DUKE POWER COMPANY OCONEE NUCLEAR STATION P.o.soxsese SENECA.S.C.29678 seasses December 28, 1981 INTRASTATION LETTER OCONEE LEAR STATIO
/ ",k I/
'l /
CONTROL COPY NO.
[
TO:
/
SUBJECT:
Oconee Nuclear Station Emergency ulementing Procedures Manual Procedurc;, - c'P/1/A/2002/4A, CP/2/A/2002/4A, CP/3/A/2002/4A and CP/1/A/2002/4B, CP/2/A/2002/4B, & CP/3/A/2002/4B.
Revision No. 81-5 Please find attached for your copy of the Oconee Nuclear Station Implementing Procedures Manual, new procedures CP/1/A/2002/4A, CP/2/A/2002/4A, and CP/3/A/2002/4A,
" Post Accident Liquid Sampling of the Reactor Coolant System"; and CP/1/A/2002/4B, Cp/2/A/2002/4B, and CP/3/A/2002/4B, " Post Accident Liquid Sampling of the Low Pres-sure Injection System".
Also attached are the Table of Contents and a revised dis-tribution list.
E_EMOVE IMEBI 1.
Distribution List from behind tab 1.
Distribution List behind tab INTRO-INTRODUCTION DUCTION 2.
Pages 1 & 2 of Tible of Contents 2.
Pages 1 & 2 of Table of Contents 3.
3.
Tab for CP/1/A/2002/4A and Procedure behind Procedure CP/0/B/2000/04 4.
4.
Tab for CP/2/A/2002/4A and Procedure 5.
5.
Tab for CP/3/A/2002/4A and Procedure 6.
6.
Tab for CP/1/A/2002/4B and Procedure 7.
7.
Tab for CP/2/A/2002/4B and Procedure 8.
8.
Tab for CP/3/A/2002/4B and Procedure Please read and familiarize yourself with these procedures and return the acknow-ledgement printed below to W. M. Rocch by January 6, 1981.
i M hn T. McIntosh
(
Superintendent of Administration
/1ss Attachment OCONEE NUCLEAR STATION Emergency Implementing Procedures Manual - Procedures CP/1/A/2002/4A, CP/2/A/2002/4A Revision No. 81-3 CP/3/A/2002/4A and CP/1/A/2002/4B, CP/2/A -
2002/4B, and CP/3/A/2002/4B (All dated 12/1/81).
CONTROL COPY NO._ __
8201300326 820119 PDR ADOCK 05000269 F
PDR MmWRE LOCATION DATE
~,
DISTRIBUTION OF THE OCOMEE HUCLEAR STATION EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Emergency Plan Volume A
=
~
Volume B Implementing Procedures
=
STATION VOLUME NUMBER ISSUED To lA, 1B Station Manager 2A Superintendent of Operations 3A Superintendent of Administration 4A Superintendent of Maintenance SA Superintendent. of Technical Services 6A Assistant Station Manager 7A
' Contract Services Cordinator 8A Training and Safety Coordinator 9A Administrative Coordinator 10A, 10B Emergency Preparedness Coordinator 12A Unit 1 & 2 Operating Engineers' Office 13A Unit 3 Operating Engineers' Office
)
14 Open 15 Open 16A, 16B Units 1 & 2 Control Room 17A, 17B Unit 3 Control Room 18A, 18B Shif t Supervisor _-- Technical Support Center 19A 1 & E Engineer 20A Planning and Materials Engineer 21A Mechanical Maintenance Engineer 22A Performance Engineer 23A Licensing and Projects Engineer I
24A Station Health Physicist i'
25A Station Chemist i
26A Station Biologists 27A Southern Security 28A Keowee-Toxaway Visitor's Center 29A, 29B NRC Resident Inspector i
I
\\w i
. ~....-
j l
(Distribution of Oconee Nuclear Station Emergency Plan and Implementing Procedures) 30A Station QA j
31A, 31B Master File i
'32A K-Mac 33A, 33B Oconee Training Center i
GENERAL OFFICE / DUKE 34A, 34B H. B. Tucker 35A, 35B R. M. Clover 1
-36A, 36B Lionel Lewis 37A McGuire Nuclear Station s
38A Catawba Nuclear Station llA, llB QA OTHER TIIAN DUKE 39A, 39B S. C. Emergency Preparedness Division 40A Bureau of Radiological Health, DHEC I
41A, 41B Oconee County Emergency Preparedness Agency 42A, 42B Pickens County Civil Defense f
43A, 43B INPO 44A, 44B thru NRC Region - Atlanta, Georgia - 3 copies 46A, 463 4
47A, 47B thru NRC NRR, Bethesda, Maryland - 10 copies j
56A, 56B 57A Babcock & Wilcox i
Revision 2 December, 1981 j
i
}.t, s
-...... ~ -... -. -.. _. -,... _ - _.
.