ML20040C198
| ML20040C198 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/01/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20040C193 | List:
|
| References | |
| NUDOCS 8201270387 | |
| Download: ML20040C198 (2) | |
See also: IR 05000324/1981023
Text
.
'
-
ObkN
.
OCT 1 - 1981
Carolina Power and Light Company
AfTN: Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
_
Subject: Report Nos. 50-324/81-
nd 50-325/81-23
s'
This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr.,
of this office on September 14-18, 1981, of activities authorized by NRC License
Nos. DPR-71 and DPR-62 for the Brunswick facility. Our preliminary findings were
discussed with Mr. C. R. Dietz, Plant Manager, at the conclusion of the inspec-
tion.
Areas examined during this inspection included fire protection / prevention.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and observa-
tions by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NFC's Public Documer.t Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this latter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an af fidavit executed by the owner of the
.
82C1270387 820105
'
PDR ADOCK 05000324
g
-
_
f
o
Carolina Power and Light Company
2
OCT 1 - 1981
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you hava any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos.
50-324/81-23 and 50-325/81-23
cc w/ encl:
C. R. Dietz, Plant Manager
bcc w/ encl:
NRC Resident Inspector
G. R. Jenkins, RII
Document Management Branch
State of North Carolina
l
RIl
R
-
RII
RII
RII
II/
-
Willer:aw
TConlon
CEkurpy
AFGibson
uMan
ewis
09fi/81
09
/81
09/2%/81
09p/81
N// /81
,~
l0 1 g(
<
_