UNITED STATES A1GHC ENERGY CQ4HSSIN DOCKET NOS. 50-352 6 50-353 1
PHIIADELPHIA. ELECTRIC CO@AW hUTICE OF AVAILABILITY OF INITIAL DECISION OF THE A10HC SAFE 1Y AND LICENSING BOARD FOR THE LI!!ERICK GENEFJTING STATION, UNITS 16 2 AND ISSUANCE OF CONSTRUCTION PEMUTS Pursuant to the National Environmental Policy Act of 1969 and'the i
United States Atcznic Energy Comission s regulations in 10 CFR Part 50, Appendix D, Section A.9 and A.11, notice is hereby given that an Initial Decision dated June 14, 1974, by the Atomie Safety and Li:snsing Board in the above captioned proceeding authorizing issuance of construction permits to the Philadelphia Electric Company for construction of the Limerick C=::: ting Stati=, Unit: 1 E 2 le=ted en the Schr/1 hill niver, necr Pottstown in Limerick Tomship,.\\bntgomery County, Pennsylvania, is available for inspection by the public in the Co=nission's Public Document Room at 1717 H Strdet, N., W. Washington, D. C. and in the Fottstcun Public f.
Library, 500 High Street, Pottstown, Pennsylvania 19464.
1he Initial Decision is subject to review by an Atomic Safety and Licensing Appeal Board prior to its becoming final. Any decision or action l
taken by an Atomic Safety and Licensing Appeal Board in connection with the
~
i Initial Decision may also be reviewed by the Comission.
The Initial Decision is also being made available at the Office of Radiological Health, Department of Environmental Resources 5th Floor, Fulton Building, 3rd and Locust Street, Harrisburg, Pennsylvania 17120 and at the Delaware Valley Regional Planning Comnission,1317 Filbert Street, Philadelphia, Pennsylvania 19107.
0$n ojf00332 012e PDR
~
~
(.
Based upon the record developed in the public hearirg in the above captioned matter, the Initial Decision nodi.fied in certain respects 'the contents of the Final Envimm.utal Statment relating to the construction of the Linerick Generating Station, Units 1 & 2, prepared by the Ocmission's Directorate of' Licensing. Pursuant: to the provis' ions of 10 CFR Part 50, Appendix D, Section A.ll, the Final Envirorsnental Statement is deerned I
nodified to the extent that the findings an'd conclusions relating to envircrrnental natters contained in the Initial Decision are different frm those contained in the Final Environmental Statement, dated Novenber 1973.
As required by Section A.11 of Appendix D, c copy of the Initial Decision, which nodifies the Final Environmental Statenent, has been transmitted to the Council on Enviromental Quality and made available to the public as
'(
~
noted herein.
s I
Pursuant to the above nentioned Initial Decision, the Atomic Energy Comission (the Comission) has issued Construction Pemits Nos. CPPR-106 &
CPPR-107 to the Philadelphia Electric Otmpany for construction of two boiling water nuclear reactors, kncun as the Limarick Generating Sta' tion, Units 1 & 2, each designed for a rated power of approxinately 3293 megawatts thermal with a net electric output of approximately 1055 megawatts.
'lhe Comission has made appropriate findings as required by the Atmic Energy Act of 1954, as amended (the Act), and the ammission's rules and regulations in 10 CFR Chapter I, which are set forth in the construction permits. 'Ihe application for the construction pemits ocruplies with the standards and requirements of the Act and the Cmmission's rules and regulstions.
-r
3.
(
'Ihe construction permits are effective ~as of their date of issuance. The earliest date for the empletion of Unit 1 is April 1, 1979, and the latest date for empletion is October 1,1979. The earliest date for the ccupletion of Unit 2 is Sep62+r 1,1980 and the latest date for caipletion is March 1,1981. Each pemit shall er.pire on the latest date for empletion of the facility.
In addition to the Initial Decision, copies of (1) Construction' Pemits Nos. CPPR-106 & CPPR-107; (2) the report of the Advisory Ccmnittee on Reactor Safeguards, dated Septenber 21, 1972; (3) tbn Directorate of Licensing's Safety Evaluation, dated November 29, 1971; (4) Errata to Safety Evaluation, dated January 1972 and April 24, 1972; (5) the Preliminary Safety Analy=1e up ynd ggs._,d, th:: te; (g) the applicant's Enviromental Report, dated October 1970, revised May 1972 and supplanents thereto; (7) the Draft Envircernental Statement, dated August 1973; and (8) the Final Envir@ ental St'atenent, dated Novenber 1973, are also available for public inspection at the above-designated locations and in Washington, D.C. and in the Pottstown Public Library, 500 High Street, Pottstaan, Pennsylvania 19464. Single copies of,the Initial Decision by the Atcmic Safety ard Licensing Board, the construction permits,
' the Final Enviromental Statenent, and the Safety Evaluation and Errata may be obtained upo. request addressed to the U. S. Atmic Energy Catmission 7
O S
e O
r
-4.
Washington, D.C. 20545, Attention:, Deputy Director for Reactor Projects, Directorate of Licensing, Regulation.
q Dated at Bethesda, Maryland, this /([ day of
,.e,
/ 7 77,,
~
~ EUR 'INE A'IQ4IC CCMGSSICH 8
4 Walter R. Butler, Chief-Light' Water Reactors Project Branch ?.-2 Directorate of Licensing O