ML20040B906

From kanterella
Jump to navigation Jump to search
Responds to FOIA Request for Biweekly Status Repts Provided to H Denton Re TMI-1 Restart & All Requests for Exemptions from Requirements of 10CFR50,App E.Forwards Documents Listed in App
ML20040B906
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/07/1981
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sholly S
UNION OF CONCERNED SCIENTISTS
Shared Package
ML19240A644 List:
References
FOIA-81-359 NUDOCS 8201260569
Download: ML20040B906 (2)


Text

PDt-o)6 pn kna (o,

UNITED STATES g,

p

- y,( (,g NUCLEAR REGULATORY COMMISSION g,

,/

g WASHINGTON, D. C. 20555 k,,

(o8 October 7, 1981 Mr. Steven Sholly Union of Concerned Scientists 1725 I Street, N.W., Suite 601 IN RESPONSE REFER Washington, DC 20006 TO F01A-81-359

Dear Mr. Shaliy:

This is in response to your letter dated September 2,1981 in which you requested, pursuant to the Freedom of Information Act, copies of the bi-weekly status reports provided to Harold Dentor, regarding TMI-l restart and all requests for exemptions from requirements of 10 CFR Part 50, Appendix E.

The documents listed on the appendix are enclosed.

This office has been advised that the plan for biweekly reports was not maintained.

This completes action on your request.

S)dcerely,

.h J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 1

faflID's k_

O C T 1 3 5 8 4 :'ID

'( % g y ma

// '

8201260569 811007 PDR FOIA SHOLLY81-359 PDR

s Re:

F01A-81-359 APPENDIX 1.

September 11, 1980 Memo to Denton and Shepar from Eisenhut, "TMI-l Restart Status Report'.'.

2.

October 30, 1980 Memo to Denton from Eisenhut on "TMI-l Restart Report".

3.

March 31,1981 Memo to Eisenhut from Novak on " TIM-1 Restart Open Items Status Related to Completion of Hearing".

4.

April 29,1981 Memo to Eisenhut from Silver on " Status of TMI-l Restart Hearing".

5.

July 14, 1981 Memo to Roe from Stolz on "TMI-l Restart Status".

-l 1

i i

m

a 4

/jt* E8Cg0, UNITED STATES

[

k NUCLE AII REGULAYORY COMMtsslON y,

$O@ Mary //

J W ASHIN GTON, D. C.

20$55 I

August 12, 1980 MEMORANDUM FOR:

R. Mattson, Director Division of Safety Technology D. Ross, Director Division of Systems Integration S. Hanauer, Director Division of Human Factors Safety D. Eisenhut, Director Division of Licensing R. Vollmer, Director j

Division of Engineering B. Grimes, Program Director Emergency Preparedness Program Office FROM:

H. R. Denton, Director Office of Nucidar iteactor Regulation

SUBJECT:

7't-1 RESTART g 3ff As you know, the TMI-l restart review ef fort is a large, complex task on a very tight schedule. This memorandum reaffinns my oral guidance that this program is of equal priority to the near-term OL reviews.

The general TMI-l restart sche'dule showing the major items remaining is m

i attached.

DL will issue a more detailed schedule shortly. DL has the overall responsibility for developing and meeting these schedules. However, each Division Director is responsible for meeting the schedule requirements in his Division.

, identifies the personnel presently assigned to preparation of testimony and resolution of SER open items.

It is important that these assignments remain stable, particularly for the testimony preparation.

No changes in these assignments should be made without the direct approval of the appropriate Division Director.

.. 4 4 u ' q o M P D

.-.4-J NRR Division Directors August 12, 1980 NRR Program Director DL is to provide me with a bi-weekly status report describing progress and identifying potential problem areas.

l(A Harold R. Denton, Director I-Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ encl:

H. K. Shapar, OELD W. J. Dircks, NMSS V. Stello, Ol&E 9

J l

S

=

=

__=__=--___=p_--

-. =

- - -... =.

._l_=

. =

a

=

.2._ -

_ _.. l _ = =

_ =

-. L. }

RESTART-GENI:RAL 5 llEDULF l.__

~_

m __m N

-m

.m N

N m

-w, _-

m m

m m

e m

m N

--- j -

y

_m, e

.s s

s s

s s

s si s

s o

o

_s.__

. _.._ 1..

_ _. ~

_i

.b

. S l.. _

N

^

  • ~

._.. l

! _l l

_ l _} _. -

Open I_tems Licensee,Respoisse SS'ER Inputs i1

. Issd'e SSER.

l

.l.

i i

l I

}

- _.i_.__. l _.

_ _ l _.a _

D5.1, DHIS, DE DL l

=_

.. _... l I _l 1

1 l.i 1

p _}

Management Is. sue Revised Innu ts SSER Inputs

_ from Licensee

Dill S,

I E

!. !.. i._

_j _ _

.L__j__]

'_L____.

