ML20039B493
| ML20039B493 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/19/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20039B472 | List: |
| References | |
| 50-366-81-23, NUDOCS 8112230123 | |
| Download: ML20039B493 (1) | |
Text
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
.~
APPENDIX A NOTICE OF VIOLATION Georgia Power Company Docket No. 50-366 Hatch 2 License No. NPF-5 f
l As a result of the inspection conducted on August 21 - September 28, 1981, and in
[
accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),
l the following violation was identified.
10 CFR 50.72(a)(7) requires that each licensee of a Nuclear Power Reactor J
shall notify the NRC Operations Center as soon as possible and in all cases
(
within one hour by telephone of the occurrence of any event resulting in automatic actuation of the Reactor Protection System.
Contrary to the above, the NRC Operations Center was not notified within one hour of a reactor scram which occurred on September 9,1981, due to a main
-steam isolation valve (MSIV) closure. Notification was made one hour and twenty four minutes following the event.
This violation is applied to Unit 2 only.
This is a Severity Level V Violation (Supplement I.E.).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of.this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
The responses directed by this Notice are not subject to the clearance procedures of the Office of lianagement and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
OCT191981 Date:
8112230123 811217 PDR ADOCK 05000321-e PD_R
_ - _ _ _ - _ _ _ _ - _ ~ _.