ML20040C432
| ML20040C432 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 11/12/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20040C421 | List: |
| References | |
| NUDOCS 8201270636 | |
| Download: ML20040C432 (2) | |
See also: IR 05000370/1981016
Text
{{#Wiki_filter:.' . . . i llrw (Q. ._ ' . NOV 12 1981 Duke Power Company ATTN: Mr. W. O. Parker, Jr. Vice President, Steam Production P. O. Box 2178 Charlotte, NC 28242 Gentlemen: Subject: Report No. 50-370/81-16 This refers . to the routine safety inspection conducted by Mr. T. D. Gibbons of this office on September 15-18, 1981, of activities authorized by NRC Construction Permit No. CPPR-84 for the McGuire facility. Our oreliminary findings were discussed with Mr. J. T. Moore, Project Manager, at the conclusion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. During the inspection, it was found that certain activities under your license appear to violate NRC requirements. This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appen- Jix A. Elerrents to be included in your response are delineated in Appendix A. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room. If the report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this l of fice by telephone within ten days from the date of this letter of your inten- ' tion to file a request for withholding; and (b) submit within twenty-f've days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven days are available for your review, please notify this office promptly i so that a new due date may be established. Consistent with section 2.790(b)(1), such applic.ation must be accompanied by an affidavit executed by the owner of the information which identifies the document or part thereof sought to be withheld, and a full statement of the reasons on the basis of which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above. the report will be placed in the Public Document Room. l l 0201270636 811229 PDR ADOCK 05000370 Q PDR
_ _ _ _ _ _ - _ - _ _ _ . ' '. .. . , fN I 2 198; Duke Power Company 2 Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, b/ Paul J. Kellogg, Chief Reactor Projects Branch 2 Division of Resident and Reactor Project Inspection Enclosures: 1. Appendix A, Notice of Violat'on 2. Inspection Report No. 50-370/81-16 ' cc w, encl: M. D. McIntosh, Plant Manager J. T. Moore, Project Manager bcc w/ encl: NRC Resident Inspector Document Management Branch , l State of North Carolina /\\ RIl RII RII k RII RII RII r TDGip ns:aw EConlon CEMurphy J06 'inski Brya [[ 10//> 81 10jg /81 1//j /81 10' 41 14/c4/81 2 % g/lc/81 \\ - - - - - - - - }}