

2

DEC 171981

i

Enclosures

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-424/81- 12

l

and 50-425/81-12

cc w/ encl:

H. H. Gregory, III, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

bcc w/ encl:

Document Management Branch

State of Georgia

u; M)

h

g

'

RWright:ht

CMUpright

~ CEMurphy

JRogge

[P

e

gg

44P /81

/81

1Y/tb/81

12/jf/81

1N/6/81

va/Iu

(" (d