Docket No. 50-266
Docket No. 50-301
Q
tt
O
Wisconsin Electric Power Company
j/
40
-
ATTN:
Mr. Sol Burstein
Executive Vice President
-
'
Power Plants
'
O
231 West Michigan
%
~7
.
Milwaukee, WI 53201
.
This refers to the routine safety inspection conducted by Messrs.
W. G. Guldemond and R. L. Hague of this office on November 2 - 30, 1981,
of activities at Point Beach Nuclear Plant, Units 1 and 2, authorized
by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion
a
of our findings with Mr. G. A. Reed at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
i
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
-
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
c=
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
,
contains a full statement of the reasons which are the bases for the
i
claim that the information should be withheld from public disclosure.
8201120300 811229
PDR ADOCK 05000266
G
1'?/
_ _ _ _ _ _ _ _ _ _
&
_
e
.
.
Wisconsin Electric Power Company
-2-
December 29, 1981
.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report No.
50-266/81-22 and
No. 50-306/81-22
cc w/encls
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief Boiler
Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
RIII 'XE
RIII
RIII,
$'
COS
tirX
.['M,,
akohklin/jp
streeter
[.<Spessa rd
12/28/81
l'
[
'
%..