ML20040D433

From kanterella
Jump to navigation Jump to search
Amend 1 to CPPR-106 & CPPR-107,ordering Applicant to Take Measures Necessary to Assure Availability of Compensating Water Storage Capacity at Earliest Practicable Time
ML20040D433
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/10/1975
From: Deyoung R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20040D425 List:
References
CPPR-107-A1, NUDOCS 8202010292
Download: ML20040D433 (2)


Text

  • tJNfTE] STATES NUCLEAR REEULATORY COMMISSION ~

WASHINCTC N, D. C. 20555

(*

PHILADELPHIA ELECTRIC COMPANY

~

LIMERICK CENERATING STATION. UNIT 1 DOCKET NO. 50-352 AMENDMENT TO CONSTRUCTION PERMIT Construction Permit No. CPPR-106 Ainendment No. 'l e

s Pursuant to 'a Decision by the Atomic Safety and Licensing Appeal.

Board dated March 19, 1975, the Nuclear Regulatory Commissica has issued Amendment No. 1 to Construction Permit No. CPPR-106 by revising paragraph 3.E(8) in'its entirety to read as follows:

"The applicant will take those measures necessary'to assure the availability of co=pensating water storage capacity at the earliest practicable time if such is permitted by the Delaware River Basin Com:nission -

pursuant to DRBC Docket No. D-69-210CP.. A schedule identifying significant milestone dates to achieve this objective, assuming Tocks Island project is not available, shall be developed in coordination with the Delaware River Basin Co==ission and submitted to the Division of Reactor Licensing within six months after the issuance of a construction permit for the station."

This Amendment is effective as of its issuance date.

FORTHENUCLEARREGULATORYCOMMISSIOh b

/

wsD R. C. DeYo

, Ass tant Director l

for Ligh'~t Water Reactors Group 1 Division of Reactor Licensing Date of Issuance: Apg 1 C 1W5 l

l 4 @O4 0

b k

o E

r og" f

    1. / 198 6

i 8202010292 820128 PDR ADOCK 05000 G

t

1 UNITE] STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 PHILADELPHIA ELECTRIC COMPANY LIMERICK CENEI!ATING STATION, UNIT 2 DOCKET NO. 50-353 AMENDMENT TO CONSTRUCTION PERMIT.

Construction Permit No. CPPR-107 Amendment No. 1 s

Pursuant to a Decision by the Atomic Safety and Licensing Appeal Board dated March 19, 1975, the Nuclear Regulatory Comission has issued

. Amendment No. 1 to Construction Permit No. CPPR-107 by revising paragraph. 3.E(8) in its entirety to' read as follows:

"The applicant will take those measures necessary to assure the availability of compensating water storage capacity at the earliest practicable time if such is

[

permitted by the Delaware River Basin Comission pursuant to DRBC Docket No. D-69-210CP. A schedule identifying significant milestone dates to achieve this objective, assuming Tocks Island project is not available, shall be developed in coordination with the Delaware River Basin Commission and submitted to

{

the Divi'sion of Reas: tor Licensing within six conths after the issuance of a construction permit for the station."

This Amendment is effective as of its issuance date.

FOR THE NUCLEAR REGULATORY COMMISSION e r R. C. DeYo og, Asst tant Director for Ligh't Water Reactors Group 1 Division of Reactor Licensing D:tc of Issuance: APR 1 6 *S75 E

{AlfTION4 t, k sg/

%.,#