Text
. - _ _ _ _ _ _ _ _ _ . ______-____-
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
_
. _ _ _ _ _
-
-
.
.
.
.
l
.
l
9
OCT191981
,
Georgia. Power Company
ATTN: Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
Subject:
Report Nos.(21/81-2hd 50-366/81-23
This refers to the routine safety inspection conducted by Mr. R. F. Rogers of
this office on August 21 - September 28, 1981, of activities authorized by NRC
Operating License Nos. DPR-57 and NPF-5 for the Hatch facility. Our preliminary
findings were discussed with fir. ft. Hanry, Plant fianager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in tne NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five.
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than reven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
8112230116 81121i![
, PDR ADOCK 05000321
G
,
_ _ _ _ _ _ _ _ _
1
'-
.
.
,*
Georgia Power Company
2
jggj
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/d
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/81-23
and 50-366/81-23
cc w/ encl:
J. T. Beckham, Vice President and
General fianager-fluclear Generation
fi. fianry, Plant ihnager
C. E. Belflower, Site QA Supervisor
bec u/ encl:
flRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Ibnagement Branch
State of Georgia
k
RII
RII
RII
-
VBr$
1y
v
RRo ers:dt
ownlee
PJK4 logg
10/q/81
10/ Q /81
10/ r/81