ML20039F856
| ML20039F856 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/06/1982 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20039F857 | List: |
| References | |
| NUDOCS 8201130479 | |
| Download: ML20039F856 (2) | |
See also: IR 05000266/1981024
Text
.
.
IJAN 6
'E82-
.
Docket No. 50-266
D-
Docket No. 50-301
Wisconsin Electric Power Company
k'g $f)
ATTN:
Mr. Sol Burstein
C
-
Executive Vice President
te * gM
_
Jj 8
-0
Power Plants
~
84 {
231 West Michigan
f
,
/
Milwaukee, WI 53201
D . ./
'
,c'
'
-
Gentlemen:
@
This refers to the routine safety inspection conducted by Dr. M. J. Oestmann
of this office on December 2-4 and 22, 1981, of activities at the Point Beach
Nuclear Power Plsnt, Units 1 and 2, authorized by NRC Operating Licenses
No. DPR-24 and No. DPR-27 and to the discussion of our findings with Mr. Reed
and others of your staff at the conclusion of the inspection and with Mr. Zack
on December 22, 1981.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of nopcompliance with NRC requirements were identified during the
.
course of this inspection.
On April 16, 1980, you reported to the NRC a description of your ground
water tritium investigation underway to identify and isolate the leakage of
tritiated water. Although your surveys show concentrations below regulatory
limits, they appear to indicate a continuing source of tritium Icakage.
In
accordance with your commitment in the April 16, 1980 letter and our tele-
phone conversation of December 22, 1981, please provide us within thirty
(30) days of the date of this letter a current statur, of your evaluation,
including:
(1) a description of sampling locations and analytical measure-
ments, (2) pathways and flows of leakage and activity released to the
environment since the leakage was identified in 1978; and (3) your progress
in identifying and isolating the source of this leakage.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your responae to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
.
O
8201130479 820106
T'
PDR ADOCK 05000266
.O
PDR _ JJ
.
MN
-_-
.
.
Wisconsin Electric Power
-2-
Company
that you (or your contractors) believe to be exempt from disclosure under
-
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a writ. ten application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this of fice promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
'
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4).
The information sought
to be withheld shall be incorporated as far as possible into a separate
p rt of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
c
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
(
'Jh
(A.Lb
J. %. Ilind, Director
,,
,p
-
Division of Laergency Preparedness
and Operational Support
Enclosure:
Inspection
Reports No. 50-266/81-24
and No. 50-301/81-25
cc w/ encl:
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIIl
John J. Duffy, Chief Boiler
Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
.
Public Service Commission
Sandra A. Bast, Lakeshore
Citizens for Safe Energy
,
RIII
RIIIs
RIII
RJI
RI J
RII
Jff.70
Sc /
Ph
L
C/-
7p
Oestmann/so
umacher
e
i llo
li '
1 mond
ague
12/30/81
q g2
fpp
g/d <
f/q/4 *
O