Forwards IE Insp Repts 50-266/81-22 & 50-301/81-22 on 811102-30 & Notice of Violation
ML20039F360
Person / Time
Site: Point Beach  
Issue date: 12/29/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20039F361 List:
References
NUDOCS 8201120380
Download: ML20039F360 (2)


See also: IR 05000266/1981022

Text

a

,

.

.

_

DEC 2 91ag

"

O

C)

-

,9

gD

Docket No. 50-266

Docket No. 50-301

Q

tt

O

Wisconsin Electric Power Company

j/

40

-

ATTN:

Mr. Sol Burstein

Executive Vice President

-

'

Power Plants

'

O

231 West Michigan

%

~7

.

Milwaukee, WI 53201

.

This refers to the routine safety inspection conducted by Messrs.

W. G. Guldemond and R. L. Hague of this office on November 2 - 30, 1981,

of activities at Point Beach Nuclear Plant, Units 1 and 2, authorized

by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion

a

of our findings with Mr. G. A. Reed at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

i

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

-

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

c=

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

,

contains a full statement of the reasons which are the bases for the

i

claim that the information should be withheld from public disclosure.

8201120300 811229

PDR ADOCK 05000266

G

PDR

1'?/

_ _ _ _ _ _ _ _ _ _

&

_

e

.

.

Wisconsin Electric Power Company

-2-

December 29, 1981

.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report No.

50-266/81-22 and

No. 50-306/81-22

cc w/encls

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief Boiler

Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

RIII 'XE

RIII

RIII,

$'

COS

tirX

.['M,,

akohklin/jp

streeter

[.<Spessa rd

12/28/81

l'

[

'

%..