ML20040E737
| ML20040E737 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/17/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20040E730 | List: |
| References | |
| NUDOCS 8202050299 | |
| Download: ML20040E737 (2) | |
See also: IR 05000424/1981012
Text
-g
- .-
,
..
> *
',. ,
. . ,
k [laJ W
3
DEC 171981
-
Georgia Power Company
'
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
Subject: Report Nosh 24/81 12)and 50-425/81-12
This refers to the routine audit conducted by Mr. R. W. Wright and others of
this office on November 17-19, 1981, of the quality assurance program for design,
procurement, and construction of the Vogtle facility as authorized by NRC Con-
struction Permit Nos. CPPR-108 and CPPR-109.
Our preliminary findings were
discussed with Mr. R. W. Staffa, Manager of Quality Assurance, at the conclu-
sion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to . violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
,
Appendix A.
'
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
.
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
~
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
.
them with you,
,
i
l
Sincerely,
i
i
/4'a[
Paul J. Kellogg, Chief
Reactor Projects Branch 2
.
Division of Resident and
l
Reactor Project Inspection
!
Enclosures:
See Page 2
C202050299 820201
PDR ADOCK 05000424
'
G
_ _ _ _
.
_ _ _
,
_
_
~
_ _-
.
-
',
.
Georgia Power Company
2
DEC 171981
i
Enclosures
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-424/81- 12
l
and 50-425/81-12
cc w/ encl:
H. H. Gregory, III, Construction
Project Manager
E. D. Groover, QA Site Supervisor
D. O. Foster, Project General Manager
bcc w/ encl:
Document Management Branch
State of Georgia
u; M)
h
g
'
RWright:ht
CMUpright
~ CEMurphy
JRogge
[P
e
gg
44P /81
/81
1Y/tb/81
12/jf/81
1N/6/81
va/Iu
(" (d