ML20040E608

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/81-28 & 50-414/81-28 on 811126-1225.No Noncompliance Noted
ML20040E608
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/19/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20040E609 List:
References
NUDOCS 8202050169
Download: ML20040E608 (2)


See also: IR 05000413/1981028

Text

.

.

JAN 1 9 1992

m & U o,[ g

C

Duke Power Company

/s ' '

ATTft: fir. W. O. Parker, Jr.

j.

,'

-

,

Vice President, Steam Production

'

.

P. O. Box 21.78

l' -

O

.,

/,"

Z

Charlotte, llc 28242

3Y

$',

Gentlenen:

s

+N

/s'

_

x

-

Subject:

Report lios.

1-2 and 50-414/81-28

'Y

This refers to the routine safety inspection conducted by !!r. P. K. VanDoorn of

this office on flovember 26 - December 25, 1981, of activities authorized by flRC

Construction Permit flos. CPPR-116 and CPPR-117 for the Catawba facility and to

the discussion of our findings held with fir. T. H. Robertson, Construction

Engineer, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

inspection report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report.

These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the flRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirenents

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

b? W

Paul J. Kellogg

Reactor Projects Branch 2, Division

of Resident and Reactor Project

Inspection

Enclosures (See page 2)

8202050169 820119

PDR ADOCK 05000413

0

PDR

gg

.

Duke Power Company

2

JAN 1 9 pg?

Enclosures:

Inspection Report flos. 50-413-81-28

and 50-414/81-28

cc w/encis:

J. W. llampton, Station !!anager

J. C. Rogers, Project flanager

T. H. Robertson, Construction Engineer

bcc w/encls:

flRC Resident Inspector

Document !!anagement Branch

State of South Carolina

RII:RRPI

RII:RRPI

RII:RRPI

RII:RRPI

'

f

60 c .kt

(; c /

m

PKVanDoor'n :gr

Algn tonis

@ ant

Yb

1//F/82

1/// /82

1//<//82

1//'[/82