ML20039B652

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/81-34 on 811103-06.No Noncompliance Noted
ML20039B652
Person / Time
Site: Pilgrim
Issue date: 12/03/1981
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20039B653 List:
References
NUDOCS 8112230347
Download: ML20039B652 (2)


See also: IR 05000293/1981034

Text

_

totw

g . N~

Go - d U

C 3 BB1

Docket No. 50-293

e

e

Boston Edison Company M/C Nuclear

C3

ATTN:

Mr. A. V. Morisi

SEC 60

Nuclear Operations Support Manager

[

M

0

NCg0 D/%, b[

800 Boylston Street

-

Boston, MA 02199

@C

hkh

Gentlemen:

s

km

j

c

Subject:

Inspection No. 50-293/81-34

d

s

This refers to the routine safety inspection conducted by Mr. S Chaudhary of

this office on November 3-6, 1981 at Pilgrim Nuclear Power Station, Unit 1,

Plymouth, Massachusett3 of activities authorized by NRC License No. DPR-35 and

to the discussions of our findings held by Mr. S. Chaudhary with Mr. C. Mathis

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be olaced in the NRC's Public

,

Document Room.

If this report contains any information that you (or your con-

,

tractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is

necessary that you (a) notify this office by telephone within ten (10) days from

the date of this letter of your intention to file a request for withholding; and

(b) submit witnin 25 days from the date of this letter a written application to

this office to withhold such information. Consistent with section 2.790(b)(1),

any such app'ication must be accompanied by an affidavit executed by the owner

of the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons on the basis which it is

claimed that the information snould be withheld fcom public disclosure. This

section further requires the statement to address with specificity the considera-

tions listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incorpon ad as far as possiule into a separate part of the affidavit.

If we

do not hear from you in this regard within the specified periods noted above,

the report will be placed in the Public Document Room.

The telephone notification

of your intent to request withholding, or any request for an extension of the

'10 day period whi h you believe necessary, should be made to the Supervisor,

Files, Mail and

rds, USNRC Region I, at (215) 337-5223.

RIJ: TI

TI

RI:DRJT

f lI:DETI

Cha't1d[hary:cbI $p

Epfgr

h)Ebejer

f

11/2f/81

/

g

p'

4E,o I

0FFICIAL RECORD COPY

8112230347 81120 ,3'

i

PDR ADOCK 0500029

/

f

o

b

,.

,

.

Boston Edison Company

2

No reply to this letter is .equired.

Your cooperation with us in this matter is

appreciated.

Sincerely,

' h=1SL. nag 3 g 5, g g g

t

7

homas T. Martin, Director

Division of Engineering and Technical

Inspection

Enc 1csure: Office of Inspection and Enforcement Inspection

Report Number 50-293/81-34

cc:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Informat;on Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bcc:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

T. C. Elsasser, DRPI, RI

0FFICIAL RECORD COPY