.__.i_. [ ___1_

.g.

g l

,;_...}

_.l _ f__;

' J _

_1__._

ligt SSER Inputs

_ l

.I j

l.;

Insp.

DilFS, IE i

j i

l i

l i

l

.i..._.

_L QA I nsp.

SSER Inpu L DE. IE

. l

_l l

I

.. i.

l _.

I

__... J.

[_

__ j __

._ f.,_

PAT Insp.

SSER inputs

.i.

j l'

l IE, DllfS i

i

ii

..I IP SSERJnphts

.i

ins ).

IE, DSI i

._ _l

,.l

_._1 l

j Additions 1 Ite'ns Me no 1ssuei

.Li;enhee Re,sponse l

SER ln'pu.ts l

l Conne1ts

. _,i. _

_. i i

1 l

_._ l.. !. l..

. ~_ l t

ACRS

.... _l_.

_.l Surnmi tt o = Ir in en =1 %

1U8k I_

l Te stiTuny ( lot in:'1.mgt.~~

DI, DS, DilFS "0 ELD ; ALL

[0Ei.D ALE U.LD T

Is t d,ra f ts _Ref e42 1d.Jra fts Reele < FjnaJ RJvi ?w ileart ng Begins i

i 5-f1M Wi iT)

DST. EPPO

--DL

-DL

! - D.--

S-o, -

o.

_.~

w Mi lageme 1t kFina 1ci il

.ls td af ts

?eview 2nbd af ts Rehle:fF ina l -

_ eyt ej R

~ DE, D1115, it ULL ),

iUL, UlltS.

Oti.0, UL, JHD, ~

~

,_ J_

J

-- DL-

' IE DL-

-l E

. Discovery _

a Dmnnnw

  • n UCS1 F is.

Discovery & Heari na Support y_.

Dis 1

S E R. _D.i sc,o ve,ry

.__s.i.c ve

___ _ _ _.. l..

1

TMI-1 ASSIGNMENTS TESTIMONY Division of Engineering-Vollmer Intervenor Contention A/D B/C Section Leader /

No.

Lead Engineer Aamodt 9*

Muller SAB Clea ry/Roda k/Kal tman Regaa CEA 1*

Gilbert (EfS) 4*

Muller SAB Cleary/Rodak/Kal tman Regan 9

Maller UFB Nash/Petersen/Karlowicz Saltzman

)

ECNP 6*

Muller SAB Cleary/Rodak/Kal tman Regan Newberry l*,2*

Muller SAB Cleary/Rodak/Kal tman Regan PANE 1*,2*

Muller SAB Clea ry/Rodak/Kal tman Regan Shelly 2

Noonan EQB Hofmayer/Zudans Rosztoczy 12*

Muller SA3 Cleary/Rodak/Kaltnan Regan TMIA 3*

Muller SAB Cleary/Rodak/Kaltman

'~')

Regan J

6 Muller UFE Nash/Petersen/Karlowicz Sal tzman 8*

Gilbert (EIS)

UCS 6,17.

Noonan EQB Hofmayer/Zudans y

Rosztoczy

  • Deferred Psych. Stress & EIS r_ - - =.- : : =.

-L;_

J

u-Divisi6n of Systems Integration-Rcts Intervenor Contention A/D B/C Section Leadsr/

No.

Lead Engineer Aamodt

?

Kreger ETSB Bangart/Stoddart Gammill Anary 5b Rubenstein CPB Phillips Johnston 5d Kreger ETSB Bangart/Stoddart Gammill CEA 5,6,7 Kreger ETSB Bangart/Stoddart Gammill ECNP ic Check ICSB Sullivan Satterfield ld,le Check RSB Mazetis/Jensen Speis 4b,4c Kreger AEB Pasedag/Thadani Houston Lewis B

Kreger ETSB P.angart/Stoddart Ga:nnill Sholly 1

Rubenstein CSB Shapaker/Hearn Butler 3

Check RSB Mazetis/Jensen L

Speis 4

Kreger RAB Congel/Pasciak Murphy 5

Kreger ETSB Bangart/Stoddart Gammf'l p

6a Check ICSB Srinivasan/ Thatcher Satterfield b

Rubenstein CPB Phillips Johnston c,d Rubenstein CSB Shapaker/Hearn Butler e

  • = - * -

-w-

= 7m wM, g g

Divisif:,n of S:/ stems Irtpgration-Ross Intervenor "t i tention A/D B/C Section Leader /

ho.

Lead Engineer Sholly e

Kreger ETSB Bangart/Stoddart Gamill 7

Check RSB Pazetis/Jensen Speis 11 Rubenstein CSB Shapaker/Hearn Butler f

17 Kreger AEB Pasedag/ Thadani Houston THIA 1@,2@

Kreger PAB Congel/Pasciak

~.

