ML16162A308

From kanterella
Jump to navigation Jump to search
Releases Public Version of Revised Emergency Plan Implementing Procedures
ML16162A308
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/19/1982
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML16162A309 List:
References
NUDOCS 8201300313
Download: ML16162A308 (3)


Text

o 0UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 19, 1982

.50-269/270/287 Oconee MEMORANDUM FOR:

Chief, Document Management Branch, TIDC FROM:

Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicl available.

M. Felton, Director Division of Rules and Records Office of Administration

Attachment:

As stated 8201300313 820119 PDR ADOCK 05000269 F

PDR

DUKE POWER COMPANY POWER BUITDING 422 SOUTH CHURCH STREET, CHARLOTTE, N. C. 28242 WILLIAM 0. PARKER.JR.

V1CE PRESIDENT TELEPHONE: AREA 704 STEAM PRODUCTION January 5, 1982 373-4083 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. J. F. Stolz, Chief Operating Reactors Branch No. 4 Re:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

By letter dated March 2, 1981, copies of the Oconee-Nuclear Station Emergency Plan Implementing Procedures were submitted. Please find attached ten copies of the below listed procedures which should be placed in the Emergency Plan Implementing Procedures. By copy of this letter, three copies of these implementing procedures are provided to NRC, Region II.

Pursuant to Mr. D. G. Eisenhut's Generic Letter No. 81-27 dated July 9, 1981, the attached material is deemed confidential.

Revised Procedures CP/l/A/2002/4A Post Accident Liquid Sampling of the Reactor Coolant System CP/2/A/2002/4A Post Accident Liquid Sampling of the Reactor Coolant System CP/3/A/2002/4A Post Accident Liquid Sampling of the Reactor Coolant System CP/l/A/2002/4B Post Accident Liquid Sampling of the Low Pressure Injection System CP/2/A/2002/4B Post Accident Liquid Sampling of the Low Pressure Injection System CP/3/A/2002/4B Post Accident Liquid Sampling of the Low Pressure Injection System Very, truly yours William 0. Parker, Jr.

JLJ/php Attachments cc: Mr. James P. O'Reilly ZEj3 M~dM-rp

r ~sJ uR io' oiA IN YTE 3

( 1/)5' FIZ FACIL.: :i-2b9 JZ:One9 4,j-.ear Static I ), Jrnit 1p Duke aooqer Coo 237 Jzonee 4,,j Iea:r 3tati On, r, i t 3,

)uke 9o..e r Co,0 PAR(ER,4.0.

Ouk3,7:)4r Zoo DET~ R if f i - f fuear Reactor Regu ati on,

)i recto~r SrOLZ,J.F.

3Doerqtiig Reactors 3rarnch '

SJ 6J ECT :

ForwariS

-antral Ftiles version of revisad e.nertency o a n i rol,.,

t i igi oro -,aJu re s i nc I jin

?ro c e d jres C P/

//2 002'4 A re O:).st-a-C:1Sint samo-ngjr of RCS. rncl orocedures contain ori va.-yi ito er

ieri c Lt r 31-27, DISFR13JTIJ*

.JOE: X005S

.JPIES3 RECEIVE0:I.tJ

-A "CLL Q S I z~

T I TLE : E Ter. ;)A an

(,Fw Avai I1)

AiJi0/Jrlst~ei 1:: 1 -c-050002?

A'CJ/r.,srei ~,:1:

0 DUd' I-C)E E.ir rR E'ACL I) C J bE N AAE:

L IIr R~C A Z. T I ON R3 443 C1 0

N 01 N E,

I I

T E R A I I /ZQR 02, 1

1 FEAA-REP

)14 09 1

1 03 2

1 IE/DEP 01I1 1 E EE P):3 0 b 1

I IE/0EP/EP.3; U3 3

3 R 13431.

0 R E F 1L E.

07 1

TZ)rALt AJUA13E.R j:' 'J24--

-- JIRD:

LJ I

~

E~CL