Forwards IE Insp Rept 50-483/81-25 on 811110-13 & Notice of Violation
ML20039C080
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/15/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20039C081 List:
References
NUDOCS 8112280385
Download: ML20039C080 (2)


See also: IR 05000483/1981025

Text

{{#Wiki_filter:.

. gc 15 USI p % Docket No. 50-483

  1. .

b dCs N Union Electric Company 4/pD 7 ' ATTN: Mr. Donald F. Schnell D C 7 Vice President - Nuclear H /g /A - g k{Js p % / [S Post Office Box 149 - Mail Code 400 ( 6 St. Louis, MO 63166 s 7 ' AN h/7 E' Gentlemen: This refers to the routine safety inspection conducted by Mr. R. S. Love of this office on November 10-13, 1981, of activities at Callaway Site, authorized by NRC Construction Permit No. CPPR-139 and to the discussion of our findings with Mr. W. H. Weber at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. During this inspection, certain of your activities appeared to be in non- compliance with NRC requirements, as specified in the enclosed Appendix. A written response, submitted under oath or affirmation, is required. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele- phone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be estab- lished. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which ! hheg m JJ m /K

- . , .

DEC 51981 Union Electric Company -2- contains a full statement of'the reasons which are the bases for the claim that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a ' separate part of the affidavit. If we do not hear from you-in this regard within the specified periods noted above, a copy of this letter, the enclosures, and your response to this letter will be placed in the Public Document Room. The responses directed by this letter (and the accompanying Notice) are. not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL.96-511. We will gladly discuss any questions you have concerning this inspection. Sincerely, DO:igindl Sicacd by C.E. l'orcitus,", C. E. Norelius, Director ' Division of Engineering and Technical Inspection . Enclosures: 1. Appendix, Notice of Violation 2. Inspection Report No. 50-483/81-25 cc w/encls: ' W. H. Weber, Manager Nuclear Construction DMB/Docuaent Control Desk (RIDS) Resident Inspector, RIII Region IV K. Drey Ronald Fluegge, Utility Division, Missouri Public Service Commission ! i 'RIII g RIII ) RIII RII RJI 9c (?A f e/jp. Hawki/is Williams 12/7/81 nj j}$ I I/ [2[%[[' <

- . , , - .- . . ... - - - , - , - - - ., -- - - . . - - }}