Murphy w

7 Kreger ET5B Bangart/Stodda rt Sami11

@ - Board rray adopt & reword.

'UCS 1

Chack RSB Pazetis/Jensen Speis 2

Check RSB Pazetis/Jensen Speis 3

Check PSB

/ Rosa Rosa 4

Check PSB Fitzpatrick p

r Rosa V

5 Check RSB Pazetis/Jensen Speis 7

Rubenstein CPB Phillips Johnston 8

Check RSB Nazetis/Jensen' Speis 9

Check ICSB

/Sullivan Satterfield 10 Check ICSB

/Sullivan Satterfield 13 Kreger g

Pasedag/ Thadani

- [,',---

~

14 Rubenstein SIB

/ Wagner Stolz

-4 Division of Hunan Factors Safety-Hanauer Intervenor Contention A/D B/C Section Leader /

No.

Lead Engineer Aanodt 2

Anory 4

LQB Crocker/ Aller.spach Yassallo 5c Human Factors Tondi/ Joyce / Kelly Er.gr.

CEA 8

LQB Crocker/A11enspach x

Vassallo

<13 OLB Boger Collins ECNP 1(a)

Human Factors Tondi/ Joyce / Kelly Engr.

Sholly 13 Human Factors Tondi/ Joyce / Kelly Engr.

14 LQB Crocker/A11enspach Vassailo 15 Human Factors Tondi/ Joyce / Kelly Engr.

'~

TMIA 5

I&E-Keimig will take lead-7/1/80 Mtg.

V Emergency Preparedness Program Office-Grires l

Aamodt p

Angry ECNP NUMEROUS CONTENTIONS Newberry Sho11y Participants in Contention Response and Panel for Hearing:

Brian Grires Frank Pagano Dick Van Niel Jack Roe (? role)

John Sears (tentative)

Steve Chestnut Marvin Smith (consultant) 6 eugye-w e em M e

  • T e enum p p

I

-5 Division of Safety Technolouv-Mattson 4

A/D B/C

' Section leader /

Lead Encinee.~

t Board Q(C1.9)

Ernst RRAB

/ Israel l

Israei I

!d t

o 9

v G

s T

4 e

7,

- - ~

An 2

(== - -

=

~~

6 SER OPEN ITEMS Division of Engineering Order Item **

A/D B/C Section Leader / Lead Engineer _

6(operational Noonan QAB-Haas

/Gilray QA) 7 Muller UFB-Saltzman Nash/Petersen Division of Systems Intearation Order Item **

A/D B/C Section Leader / Lead Engineer 79-058-1 Check RSB-Speis Pazetis/Jensen 79-05B-5 Check RSB-Speis Pazetis/Jensen

'2.1.3.a Check RSB-Speis Pazetis/ Graves

  • 2.1.3.b Rubenstein CPB-Johnston Phillips (newinstru.)

2.1.4 Rubenstein CSB-Butler Shapaker/Hearn 2.1.6.b Kr eger ETSB-Gamill Bangart/Stoddart 2.1.7.a Check ICSB-Satterfield

/Fitzpatrick (design) 2.1.7.a(TS)

Check ASB-Parr

/Wermeil 2.1.8.a Kreger ETSB-Gamill Bangart/Stoddart 2.1.8.b Kreger ETSB-Gamill Bangart/Stoddart 2.1.8(B)

Rubenstein CPB-Johnston Phillips (Water Level)

I.nalyses Check RSB-Speis Mazetis/Jensen f

4(gascaus Kreger ETSB-Gamill Bangart/Stoddart ra dr,.iste) 5(solid 5'Ieger ETSB-Gamill Bangart/Stoddart radwaste)

Add. 4 Check RSB-Speis Pazetis/Jensen Long Tenn 2 Check RSB-Speis Mazetis/Jer:sen

    • For Item Description Refer to the TMI-l Restart SER Pg. B-5 thru B-10

.y.

i SER OPEN ITEPS j

Division of Huran Factors Safety Order Item N l

B/C Section Leader /t.ead Engineer 79-058-7 PTRB-Ziemann PTRB-Zie: ann 2.1.3.b (existin instru.)g 2.1.8.c PTRB-Zie.mann 2.1.9(B)

PTRB-Ziemann Proc.

6(Fac. Proc.)

PTRB-Zierann v

6(Mgt. & Tech.)

LQB-Yassallo

/Crocker 6(safety rev.)

LQB-Vassallo

/Erocker Emergency Precaredness Program Office

~

Order Item **

l B/C Section leader / Lead Engineer 2.2.2.b EPLB-Pagano

/VanNeil 3e

/

EPLB-Pagano

/VanNeil

i

    • For Item Description Refer to the TMI-1 Restart SER Pg. B-5 thru B-10 a

I r-.